Hi all Im getting my BTO 4 room flat keys soon and i have no experience in renovation or whatsoever This is the quote i received from 1 ID that pm me here on this forum Supply labour to construct motar base for 24ft cabinet, washing machine and fridge- 650 Supply materials and labour to lay 600x600 homogeneous tiles for living room- 3240 Supply materials and labour to lay 600x600 homogenous tiles for master bedroom -1740 Supply materials and labour to lay 600x600 homogenous tiles for bedroom 2 - 1250 Supply materials and labour to lay 600x600 homogenous tiles for bedroom 3 - 1250 Supply materials and labour to construch 2x shower kerb - 180 Supply labour to install 1x storage heater - 100 Supply labour to install 1x kitchen sink tap - 100 Supply labour to install 2x set toilet accessories - 80 Supply and install 1x fix & 1x swing tempered glass showerscreen at master bedroom toilet - 400 Design and construct L Box, false ceiling for living and dining - 1500 Design, fabricate and install L32ft top and btm kitchen cabinet with solid plywood in laminate finish, ABS trimming and motion control system with 1 chest drawer + stainless steel dish rack -3840 Fabricate and install L24ft solid surface kitchen worktop - 1920 Supply labour to install cooker hood & hob - FOC Design fabricate and install L7ft casement wardrobe in HPL finish and motion control system at master bedroom- 1750 Design fabricate and install 6ft casement wardrobe in HPL finsh and motion control system at bedroom 3 - 1500 Design, fabricate and install full height L8ft tv feature in HPL finish **** room - 1520 Design, fabricate and install L8ft suspended tv console in HPL finish **** room - 1040 Design, fabricate and install L7ft suspended tv console in HPL finish at master bedroom - 910 Supply labour to paint whole house (max 5 colours) Nippon or ICI - 1300 Haulage and clear debris 300 Chemical Washing -250 Total of $ 24820 Please help advice tyvm!