Jump to content
Find Professionals    Deals    Get Quotations   Portfolios
Sign in to follow this  
PocketMonster

Advice On Renovation Quote

Recommended Posts

Hi fellow Renotalk users,

I need advice on the below quotation for a 3 rm resale flat, is the quotation reasonable? Quotation done by ID. Thanks alot.

.

1

Demolishing Works

To Supply Labour And Materials To Hack And Dismantle The Existing Following Items :-

a) 2 Nos. Sanitary Ware At Borth Common & Master Bathroom

900.00

b) 2 Nos. Wash Basin At Kitchen & Master Bathroom

c) 2 Nos. Bi-fold Doors At Both Master & Common Bathroom

d) Window Grills For The Whole House

e) Windows For The Whole House

f) Aluminium Casement Doors Below The Sink & Stove

g) Cornices At The Living

h) Air-con For 2 Bedrooms

2

Plumbing Works

To Supply Labour To

a) Install 2 Nos. Sanitary Wares At Both Common & Master Bathroom

400.00

b) Install 2 Nos. Wash Basin & Taps At Kitchen & Master Bathroom

c) Replace Existing Piping To Stainless Steel Piping For Whole House

700.00

d) Install 2 Nos. Of Mixer Point At 2 Shower Areas (Hot Water Only)

100.00

e) Labour To Install 2 Nos. Of Mixer Tap At 2 Shower Areas

60.00

f) Labour To Install 2 Nos. Of Hand Shower Set

40.00

g) Labour To Install 2 Nos. Of Chrome Handy Spray C/W Mini-Valve

F.O.C.

h) Labour To Install Bathroom Accessories

F.O.C.

3

Electrial Works

To Supply Labour And Materials To

a) Rewire Whole House C/W New MCB Box / Standard Power Points / Lighting

1,900.00

Points / SCV Points / Telephone Points And Installation Of Lights

(Includes :- Living - 2 Double, 1 SCV, 1 Tel, 1 Doorbell, 1 Lighting Point,

M/Bedrm - 1 Lighting Point, 1 Air-con, 1 SCV, 1 Tel, 1 Double,

C/Bedrm - 1 Lighting Point, 1 SCV, 1 Tel, 1 Double,

Kitchen - 2 Lighting Points, 2 Double, 1 Single, Store - 1 Light

M/Bathrm & C/Bathrm - 1 Lighting Point, 1 Heater Point

Sub - Total (S$):

4,100.00

Item

Description

Amt (S$)

3

Electrial Works

To Supply Labour To

b) Install Additional 8 Nos. Double Points (Living - 1, M/Bedrm - 1, C/Bedrm - 3,

560.00

Kitchen - 2, Store Room - 1)

c) Install Additional 4 Nos. Single Points (Living - 2, M/Bedrm - 2)

200.00

d) Install Additional 4 Nos. Lighting Points For "L" Box Lighting

152.00

e) Install 2 Nos. Cat 6 Data Points At Master & Common Bedroom

200.00

f) Install 1 No. Lighting Point Infront Of Store Room

38.00

4

Painting Works

To Supply Labour And Materials To Paint Whole House Using ICI / Nippon

1,200.00

Emulsion Paint.

5

Door Works

To Supply Labour And Materials To

a) Install 2 Nos. Bi-Fold Doors At Both Common & Master Bathroom

600.00

b) Install 9 Nos. Aluminium Casement Doors Below The Sink & Stove

800.00

6

Aluminum Window Grilles Work

To Supply Labour And Materials To

a) Install Window Grilles (Silver / Bronze) For Living, Master & Common

750.00

Bedroom & Kitchen

b) Install Windows (Silver / Bronze) For Whole House - (Casement - Living,

2,600.00

Master & Common Bedroom, Kitchen, 2 Bathrooms (Adjustable Louvre) With

Tinted Blue Glass

7

Plastering Works

To Supply Labour And Materials To

a) Plaster The Whole House Wall & Ceilings Including Kitchen & 2 Bathrooms

1,950.00

Ceiling

8

False Ceiling Works

To Supply Labour And Materials To

a) Erect "L" Box **** Room

900.00

b) Install False Ceiling Infront Of Store Room

300.00

c) Seal-Off The Opening Above The Door Frame For 2 Bedrooms & Store Room

750.00

9

Carpentry Works

To Supply Labour And Materials To

Kitchen Area

a) Construct 20ft Top Kitchen Cabinet Using Solid Plywood C/W Dish Rack With

2,700.00

Laminate Finishing And ABS Trimming

b) Box-Up Kitchen Sewage Pipe Using Solid Plywood

480.00

c) Construct 3ft Full Height Cabinet Using Plywood With Laminate Finishing And

750.00

ABS Trimming

Sub - Total (S$):

14,930.00

Item

Description

Amt (S$)

9

Carpentry Works

To Supply Labour And Materials To

Master Bedroom

a) Construct 17ft Top Cabinet Using Solid Plywood With Laminate Finishing

2,295.00

And ABS Trimming

Living

a) Construct 3½ft Full Height Shoe Cabinet Using Solid Plywood With Laminate

700.00

Finishing And ABS Trimming

Common Bedroom

a) Construct 16ft Top Cabinet Using Solid Plywood With Laminate Finishing

2,160.00

And ABS Trimming

10

Others

To Supply Labour And Materials To

a) Change The Acrylic Panel At Common Bedroom

500.00

b) Change 2 Shelvings Tiles **** Room

400.00

11

General Works

To Supply Labour And Materials To

a) Apply HDB Permit

F.O.C.

b) Lay Corrugated Paper Prior For Renovation Works

F.O.C.

c) General Cleaning Upon Completion Of Renovation Works

F.O.C.

d) Hoisting Materials And Clear Debris Off Site

400.00

Sub - Total (S$):

6,455.00

Grand - Total (S$):

25,485.00

SINGAPORE DOLLARS: TWENTY FIVE THOUSAND FOUR HUNDRED AND EIGHTY FIVE ONLY.

 

Share this post


Link to post
Share on other sites
Looking for good contractors? Click here for your request

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  

×