fattyfatfat 0 Report post Posted August 15, 2010 (edited) Thinking to manage renovation by directly getting contractors to do work for areas they specialize in. But I understand getting the sequence will become crucial.. Like some advise on whether it is advisable to do in the following sequence: P.S. Mine is resale so 10 yrs old liao 1. Hack everything that needs to be hacked! 2. Hack existing storeroom to *** to bedroom 2. Patch up walls with holes/ cracks/ chipped 3. Seal up maid toilet to convert to storeroom 3. Do flooring (includes doing stand for fridge and washing machine..) 4. Change aircon system + change trunking 5. Do false ceilings 6. Kitchen 7. Carpentry (new wardrodes, TV console, wooden feature wall, etc) 8. New coat of paint 9. Varnish parquet floor 10. Polish marble floor 11. Do up doors (thinking to laminate) 12. Install gate After listing all these.. I realize a lot of work... *apprehensive but EXCITED at the same time!* Edited August 15, 2010 by fattyfatfat Share this post Link to post Share on other sites