Jump to content
Find Professionals    Deals    Get Quotations   Portfolios
Sign in to follow this  
upnorth

Suisui House Start Reno

Recommended Posts


Join 46,923 satisfied homeowners who used renotalk quotation service to find interior designers. Get an estimated quotation

After tiling, next will be plastering liao. Now the walls and ceiling are full of holes. It will take at least a few days to plaster whole house.

Edited by upnorth
 

Share this post


Link to post
Share on other sites

Hopefully can update more picture this weekend when all the debris are clear.

Hope to see a neat house after plastering.

The sanitarywares will deliver this Saturday and air con next Friday :rolleyes:

 

Share this post


Link to post
Share on other sites
the tiling looks great...love the MBR toilet....looks very classy

Thanks. All tiles selected are ok except the foyer. We didn't expect it to be so uneven :(

Edited by upnorth
 

Share this post


Link to post
Share on other sites

is it the wall tiles? but i thought that's the effect....my cousin's house also did something like that....very rustic look....just do some deco around the area and will be very comfy....

 

Share this post


Link to post
Share on other sites
is it the wall tiles? but i thought that's the effect....my cousin's house also did something like that....very rustic look....just do some deco around the area and will be very comfy....

No, it is the foyer floor tile. The surface is like wood grain texture.

ya, we are going to put a water feature and some plants at the foyer.

 

Share this post


Link to post
Share on other sites

Picture Update

Pictures before plastering

Photo0104.jpg

Close look on foyer floor tiles

Photo0094.jpg

Foyer walkway to Living Room (View from main door)

Edited by upnorth
 

Share this post


Link to post
Share on other sites

Photo0106-1.jpg

Foyer view from Living Room 2

Photo0096-1.jpg

Finally MBR walls were up. Can see the new layout of the MBR :D

Photo0107-1.jpg

The W/M base.

Edited by upnorth
 

Share this post


Link to post
Share on other sites

Plastering has completed. It make the whole house looked bright and spacious.

Below are pictures taken after plastering completed

DSCN2509.jpg

Living Room 1 and Dining Room

DSCN2510.jpg

Living room 2 and rooms walkway

 

Share this post


Link to post
Share on other sites

Aircon installed last Friday. Workmanship is :good: and thks Yeak assistance.

DSCN2518.jpg

Compressor in MBR and Yeak will box it up.

DSCN2520.jpg

Aircon trunking on ceiling. The ceiling will be cover.

DSCN2524.jpg

Blower in my daughter's room.

Overall, we are happy with their works.

Edited by upnorth
 

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  

×