Blog Entry Date: 12th November 2017 Sunday Click Here to go back to Page 1 - Table of Contents End of 8th Week after Key Collection -
Glass Measurement, Plumbers installed Sanitary Fittings and More
I'm so, so sorry!
I should have posted this blog entry much earlier, but there was simply so much
action these 2 days that I didn't have time to properly sit down and write the blog.
Pardon me lah, also having a bad flu these few days. This crazy weather.
One minute sunny, next minute rainy. *Cough* *Cough* Ahem ahem.
Well, because it was so action packed, I'm gonna do a double post what happened on Friday and Saturday.
---------------------------------------------------------------------------------------------
So moving along, Friday (10th November 2017) was really an action packed day.
Firstly, the Glass Company people came onsite and did their measuring of the glass works that I require.
Glass is required for the Kitchen Glass Backing, and also that panel of Tempered Glass I have in the Bathroom next to my Bathroom Vanity Storage.
When they arrived, they whipped out this futuristic looking gadget!
Just look at how futuristic it looked when they were measuring!
They were shooting lasers everywhere!! LOL!! Pew Pew Pew!!
Unfortunately I didn't manage to find out what the device is called,
but apparently its supposed to shoot out some lasers and when correctly aligned,
will allow them to get exact measurements. So High Tech!!
If there are any Tech Saavy Readers out there who do know what this device is,
please do share what it's called, and what exactly it does! *intrigued*
---------------------------------------------------------------------------------------------
Okay moving on to the main event, Friday was the day the Plumbers came to do the plumbing
and fix up all my sanitary fittings. Finally, after so long I can finally take a bath and properly use the toilet!! You have no idea how GOOD it felt to finally do this!!
Check out the many tools they brought to do Plumbing.
So many barang barang! See until eyes blur liao.
Now I finally know what this strange U-Shaped thing is in the Bathroom.
Its a pipe thats specially meant for folks who do Storage Tank.
Plumber need to manually cut and connect piping to the Storage Tank.
If you are doing Instant Heater instead, this U-Shaped thing will not be touched.
While installing the fittings, we ran into an issue.
Apparently when I bought my Stone Bowl Basin, they told me I did not buy something called a "Multi-Link".
It is a kind of stopper that while optional, is good to have because if you don't have this installed,
the Stone Basin may start developing cracks over time.
This thing has a rubber lining that helps prevent such cracks from happening.
Initially I was abit skeptical about it and thought the Plumbers wanna sell some extra stuffs.
But meh, at only $25, I figured why not just buy lor. Better safe then sorry I guess.
Having this thing installed means the Stone Basin is no longer sitting directly on the Quartz Top,
but I thought it was okay as it makes it a little bit easier to clean the bottom I guess.
---------------------------------------------------------------------------------------------
Plumbers hard at work.
Really fascinating to see 3 people squeeze into my tiny bathroom to do work.
Installing piping at Kitchen Sink area
Working on the piping at the Refridgerator area.
Installing my Towel Rack that I bought from SaniQUO.
---------------------------------------------------------------------------------------------
Sanitary Fittings finally completed
Kitchen Sink and Tap
It looks abit old-school yes, but I love how strong the water pressure is for this tap.
Stainless Steel Sink is Undermount. Make sure the Kitchen Sink you buy is at least 1.2mm thickness.
It may cost abit more, but it will be more dent resistant.
Bathroom Basin and Tap
OMG Looks so Classy!!! Got Hotel Standard or not?
It'll look even nicer when my Warm White LED strip is installed!
Towel Rack
I made sure they installed this one just high enough so I wouldn't knock my head on it
when I enter the bathroom, or get up from the toilet bowl after doing my business.
2 x Glass Corner Shelves
Very convenient for me to put my Shampoo. I like the black and chrome contrast!
Toilet Paper Holder
Nothing special, just a holder with a cover.
Toilet Bowl
Again, nothing special, I used back HDB's default Toilet Bowl.
GROHE Shower Head and Mixer
While the thing itself fitted nicely, I'm a little disappointed that Water pressure
from the GROHE Shower Head was just so-so only.
At first I was like "Oh dear...is it because my place water pressure is naturally low?"
(What ive read is that sometimes High floor water pressure is lower then lower floors)
Guess what?
I changed the GROHE Shower Head to HDB's default shower head and to my surprise,
the water pressure was MUCH BETTER!?!? What!?!? This is the water pressure from the GROHE Shower Head
This is already set at maximum. Feels only so-so. This is the water pressure from HDB’s Default Shower Head
Notice how much more stronger it is?
So Dear Readers, Lesson Learnt.
Don't just throw out HDB's default fittings, they may sometimes work better!! Ariston 20L Andris Slim Storage Water Heater
I really like how it looks so slim and tucked away nicely out of sight.
According to official specs, its supposed to take 20 mins for water to actually heat up.
I know right? Who can wait 20 mins so long? In actual usage however, it took only
about 5 minutes or so to feel hot water already. I guess the 20 mins is an estimated
time for maximum heat. (If u want to boil eggs in the bathroom lah!! )
This Bidet Spray I bought is POWERFUL!
Really no joke, the water pressure on this thing is so strong, confirm no problem getting rid of....ahem....extra residue.
And I like it that I can set it so that it can constantly shoot water continuously without the need to keep depressing the button.
---------------------------------------------------------------------------------------------
Other than Sanitary Fittings, I also engaged the Plumbers to help with Non-Plumbing stuffs, and they also did a very good job.
Got them to help measure and hang my 2 paintings nicely.
This guy was so fast, so precise in measurement that the paintings were hung up in no time.
One shot settle, didn't need to adjust again and again. Paintings were also very well secured.
Really must see to believe how fast and skillful he was at measurement and installation.
Also, this Marathon LCD Clock that I want installed to the wall.
Not interested in Analog Clocks, and thought this LCD digital one fits in nicely with my aesthetics.
Too bad it doesn't have backlight. Again, installation was fast and accurate.
And of course I got him to install my IKEA Curtain Poles!!
Abit kiasu here, I went and got more L-Brackets and instead of my proposed 3 L-Brackets,
I got him to install 4 L-Brackets on each side, just to make sure the IKEA poles don't fall.
Measurement and installation of the L-Brackets is alot harder then I thought,
and he took abit more time here doing measurements. But the end result workmanship was still excellent.
I'll just put in a teaser image here, also I did not hang up the curtains yet because the place is still very dusty.
Anyway more images of curtain installation (complete with curtains) will be uploaded as a separate
Part 3 of my IKEA Curtain Guide. So do stay tuned for the conclusion of that guide!
---------------------------------------------------------------------------------------------
Wanted them to install some shelves too, but I was so disappointed with this S-shaped shelves I got from Lazada.
The product is supposed to look like this. What actually arrived looked like this
It looked so flimsy and badly worn with laminates chipped off
and the whole thing looked so cheapskate. Bleagh what a waste of money.
I'd rather not waste my wall space on something so ugly.
I did buy some good looking IKEA shelves but I simply can't picture where I can install them nicely,
so I didn't install them. Better to not install, then install already and regret later.
Meh~ I'm pretty sure I can hire Handyman services to help install any shelves I intend to get later.
Just need to spend abit more money lor.
And so thats it for my updates for End of 8th Week, Friday 10th Nov 2017.
What do ya'll think of the workmanship?
Stay tuned for the next post!! Click Here for the Next Blog Entry: End of 8th Week after Key Collection – Installed shelves for DB-Box, Solving Electrical Issues and a Special Look at the Completed Works so far!! Click Here to go back to Page 1 - Table of Contents