Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

shutiao06

Members
  • Content Count

    246
  • Joined

  • Last visited

Everything posted by shutiao06

  1. ok la quite true.. sooner or later also gota do it rite? haa.. btw, for gas, gota call to make appmt to turn on rite? guess tat can b done after the reno is completed rite? zen = dark woody kinda furnishings? pai sei have not reali flipped thru any home & deco mags, so duno much abt these concepts..
  2. hmm so the standing lamp is an existing one or u purchased it specially for ur house? hee. tink we shld do tat too else at nite always cant go down.. hi rav.. haa.. yeah.. seen u at the other thread too.. btw, our budget initially was also 12k max.. but seems like no ID can do it leh mind sharing ur quotation with me... juz for reference see wat kinda items u have and how much ur ID quote u.. can PM to me? thanks!
  3. hi all, ya i tink we a lot of us or rather shld b all of us shld have encountered the prob of the stained grouting (i supposed shld b the cement in between the tiles?) since the flats have been built for so long. btw, are the kitchen tiles grouting stained too? i know the living room ones are reali obvious but kitchen ones since the tiles are yellowish, din reali notice.. anyway, below are some of the items we submitted in our 1st list to hdb. the officer finally called me up yday. but earliest possible wkend appmt is nex sat - Main door & kitchen toilet door very tight and difficult to open. - Electrical supply box behind main door very loose and coming out of the wall. - All window ledge (after readin forum, i tink the correct word shld b hinge ) rusty - MBR window handle missing - Paint drip on top of switches & electrical sockets - Door stopper's magnet in all bedrooms loose - The screw on the right hand side needed to hang up the national flag missing in BR2 - Screw caps on socket missing in kitchen - Water drainage in kitchen cannot be opened. some of the items we also duno the correct terms for it.. very hard to report in words. tink muz wait til joint inspection then show it to the officer. however, we have not done detailed inspection for cracks, holes etc. this wkend MUST do it.. btw, has anyone asked hdb to revanish the parquet flooring?
  4. oops my blog's been forgotten cos not much updates haa.. anyway, still waiting for hdb to call me after submitting my 1st defect list online on mon morning. muz go down and paste maskin tape this coming wkend already haa... i tink our progress is reali slow..procastinate too much already.. btw, do u guys fix the lights urself first b4 commencing reno so tat u can actually go down to ur house at nite?? cos currently we din thus cant go at nite haa
  5. hi shootmie, congrats on ur key collection although it's nearly a wk liao hee. so have u checked or submitted ur defects? free can come over look for us wah graciegal, serious ah? ur kitchen got so small till not even 20ft? cos i tink ours is very small liao leh.. and guess wat we stil exceed the 20ft measurement most ID firms give. wana do island kind oso cant and worst still, got a stupid area which is 凹进去 one.. duno u get wat i mean or not.. reali wastage of space cos not much can b done..haiz. look at our floor map u'll know. my blog luckily i dun reali cook..so ok la.. LR big enuf then ok liao
  6. hi hi... wah seems like i'm quite slow to spam here... but better than not even participating rite hee anyway, all the best to ur reno, hope everythin goes well waiting eagerly to see more pics and oh my, u reali made quite a lot of purchases already.. btw, i like ur dual function items.. like the microwave cum oven and washing machine and dryer together. expensive not? else i'll consider too. can save money and space hee
  7. icic tat's gd. if u know wat u wan and someone trusted to do the reno for u, saves u loads of trouble hee. do keep us updated abt ur reno progress! wow reali??? aiya then i shldnt have been too kan cheong to quickly apply for utilities cos we actually enjoyed the free service too but they put down in the letter muz apply within a week ya agree with shootmie, not stayin there but need to pay for the charges for nothing
  8. Hi neighbours, 祝大家新年快乐, 事事顺利! 鼠年行好运, 钞票"鼠"不清!! Firstly, welcome to alexter & shootmie. latest list after including shootmie 675B : Spotkev, Alexter 676A : ilovecoffee, kiki2004, TinyEyes, mysotic, sengkt 676B : crazygirl48, roseberry, shutiao06, popeye gal 677A : cyanide, bpheng 677B : shootmie 677C : inuya5ha 678A : teodami, Commando, bubbletan 678B : rav3n, GraCieGaL 678D : dar80 ya i do agree tat there shld b more entrance and exits to avoid jam or long Q when coming in or getting out, especially after the occupancy rate goes up. like wat commando suggested, havin one in front of the temple is gd, so tat we can go directly into the 676 carpark hee. so anyone here has started reno or will b starting reno soon? alexter, can share who's ur contractor/ID? looking fwd to ur blog and pics we still in the midst of "shopping ard" haa.. hopefully can find a suitable one soon. very tiring to keep lookin ard for one. haiz. juz submitted our 1st list of defects on sun nite. only reported the very basic and obvious defects, haven gone into details to inspect hollow tiles and cracks etc. tink muz get started soon else duno when it'll b rectified. so far hasnt got any call yet from hdb. commando, u submitted early last wk rite? have they called u?
  9. updated list 675B : Spotkev 676A : ilovecoffee, kiki2004, TinyEyes, mysotic, sengkt 676B : crazygirl48, roseberry, shutiao06, popeye gal 677A : cyanide, bpheng 677C : inuya5ha 678A : teodami, Commando, bubbletan 678B : rav3n, GraCieGaL 678D : dar80
  10. Hi neighbour! hee.. me oso stayin at 676B. u can join in our JW St 64 chat over at the other thread here's the link JW st 64
  11. hello, actually got quite a gd impression of the ID i contacted before collecting the keys. on the day of keys collection ID sugg goin down to our house to take a look as well as help us check for defeats. i personally thought tat was very nice of him. however, been waitin eagerly from 16th jan till now stil no hear from him he stil told me on the 16th jan tat he'll call me the "next wk" but till now, not even a single call or sms !! very disappointed..was lookin fwd to it so much. haiz. either he's too bz or our budget too low
  12. hi jacky, hmm but i tink this period oso super bz for us and the ID leh haa. prob is i tink some of them might have stopped work if they have handed over all the units done by them and might b taking their holiday. esp those from msia, i guess they might have returned home. duno leh cos yday i sms an ID to arrange for viewin he mentioned he's havin his break and wil contact me again when he's back. icic.. we have not gone to any exhibitions at expo though.. tink shld go there take a look hee. but then expo is so **** far yap, happy.. i tink jacky is rite, sometimes the more we source, the more undecided and confused we get haha. i'm juz worried even we source for so many, end up the one we sign up with would they reali b as gd they claim to b or we perceived them to b? cos din have a very gd experience with the bridal studio we signed up with when we got married. also quite highly recommended in the weddin forum, and we thought they looked very sincere and gave us quite a gd deal, but quite a lot of bad experience along the way and the relationship became rather strained... hai.. perhaps juz shortlistin a few wil b better haa. hello.. hopefully we can take somemore pics when we go down again this wkend. but the house empty, haven start any reno too.. no pics to take leh haha.. o ya, btw, how much u guys got ur TV for ah? recalled u mentioned in ur blog it was a super duper gd deal hee.. tink we shld start lookin these too yap, understand wat u mean.. hopefully we can find a gd one who can work within our budget to give us a nice and cosy place hee.. at least now i tink got one quite close to our budget.. the same co u r usin
  13. oic.. so after shortlisting and comparing the 2, u guys stil find the previous one better ah? at least now cfm ur ID le, can start to focus on the design of the house.. envy envy yap very true.. at least not so restricted haha.. reali lookin fwd to tat. i tink the other 2 bunches of keys are for the locks to the main toilet and MBR toilet one hee.. we tried out all the keys
  14. oic.. thanks for the enlightenment hee. hmm then tink reali muz check properly. find flooring rather impt, cos we wont be redoing the floor haa. but heard feedback too tat after hdb changed a few pieces of the tile, the shade of the colour is diff. alamak, like tat oso jia lat. ya i do agree tat some of the parquet has very obvious gaps in between. actually heard from an ID previously tat it all depends on how fussy we r. it's actually our rights to feedback everythin we r not hapi wif to hdb. whether they wana rectify or have some excuses for it it's up to them. but i heard they norm wan the owners to close one eye too, so they purposely take a long time to do the rectification. haiz, but after spending so much on our new home, surely everyone wans it to b in gd condition rite.. as for parquet floor polishing, i heard from the ID tat it's our rites to get them to do it..else if we engage others to do, gota pay for it leh. recalled an ID quoting us $550 for it. wah everythin oso $$
  15. Yo GraCieGaL, Congrats on getting ur house keys.. finally rite? after the long wait! hee.. understand the feeling of excitedness !! haroldism ur hubby rite.. hi hi and congrats !! hopin to see more pics here and btw, have u confirmed ur ID? u guys are considering ideal house now? same for us hee which id u all liaise with? btw, ur layout is gd man.. not like ours the slanted living room one but nvm, at least we have our own place now !!
  16. yo commando, wat's putty btw? !! pai sei pai sei a bit mountain turtle hee. wow u checked the kitchen and floor tiles already ah? we haven got the time to go knock on each piece to c if they are hollow or not. tink may have to do it after cny. u reali seem to have a long list..tink ours not so much leh.. or perhaps we did not check thorough enough. i recalled someone posting that by submitting the defects list online thru the hdb website, the rectification might b faster is it? but how to do it over the net? is it the "e-maintenance" thingy on the hdb website? i find the paintin quite bad also, all the switches has got those dried off paint drips on top, and door frames not well painted too. a lot of those small "dots" of dried up paint. duno if u guys get wat i mean. and i tink the plastering of walls uneven too. wonder if they wil rectify those. and also for the parquet flooring, it's supposed to b shiny is it? duno if can ask hdb to polish for us not.. hee
  17. Hi, just wanted to check, for different IDs in the same ID firm, in this case ideal house, would they actually give different quotations? anyone has any experience getting quotes from diff IDs from ideal house? we actually got our quote from Mr K already, but juz tinking whether others might quote lower or not... but at the same time, doesnt seem to b very nice to do tat?
  18. yo neighbours, been quite long since i last posted hee. quite busy these few days. anyway, juz some updates. we went down on wkends again. sat went to check for defects and sun went to wash the floor again haa. now a bit cleaner liao yeah !! tink with a few more wash shld b better hee. anyway, din reali check in details and jia lat, til now haven submitted our defects list! omg. to tink we collected the keys on 16th jan. now a bit worried duno how long rectification would take and thinkin might need to start reno only after "qing ming" hai. the major defects i tink would b some cracks on the main door, then our MBR window the handle is missing main door and main toilet door very tight, window ledge rusty, etc. once we complied the entire list wil post it up in the other defects thread. but tat day when we collected the keys, got an ID to help us take a quick look he said basically ours quite ok. now left with wall tiles and floor tiles haven check. very lazy leh haa. tedious to go and look at every single piece, but stil no choice gota do it man anyway, anyone confirmed ur ID/contractor? our search stil on but guess gota wait til after cny then resume liao...
  19. hi happy, hmm search for ID stil on lor haa.. but cny comin soon so quite bz.. tink gota delay reno search til after cny cos takin up quite a lot of time. but tis wkend wil b meetin another 2 more for discussion. c how it goes ba. duno my requiremts too high or wat juz seems like no one i can reali click with ha.. how abt u? how's ur appmt wif gina?
  20. hey nemofc, thanks!! u're more than welcomed to spam here haa. else it gets a bit too quiet and lonely haa. hey.. how's ur rectification comin along ah? jia lat we haven even submit the defects list worried tat hdb wil take a long time to rectify the defects. noted tat u're plannin to shift in in jun. actually we are considerin jun too! so ur new home is located at?
  21. no prob tat's some ideas from the various IDs we met also hee. yap, HHS = household shelter. and yes, dinnin table somewhere ard corridor window is one sugg. haa ur head gona b bigger after u meet up wif the IDs and cant decide on which one or find tat most of them are over ur budget.. hee. juz kiddin not meant to scare u !! at least for me, tat's the case lor. budget very limited and cant find one reali within our budget yet have chemistry wif haiz. so the search is stil on actually hor, duno whether u guys know.. the water and elect i tink it's pre-turned on already! cos we din apply for utilities yet, but when we went down last sun to wash the floor, tried turnin on the tap and there's actually water! stil headache where to get water from haa.. then when we were goin back tat time, went to open letterbox, there's a letter from SP inside tellin us they've pre-turned on utilities and we gota send them back the application form within 7days, else they'll discontinue the supply. so u might wish to try !! Congrats GraCieGaL!! finally the long wait is over !!
  22. hmm taken some pics on sun.. but tink not too clear hee. view from our living room window.. nice & breezy! spent quite some time tryin to clean up the place and wash/mop the floor. actually thought dun have to do tat cos anyway when start reno oso wil dirty the place. but on the day when we went down to open door, met up wif an ID there to take a look at our place cos he said can help us to see wat the defects are. anyway, he din reali help us to look at the whole place in details but he did point out the common defects. and he told us to go down to wash the floor first so tat can c if any scratch marks on tiles etc. he said it's up to individual how high their tolerance is and c whether we can accept or not. but anyone here has any prob wif the yellowish/dirty line in between the floor tiles? i mean it's supposed to b white if we were to redo the flooring, but cos it's been done yrs back, there's a layer of dirt and appear ugly leh wonder if we could inform hdb abt tat then wil they help to change the tiles for us? oops sorry to post so much. anyway, here's the pic of the floor after hubby spent time and effort cleanin the floor with cloth. kudos to him cos i understand it's very tiring hee. aiya, but i forgotten to take the pic of the flooring b4 it's cleaned.. ok, time to nite nite!
  23. glad to see 2 new neighbours after quite some time welcome to both bpheng & bubbletan. can refer to the list below for ppl in ur same blks 675B : Spotkev 676A : ilovecoffee, kiki2004, TinyEyes, mysotic, sengkt 676B : crazygirl48, roseberry, shutiao06 677A : cyanide, bpheng 677C : inuya5ha 678A : teodami, Commando, bubbletan 678B : rav3n, GraCieGaL 678D : dar80 bubbletan - me oso slanted living room one. at 676b corridor too hee. hmm so far, the IDs we've been to were able to propose somethin. i guess not too diff to place furniture dun worry anyway, the sugg were to place dinnin table either near to window area or near to HHS. as for tv console, it's on the slanted wall near the window, but it depends on whether u guys wan to have it slanted to follow tat of the wall or try to custom make the console so tat it's straight. hmm u started to source ard for IDs or contractors? if u lookin for IDs, can ask them for their sugg too. they shld b able to come up wif something
  24. happy, nope, we wont b engagin a FSM hee. dun reali have much budget to spare for tat applefreak, hmm we actually intend to place dinning table either near to window or near to HHS. tat's also wat most IDs propose. i guess the area between HHS & bedroom 3 most likely to b living area. no choice cos tryin not to redo the scv and elect points for tv hee. oic.. actually our kitchen is very small too leh..haiz. tink quite diff to design. but for me ok la, since i seldom cook one haa. i guess u muz b a gd cook? hee LLhome, we actually went down on sun to clear the stuff away but cos we wana wash the whole place floor so end up put the stuff in our HHS. and who knows we went off forgettin abt the pineapple etc! ha. tink tis wkend gota go down again to clear it.
  25. ya, i guess so tat's y gota put the ID's skills to test.. c wat they can come up wif..either to shape the shape of the livin room or try to arrange the furniture with min space wastage hehe. haa ok pai sei .. ya i recalled i tink tat person's nick is nivle instead haa. haa i dun tink so cos i tink mayb huat kuay has more meanin wah reali ah..dun scare me leh we goin down later to clear liao leh if put for so long, then when reno start, the workers wont find the pineapple etc in their way?
×