    Try the shophouses at 277 Kranji Way... plenty of hardware shops selling....make sure you check with your carpenter what is the depth of the drawers and get accordingly... I'm using the 560H (tandem plus blumotion) series, make sure the dealer sells u one pair of runner and the locking device as a complete package; if the locking device is missing, the runners will not be firmly seated at the drawer base. More details are available for PDF at their Blum website.
  2. 1 point
    Up till now, the sequence is like this: - Demo (9 Sept, 13 Sept) - Clearing (14 Sept) - Upload materials (14 Sept) - Tiling bath/WC floor, kitchen wall, install door frame (15 Sept) - Tiling living room/bedrooms, grouting, cementing door frame (16 Sept, 17 Sept) - Rework tiling living room/kitchen, gas-meter relocation, grouting, touchup (18 Sept, 20 Sept) - Delivery of sink, taps, etc (21 Sept) - AC rewiring (22 Sept, 16 Oct) - Windows (23 Sept) - Plumbing/aircon piping & condenser installation (24 Sept) - Ceiling works (28 Sept, 29 Sept) - Painting works (01 Oct, 02 Oct) - Installation of aircon FCU (02 Oct) - Lighting and switches installation (05 Oct) - Acid cleaning and touchup (06 Oct) - Carpentry (07 Oct, 13 Oct, 16 Oct) - Glassworks (07 Oct, 12 Oct) - OpenNet installation (13 Oct) - Installation of window grilles (13 Oct) - Installation of doors (13 Oct) - Handover (30 Oct)
This leaderboard is set to Singapore/GMT+08:00

×