Thinking to manage renovation by directly getting contractors to do work for areas they specialize in. But I understand getting the sequence will become crucial.. Like some advise on whether it is advisable to do in the following sequence:

P.S. Mine is resale so 10 yrs old liao :P

1. Hack everything that needs to be hacked!

2. Hack existing storeroom to *** to bedroom

2. Patch up walls with holes/ cracks/ chipped

3. Seal up maid toilet to convert to storeroom

3. Do flooring (includes doing stand for fridge and washing machine..)

4. Change aircon system + change trunking

5. Do false ceilings

6. Kitchen

7. Carpentry (new wardrodes, TV console, wooden feature wall, etc)

8. New coat of paint

9. Varnish parquet floor

10. Polish marble floor

11. Do up doors (thinking to laminate)

12. Install gate

After listing all these.. I realize a lot of work... *apprehensive but EXCITED at the same time!* :P

Edited by fattyfatfat
 

Share this post


Link to post
Share on other sites
Looking for good contractors? Click here for your request

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  

×