err....how old is the flat, how big ar? How come no attached bathroom for one of the room to be known as MBR?

Sorry, now then see ur post aft browsing thru old postings :P

This is a super old flat. think >30 years liao :faintz:

But good location lor.

 

Share this post


Link to post
Share on other sites

Hi folks, my fren has confirmed with Alan. Start date is set on 10.06.09

The reno items are as follows:

A. HACKING WORK

Hack off existing floor tiles **** & 3 bedrooms

Hack off existing floor tiles & wall tiles at kitchen & 2 toilets

Hack off 4 door frames

Dismantle false ceiling at bedroom entrance

Dismantle kitchen cabinets, living hall cabinet & 1 wardrobe

B. MASONARY WORK

Supply & lay 600x600mm polished homogeneous tiles **** &

3 bedrooms c/w skirting (tile: S$3.00)

Supply & lay 300x300mm homogeneous tiles at kitchen floor

Supply & lay 300x450mm wall tiles at kitchen to ceiling height

(tile: S$3.00)

Supply & lay 300x300mm homogeneous tiles at 2 toilets

Supply & lay 300x450mm wall tiles at 2 toilets to ceiling height

(tile: S$3.00)

Supply & lay waterproof membrane for 2 toilets

Construct shower kerb in bathroom + kitchen

Construct kitchen cabinets base, top plaster with cement & skirting

with tiles

Contruct fridge base & washer base with tiles

Construct beam & hollow block top bedroom door

C. PLUMBING /SANITARY WORK

Install a W/C sitting bowl

Install a basin

Supply & install stainless steel pipe for whole unit

Supply & lay pvc drainage pipe for sink & washer

Supply & install S/S rubbish chute

D. Wrought Gate

Supply & install wrought iron gate

E. DOORS

Supply & install 3 classic doors for bedrooms

Supply & install a Nyatoh solid main door (non-fire rated)

Supply & install 2 sets of aluminium frame with acrylic panels

bi-fold door for 2 toilets

Supply & install 4 wooden door frames for bedrooms

Supply & install 10mmT tempered glass swing door at kitchen

F. PAINTING

Supply materials & labour to paint whole units, including ceiling

& door frames & pipes with ICI/Nippon emulsion

G. CARPENTRY

Supply & install 36 ft kitchen cabinets, L-shape with solid ply wood

laminated finish + ABS trimming doors

Supply & install solid surface table top, L-shape 16 ft

Supply & install a 10ft TV console & feature wall **** room

Supply & install a 3ft shoes cabinet (half height) next to main door

Supply & install a 3.5ft sideboard in living room

Supply & install a 10.5ft casement door wardrobe at corridor

bedroom

Supply & install a 6ft casement wardrobe in bedroom 2

Supply & install a 10ft L-shaped casement wardrobe in MBR

(c/w pull-out dressing mirror)

Supply & install a 3.5ft TV console & feature wall in MBR

H. CLEANING & HANDOVER

Clear all debris

Lay protective cardboard over new floor tiles

Acid Wash

Total: S$30,000

(maybe adding more items, so think should be slightly higher:P)

Edited by rdnest
 

Share this post


Link to post
Share on other sites

Tiles for the whole house has been chosen from Sin Lek Building Materials P/L at 70 Eunos ave 7.

The salesperson, Jasmine was very helpful and friendly.

Glossy tiles for living & bedrooms

IMG_0407.jpg

1st tile from top is for Kitchen floor. 2nd for kitchen wall (abit wave surface)

The rest not selected. for show nia :P

IMG_0410.jpg

Bathroom tiles. All will be in white (same design) but only the shower area has a row of yellow with 2 strips of mosaic running along at 2 sides of yellow.

IMG_0406.jpg

Toilet tiles. All will be in white (same design) but only the wall facing the toilet door has a row of green with 2 strips of mosaic running along at 2 sides of green. The picture is not so clear to show the shimmering glitters in some of the green mosaic. very pretty :)

IMG_0405.jpg

Edited by rdnest
 

Share this post


Link to post
Share on other sites

The white one is the wavy kitchen wall tile + orange tiles that will only for the wall between top& bottom kitchen cabinets. So it means no need to do backsplash...save $$ :P

IMG_0400.jpg

Closer look of the orange tile

IMG_0403.jpg

 

Share this post


Link to post
Share on other sites

actually after choosing the tiles, my fren wants to change the layout...yet again :faint:

Alas, he can't help but feeling strange w/o a storeroom. Initially he planned to make one at one corner of the kitchen. It was later replaced by the cooking hob after the advice of FSM. Now, he hope to make one directly opp the hob. meaning the washer & dryer hv to give way and re-settle at middle of kitchen. washing basin thus got to make against chute wall so as to make more walking space rather than L-shape.

And L-shape wardrobe in MBR is also scrapped as he wants more space in MBR so tt his bb gal can bunk in (with her bb cot). His workdesk is tucked in a corner of his bb's rm. not custom made. think should be getting one from ikea or somewhere...

here is, (hopefully) the final plan :

floorplan4.jpg

 

Share this post


Link to post
Share on other sites
wah... mm so much more carpentry than me.. but add 5k only... *sob* I should have done some.

Congrats to your friend!!

Yalor. me see liao oso super heart bang :bangwall:

Why my reno so much earlier? :bangwall::bangwall:

 

Share this post


Link to post
Share on other sites
nice choice of colours

thanks :P

his colour is mainly white/light colour tone. so use abit of loud colour to bring some life :)

 

Share this post


Link to post
Share on other sites

Just done up a 3D layout for the kitchen. :paint:

This shows the Un-L washing basin. straighten up looks more neat or not :P

Below cabinet cannot hv drawers type cos got rubbish chute inside :unsure:

Kitchenlayout3D.jpg

This show the newly added store area. The program dun hv sliding door selection, me use tall cabinets to illustrate.

Most likely the area will be built-up & using folding doors.. cheaper

Kitchenlayout3Da.jpg

Edited by rdnest
 

Share this post


Link to post
Share on other sites

oso the washer & dryer will b stacked up, instead of side-by-side to save floor space.

 

Share this post


Link to post
Share on other sites

Just to update: Dismantiling started on 10.06.09 and hacking started on 11.06.09...

Uploading of hacking work pictures soon :)

 

Share this post


Link to post
Share on other sites
Just done up a 3D layout for the kitchen. :paint:

This shows the Un-L washing basin. straighten up looks more neat or not :P

Below cabinet cannot hv drawers type cos got rubbish chute inside :unsure:

Kitchenlayout3D.jpg

So many cabinet?? Your frnd not using hood?

 

Share this post


Link to post
Share on other sites
Just to update: Dismantiling started on 10.06.09 and hacking started on 11.06.09...

Uploading of hacking work pictures soon :)

mmm sounds fast... so by today should have finished hacking and can clear tmr? :)

 

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  

×