April 7, 200917 yr hi, Been reading this forum for a while, finally got my dream unit. Tmr will be going for my first appt, have been going to some ID for the past few days, the price they quoted are between 22k-25k Below is a quotation i got: HACKING & HAULAGE OF DEBRIS 1 Hacking & Haulage of Debris of Living Room Floor Tiles $ 650 2 Hacking & Haulage of Debris of Kitchen Wall Tiles $ 900 3 Hacking & Haulage of Debris of Kitchen Floor Tiles $ 480 4 Hacking & Haulage of Debris of Concrete Sink & Stove Support $ 100 5 Removal & Haulage of Debris of Existing Kitchen Cabinet $ 150 6 Hacking & Haulage of Debris of 1 Living Room Wall Tiles $ 150 7 Removal & Haulage of Existing Cornices & L-Box $ 100 Sub-total = $ 2530 MASONRY WORKS 8 Supply & Lay 600 x 600mm Homogeneous Floor Tiles in Living Room $ 1650 Max: $3 Per S/Ft 9 Supply & Lay 300 x 600mm Homogenous Wall Tiles in Kitchen $ 2900 Max: $3 Per S/Ft 10 Supply & Lay 600 x 600mm Homogeneous Floor Tiles with Cabinet $ 1200 Base in Side Tiling, Washing Machine Base in Full Tiling, Fridge Base in Full Tiling Max: $3 Per S/Ft 11 Construct & Erect 1/2 Height Brick Wall Behing Sink in Full $ 380 Homogeneous Tiling - 5 Ft (L) x 39"Inches (Ht) x 3"Inches (W) Sub-total = $ 6130 LAMINATE FLOORING 12 Supply & Overlay POWER DEKOR Laminate Flooring in 2 Bedrooms $ 1520 Complete with Skirtings Sub-total = $ 1520 PAINTING WORKS 13 ICI Painting for Whole House (Wash & Wear Range) $ 900 14 Sealer Undercoat for Plastered Wall & Cracks in Walls $ 100 Sub-total = $ 1000 ELECTRICITY WORKS 15 Rewiring of Electricity for Whole House at New Points $ 1500 Consists Of:- - 9 Nos. Lighting Points - 1 No. Single Power Point, 9 Nos. Double Power Points - 1 No. Heater Points - 1 No. SCV Point - 1 No. Telephone Point - DB Box - Piano Switches for all Switch Points PLUMBING WORKS 16 Supply Labour & Material for Cold Water Pipings in Whole House $ 750 CARPENTRY WORKS IN KITCHEN 17 Design & Fabricate Kitchen Cabinet (Top & Bottom) - 22 FT $ 2420 **Complete with Aluminium Designer Handles, 2 nos. Frosted Glass, 1 no. Stainless Steel Dish Rack, 1 no. Cutlery Tray, Cabinet Door Stopper Enhancer 18 Supply Labour & Material to Install Solid Surface Work Top with $ 660 Skirtings & Front Profile - 11 Ft 19 Supply & Install New Stainless Steel Dustbin - 1 No. $ 180 20 Supply & Install Tempered Sliding Glass Door with Top Hung Tracks & $ 750 Stainless Steel Round Handle - 10mm Sub-total = $ 4010 MISCELLANEOUS 21 Lay Corrugated paper for floor protection FOC 22 Haulage & Removal of Debris FOC 23 Acid wash for Whole House upon Completion FOC LESS DISCOUNT : - $ 740 SUB-TOTAL: $ 16,700 OPTIONAL ITEMS HACKING & HAULAGE OF DEBRIS 24 Hacking & Haulage of Debris of 2 Toilets Floor Tiles $ 550 25 Hacking & Haulage of Debris of 2 Toilets Wall Tiles $ 350 Sub-total = $ 900 MASONRY WORKS 26 Re - construct Toilet Package (Bath Toilet) : @ $2500 $ 2500 Package Includes:- Floor & Wall Homogenous Tiles, Waterproofing Membrane, 1 Towel Rack, 1 Toilet Bowl worth $290, 1 Mirror, 1 Bi-Fold Door, 1 Sink Ponding Test Max: $3 Per Sq/Ft 27 Supply & Lay 300mm x 600mm Homogeneous Wall Tiles in Toilet $ 950 Max: $3 Per Sq/Ft 28 Supply & Lay 300mm x 300mm Homogeneous Floor Tiles in Toilet $ 250 Max: $3 Per Sq/Ft 29 Supply & Install Aluminium Frame PVC Bi-Fold Door in Toilet - 1 No. $ 200 Sub-total = $ 3900 GRAND TOTAL : $ 21,500
Create an account or sign in to comment