Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

simpleguy80

Members
  • Content Count

    418
  • Joined

  • Last visited

Everything posted by simpleguy80

  1. Haha same as u. Almost 5 to 7 yrs. Ya ur area got refurbish everything but mine dun have so HDB has to refurnish for me now. So I have to wait lor........................
  2. Haha ur case and my case different loh. Your case is they got refurnish ur apartment. Mine dun have so I have to ask them to redo the tiling and so on.
  3. Haha for my case can be considered overhaul coz I change all my floor and wall tiles. So many defects here and there especially the toilet walls. Mine took a long time because CNY is near the corner and they are stopping work for so long. Ya windows very stiff and i also need to change two panes of the window coz got internal crack sian......
  4. Sorry i did not receive ur msg. Can send the details to me again? Thanks.
  5. Ya indeed have to wait for so long. It depends how much changes u have to made. Like mine undergoing major changes going to take me a v long time. Is already 5 mths liao.
  6. What is HC? U got the ID contact number? What kind of sketches? Floor plan sketches?
  7. Ya it is one of the pioneer batch for cooker. Actually, got something to tell u, not cursing u hor, my mama say the hood easily spoilt so she ask me to buy the chimney type instead. Is more reliable.
  8. Can i check the ID did the 3D pic for you free of charge or at a cost? If at a cost, how much is it? Then how do u get the IDs to do a 3D pic? Usually they give only quotations....
  9. Oh i check sorry is different model but same brand. I havent even install it how to use it haha. My mother has been using technogas all along and recently bought a new model SR-88 to replace the old model.
  10. Haha i think we bought the same cooker hod.
  11. I find that it is a bit fishy. Y must go thru the ID to view ur house? Y cannot we view ur house before we decide whether we want to engage ur ID? Sorry for my bluntness.
  12. No need to worry I think will have cause every time i see whenever there a festive coming, there will be a promotion. So Chinese New Year is approaching so I think there will be promotion ongoing. So what contractors u have? Any recommendations?
  13. U got engage ID? Who is ur ID?
  14. Does Ho Bee give an itemised quotation or as a whole quotation?
  15. I dunno can deduct a not but that time i sign up an ID he says if he never do his job well can no need to pay him the last 5% dunno is it true a not hee hee. Just verbal agreement.
  16. Need to enquire on the following procedure: -------------------------------------------------------------------------------------- Step 1: Go to your main door, standing in-line with the door frame looking out, take a compass reading (use a good engineer compass). Take 3 steps back and take another reading. Step 2: Go to the side of your house with the most windows and take a reading. Step 3: Stand in the centre of your house and take another reading. Post all these readings together with your floor plan. If possible, provide pics of both the exterior and interior of the house. --------------------------------------------------------------------------------------- For step 2 What does it mean with the most windows? Is it the most window panels or the largest window area? As seen from the floormap above, I should take my compass reading from the balcony (no window at present but going to install) or bedroom 3 (having the most window panels) By the way, I forgot how to use a compass. Can anyone teach me how to use a compass? Is there any other additional requirements that I need to take in order to have my house fengshui read accurately? Sorry for being noob.
  17. In what way old and chipped? Who is ur ID? Can visit ur house this weekend?
  18. Aiya HDB contractors are like this. They always messed up things. I last Sat went down to my house and was very frustrated that they got the colour of my toilet floor tile wrongly. In the end, I call the supervisor and screw him up to hack away the wrong floor tile and replace with my desired color. I also call HDB officer to complain. By the way what happens to ur bedroom doors that they replaced a new one for u?
  19. Wah u so fast wan to install hood n hob ah? For ur info, HDB will rectify ur defects if it is still in original shape. If u install hood or hob they can claim ur contractors make the defects. So it is advisable to install later. I also delay my hood and hob delivery, wait until HDB clear my defects first.
  20. No i never take pink kitchen floor i only take pink wall tile coz i dun like white colour tile in kitchen. At first i wan take pink floor tile but the HDB say cannot he says too rough for kitchen floor so i used the peach kitchen floor one. Where u stay? maybe can pop in to see ur ID's bases.
×