Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

jaCKY777

Members
  • Content Count

    568
  • Joined

  • Last visited

Everything posted by jaCKY777

  1. Hey sunzhi, e colour scheme of ur kitchen cabinets, is a preview of my intention for my upcuming kitchen. wat color difference? u mean e vanity top? think is not real marble? (shd b cultured marble) frm e pix can see e rite side of vanity top dirty lei. olso y iznt e basin in e center btw, how cum got a guy taking pix frm e inside of e mirror?
  2. Hey Yang Guo, ur essay writing, i'l giv u A+ e 3 ID co. u mentioned, all 3 olso well-known 1. if i'm not wrong, ur ID's co is 1 of e pioneers. !!
  3. Hey Liana79B, by rite canot remove e bottom grilles dat hdb had installed. by left some ppl had it removed. wat u'd signed in e reno contract, can say its quite a preliminary quotation. once signed, - watever add-on, is gona b added in e Additional Items List. - watever minus-off, is gona b deducted frm e Signed Contract. dis 2 scenerios wil happen due 2 design changes, by u or by ID. Upon signing of reno contract, e ID will present 2 u - 2D Furnishing Layout plan - 2D Reflected Ceiling Plan - 3D / Perspective drawings all dis r coloured presentation drawings, either manually drawn or computer generated. - e drawings let u have a better idea or visualize wat's ur hm gona look like after reno. - they dun giv u dimension drawings. - ID gotta confirm with u, u olso gota let ID noes certain dimension of certain fittings. (eg. fridge & washing machine size, hob & hood etc) - dis wil facilitate e ID 2 take in2 considerations e required space/clearance needed in e carpentry. - e watever dimensions, wil b instructed 2 e carpenters thru e ID, by means of their own Construction Drawings. Most of e time, only 'they' noe how 2 read. e lighting quotation is reasonable. e top & bottom kit cabinets is computed by $ x per foot run. depends on ur kit cabinets length & $pfr. eg. top 10', bottom 10', total = $120 x 20' = $2400. Dis includes e ABS trimming edge, cutlery tray, dish rack, handles etc. It is base on normal carpentry to price. Eg of additional stuff dat cost $$$ r Concrete Stove/Sink Support, Suspended Steel Rack, Frosted Glass Doors, Stainless Steel Panel Backing etc. it olso does not includes e solid surface worktop. which is computed $ x per foot run. Blum system is additional cost, pricing by parts. Most ppl only do e top drawers of lower cabinets or e commonly use compartments. feature wall normally is computed by $ x per sq feet, though sometimes $ x per foot run. for feature wall to mount e LCD, normally its above $1k, depends on e length. tv console is computed by $ x per foot run. normally includes shelving & drawers. if its without shelving, its jus a ledge. Different $ x per foot run. !!
  4. if 'they' really wan 2 steal, they can eazily take -> - e retractable clothes drying rack; - veneer doors of bedrooms; - toilets fittings. !! dun buy e light & cheap type, think cost abt SGD$2. It can b eazily force-open. buy e heavy type, slightly smaller then ur palm size, think cost abt SGD$10. Eg of brand - Globe.
  5. Hey Yang Guo, so how's reno status? - officially handed-over? - stil shopping for furnitures, accessories? - shifted or gona move in soon? - hse-warming? - wats ur feeling rite now? !!
  6. Hey sunzhi, beri colourful, beri nice lokin 4ward ur completed reno , esp kit cabinets. - u using ceramic tiles, not homogeneous tile? - laid diagonally? !!
  7. Hey tension_z, fyi, i havnt collect keys so have not start reno yet. But i plan 2 reno < $20k. Basic stuff, no fanciful features, no wallpapers etc. Bak 2 ur qns, yes, i'd saw a few units in 79 dat had done it in under $18k Hey bonkitty, ur reno cost is abt $22.5k? ok lah, quite average liao. So u bought a 'masak', e Cuizino micowave oven to play play?
  8. Hey neighbours, fyi, there's a event Modern Living 2008 coming up at e EXPO in 23Feb08 - 02Mar08 if e ID u had tot of ngaging, is 1 of e exhibitors, u most probably b gettin a better deal then. So dun hav 2 rush & sign now. Make use of dis cumin festive season; - find out more abt e ID co's background & ID's works. - search 4 design ideas. - noe ur own budget & requirements. - decide & take action then. !! SG EXPO events link i olso heard rumours dat there wil b quite a nos. of ppl collecting keys during e las 2 wks of Feb08.
  9. Hey shutiao06, actually, i feel now is e time 2 hunt 4 ID but not signing e contract. S e festive season is cumin, by consulting e ID, u mayb able 2 tel how efficient & competent is he. Find out more abt e co & his works. If can get quotation, wil b best. Then after CNY, go SG EXPO. If ur ID's co is those regular at e EXPO, then u might b able 2 get a better deal. Fyi, there's a event 'Modern Living 2008' at e EXPO 23Feb08 - 02mar08 http://www.singapore-expo.com.sg/others_mo...sp?MonthID_in=1 Hey h4happy, i agree but now seems like The more I source, The blurer I become.
  10. Hey Yeoman, Welcome! Welcome! to Renotalk. Lots of info, tips & lobangs in e forum, check it out. Hey krismas, Welcome! Welcome! to Renotalk. u read frm pg 1 to 103? If u got e spare time. If not, read frm abt pg 80, this is wen neighbours start to collect keys, ID/contractor hunting, shopping, kpo-ing etc...
  11. Hey Alister, hmm... !! So now, - wat's e outstanding works? - wat's e outstanding payment? - wat's e reply/reponse frm Alex, ur ID? !!
  12. Hey sunzhi, personally, i feel dat if e paint color of e walls & ceiling in e living/dining/foyer area can use with a mix of green tone colours. It wld b beri nice. Olso, e shoe cabinet & feature wall, if use green color base laminate finish, it wil b nice 2. It wil bring e Bold-Statement Theme out well.
  13. Hey Simpleboi, Less is More, More is Less This phrase olways use by world reknown architects & designers. Now i gota use it 2 describe ur hm. ur tv console buy frm wher? Price? Got light green colour? Regarding e tiles in yr hse, u can ask ur ID go to e site office wher e hdb officer-in-charge of ur area is stationed. Check with e OIC. He suppose to have e tile supplier contacts. Buy frm dis supplier, his tiles sure 2 match ur existing tile. Cos they r e 1 who supplied all e tiles for all e blks in ur area. For those ppl who r doing a low-wall in e kitchen, hiding e wasing machine, it applies 2. Unless u hack/overlay with different tile pattern or design. Actually, its a kinda simple job. Ur ID can simply ask his tiler dn 2 fix e thingy.
  14. Hey Yang Guo, dat retractable clothes hanger canot throw 1. Try take bak frm ur ID. Wen u sell ur flat in e future, hdb wans dat thingy bak 1. Simple reason is dat it cums with e flat frm day 1.
  15. Hey zanie98, hows e elect thingy? Solved or stil stucked? i think its not e price of each individual pt but its e total nos. of pts dat make e whole elect job expensive. Dun 4get, e new flat cums with concealed wiring. 2 shift a existing pt, (i) hack/knock away e layer of plaster w or w/o tile, pull-out e wires, cover-up e lobang. (ii) hack/knock a new slot, run e cable in it, cover-up e lobang. Or run e cables in trunking/conduit (exposed). (iii) add new switch, socket outlet etc. So, personally i find e pricing of e break-dn not expensive. Since u'd started reno, i presume u had collected e elect plan frm hdb on keys collection day. Since u'd already signed a contract with ur ID, i believe they wil b givin or had given u (i) 2D drawing of Floor Plan with Proposed Furnishing Layout ; (ii) 2D drawing of Proposed Reflected Ceiling Plan (showing e loc of false ceiling, L-box, lighting pts) ; (iii) 3D or Perspective Drawings of selected angle (showing carpentry, features etc). My humble suggestions -> 1a) Go site. - refer to ur Elect Plan, mark-out e existing elect pts. - refer to e Proposed Furnishing Layout Plan, mark-out e proposed new pts loc. - Counter-check e existing pts & new pts. Re-consider e new pts if need 2. List dn e nos. of new pts & types of switch or cable pts. b) Go site. - refer to ur Elect Plan, mark-out e existing ceiling elect pts. - refer to ur Proposed Reflected Ceiling Plan, mark-out e proposed new ceiling pts loc. Re-consider e new pts if need 2. List dn e nos. of new pts & types of pts. c) Study e switches list & e lighting pts list. - See whether u really need dat nos. of pts anot. - Discuss with ur ID, work out a better proposal. d) Ask ur ID requote e new elect price. 2) Base on e revised list of switches & lighting pts, get another 3rd party (elect contractor), to quote u. 3) Compare e 2 price quotations, make decision. - Let ur ID noes. So he can schedule e work if u stil wana get his elect men to do. - Let ur ID noes. So he can coordinate with e 3rd party elect contractor if u wana ngage e elect subcon on ur own. (IMPORTANT cos u wldnt wan 2 run e new SCV wiring on e wall & ceiling in exposed trunking s e floor tiles had been laid. Preferably, it shd b run in conduit, embed in e cement screed, under e floor tiles) - Keep track of e reno schedule, so u noe wen u need to buy ur desire light fittings. (Dun 4get, e quotation is w/o light fittings) If u had already solved e elect thingy, 4get abt my suggestions. My 2 cents worth of suggestions b4 GST & discount. Hope it helps in one way or another
  16. Hey Sunzhi, -> CT basin - beri nice. - How much? - Buy from? -> Shower head - beri nice. - But e effective nozzle izit only frm e center round thingy? - e 'thorns' jus for show or water will sprinkler out frm e end? - How much? - Buy from? -> Kitchen cabinet - wow, can see e ggrreenn colour effect cuming out liao. -> TV console - beri nice. - wat is e material? - Izit acrylic finish instead of glossy laminate finish? (cos mi cant see e edge joint line) -> Citydesign? - Reno cost? (PM mi, if can email mi e quotation wil b best). Thks.
  17. Hey Tippy, had replied in e thread u'd jus started. Aniway, Welcome!
  18. Hey Tippy, Welcome! Welcome! to RenoTalk. U mean u r frm Toa Payoh Blk 79? Then u shd go read thru e Toa Payoh Blk 79 Kakis thread. Can noe e latest happenings in 79. But b warned, its 103 pages from yr05 up to 2day. Haha. Also, go thru e forum other threads, many info & tips & lobangs.
  19. Hey Happy!, wat vowsh mentioned is rite. But if u'r doin e normal kit cabinet, (not e suspended type with recessed light), it is advisable 2 construct e 50mm high concrete base with side tiling. If not, ur lower cabinets wil b sittin directly on e kit floor tiles. For WM & fridge, can buy off-e-shelf type of base support, 4 nos. (dunoe wats its called). Got plastic type & concrete type. Most economical way to consruct e kit sink, shd b 4 vertical supports at 4 corners with bracing, solid ply (cut hole to house sink) or horizontal bracing to hole sink. Connect e inlet & oulet pipes. No cabinet below sink, dat means can see e bottle-trap of sink & beyond !! Ngaging individual contractors for e respective works? To mi, basically, u need 2 main contractors. 1) Oversee & coordinate all works. (get hdb licensed contractor) - flooring - elect - piping - false ceiling / L-box - painting - window grilles - misc labour (eg. fix lighting & other accessories) - haulage & debris clearing 2) All carpentry (get e co dat specialise in carpentry, pay more get better quality) - kit cabinets - wardrobe - shelves. e above r my personal assumptions base on simple reno.
  20. Hey Yang Guo, sometimes old fashion thingy works better than new high-tech thingy. The old fashion thingy r there 4 a reason. So wher u got e set of metal rack dat r screwed 2 e underside of the floor slab (ur ceiling)?
  21. Hey softballer, so how's reno? Done? i had got a quotation frm Meng b4. i find dat e person i spoke 2, understand my needs & requirements. Sticked closely 2 wat i wan & gave a proposal dat is innovative & pratical. Somemore, it works out 2b below my budget.
  22. Think Stile Deseno works quite differently frm other ID co. Heard e ID wil jus take charge of e initial consultation, quotation & contract stage. Afterwhich, e project cordinator wil take over. Scheduling & cordinating e respective works til handover. Any comments & updates?
  23. Hey shutiao06, so how's hunting? If 2 accomodate yor requirements within e $15k, think shd b quite difficult for both ID or contractor. It may stil b able to achieve, but gota compromise in materials & workmanship liao.
  24. Hey, any1 got latest update of reno done by I-bridge? i olso kinda impress with their design, shown in their webby.
×