Skip to content
View in the app

A better way to browse. Learn more.

RenoTalk.com ™

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.

Leaderboard

Popular Content

Showing content with the highest reputation on 10/28/21 in all areas

  1. not good time to start physical work but should be ok to start with the search for architects and PE for design of the house and structure. also do some prep work like buy SIP, DIP, doing topo survey, buy original plans from BCA, soil investigation so the appointed architect and PE can work on their design. all these could take about 6 months (if take time to do slowly) and if URA and BCA doesn't approve at first submissions, it could be at least 8 or 9 months before the necessary approvals are obtained for start work. after got approvals then source for builder could take another 2 months to confirm builder. So all in all, it would be 1 year from now already and things might have gotten better and prices come down a bit.
  2. there is no longer a need for 45 degree slope for attic. what is needed is that the attic structure falls within the 45 degrees spring line which demarcates the building envelope. I've seen quite a few new houses built with no 45 degrees slope for the attic at all and done with steel roof structures.
This leaderboard is set to Singapore/GMT+08:00

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.