my sis got her first quotation...any thoughts on this quote? personally I just feel its a little confusing for me to understand....
Space Planning & Furniture Layout
Design & Soft Furnishing Consultation
Materials & Colour Proposal
3D Computerized Perspective Drawings
Project Co-ordination & Site Supervision
Warranty with Guaranteed after Sales Service
All Necessary Authority Permit Application
5-Rooms Resales HDB package. $ 18,088.00
Demolition Works
Hack off existing flooring tiles & skirting ****, dining and store
Hack off existing skirting at all bedrooms
Hack off existing flooring tiles at kitchen and 02 bathrooms
Hack off existing wall tiles at kitchen and 02 bathrooms
Hack off existing cement mortar bases & concrete slab support
Hack off existing kitchen & bathroom's doors and frames
Hack off existing bathroom's fitting and accessories
Hack off existing kitchen cabinet
Masonry Works
Supply & lay 600mm x 600mm polished homogenous floor tiles c/w skirtings ****, dining and store
Supply & lay HDF laminate flooring c/w skirting at all bedrooms
Supply & lay 300mm x 300mm matt-surfaced homogenous floor tiles at kitchen & 02 bathrooms
Supply & provide HDB standard regulation water proofing membrane at kitchen & 02 bathrooms
Supply & lay ceramic wall tiles up to ceiling height at kitchen
Supply & lay ceramic wall tiles up to ceiling height at 02 bathrooms
Construct 50mm ht cabinet base with side tiling
Construct 50mm ht fridge base with complete tiles up
Construct 50mm ht washing machine base with complete tiles up
Construction of main door entrance kerb
Make good existing hacked off skirting area at all bedrooms
Ceiling Works
Supply & install false ceiling at foyer area
Supply & install false ceiling light holder **** area $ 1,600.00
Supply & install false ceiling light holder at passage way to bedroom area
Plumbing Works
Supply & run stainless steel piping at kitchen and 02 bathrooms
Provide labour for installation of 02 toilet bowls
Provide labour for installation of 02 wash basins
Provide labour for installation of 02 instant heaters
Provide labour for installation of 02 set toilet fitting and accessories
Provide labour for installation of 01 kitchen sink
Laying of conceal PVC drainage pipe for 02 wash basins
Laying of conceal PVC drainage pipe for kitchen sink
Laying of conceal PVC drainage pipe for washing machine
Miscellaneous Works
Supply & install powder coated aluminium frame bi-fold door at 02 bathrooms
Supply & paint whole unit's wall using ICI wash & wear. (Unlimited colour selection).
Supply & paint whole unit's ceiling using ICI emulsion paint.
Supply & paint whole unit's doors, frames, pipes and gate using ICI gloss finish paint.
Provide re-varnishing of existing main door.
Supply & plaster whole unit's groove lines.
Provide alteration of existing main gate.
Provide alteration of existing main door and 03 bedrooms door.
Supply & lay protection sheet for all newly laid floor tiles during renovation period.
Provide chemical washing for all newly laid floor tiles.
Provide general cleaning for whole unit.
Up-lifting of materials and disposal of debris.
Kitchen Area Works.
1 Design & fabricate 27.5ft solid plywood kitchen cabinet include: $ 490.00
- 18mm Solid Plywood in Selected High Pressure Laminate Finishes
- Colour PVC Carcass & Shelves
- Matching ABS Edging
- 13.5 Feet Solid Surface top with Selected Front Profile & Back Splash $ 135.00
- 01 set 2-tier Stainless Steel Dish Rack
- 01 set Hydraulic Air-Spring
- Designer's Handles
- PVC Cutlery Tray
- Blumotion Adaptive System & Hinges
- 03 set S1 Blumotion Drawers System
- Provide Labour for Installation of Hob & Hood
- Provide Labour to Installation for Sink & Tap
Kitchen Cabinet Package Amount ==> $ 3,888.00
Supply labour & tools to hack off existing wall between kitchen & foyer area. $ 800.00
Measurement: L 2700mm
Supply & fabricate island top cabinet w storage cabinet. $ 1,350.00
*Perspective drawing provided
Island top measurement: L 1500mm x D 600mm x H 1050mm
Soild surface top measurement: L 1500mm x D 800mm
Materials: High pressure laminate & ABS edging. Included Soild surface work top.
Supply labour & materials to install 6mm thk tempered pastal glass in between top & $ 855.00
bottom cabinet @ cooker area.
Measurement: L 4100mm
D Living, Foyer & Balcony Area Works.
Supply & fabricate half ht T.V design feature wall @ living area. $ 2,400.00
*Perspective drawing provided
Measurement: L 3000mm x D 200mm x H 1800mm
Materials: High pressure laminate, stainless steel in-lay & storage cabinet for C.D.
Supply & fabricate design suspended T.V console @ living area. $ 1,280.00
*Perspective drawing provided
Measurement: L 2400mm x D 500mm
Materials: High pressure laminate w ABS edging & aluminium frame w glass panel
Supply & fabricate full ht casement door shoe cabinet w settee. $ 1,450.00
*Perspective drawing provided
Shoe cabinet measurement: L 1500mm x D 350mm
Settee measurement: L 400mm x D 350mm x H 450mm
Materials: Solid plywood with high pressure laminate & ABS edging.
Design & fabricate 100mm ht platform c/w laminate flooring $ 1,700.00
Measurement: L 3800mm x D 1600mm x H 150mm
Materials: Solid plywood c/w HDF laminate flooring.
Study Room Works.
Supply labour & material to extend & construct new wall for studyroom entrance using $ 450.00
100mm thk hollowblock, sand, cement, plastering & steel bar support included plastering.
Supply & fabricate design L-shape suspended study table w top hung storage cabinet. $ 2,450.00
*Perspective drawing provided
Study table measurement: L 2700mm x D 600mm
Top hung storage cabinet measurement: L 2500mm x D 350mm
Materials: High pressure laminate w ABS edging
Master Bedroom Works.
Supply & fabricate full ht open concept warerobe w full ht feature wall entrnace & $ 7,200.00
02 nos of door.
*Perspective drawing provided
Measurement: L 6600mm x D 600mm
Materials: Solid plywood with high pressure laminate & ABS edging, clear mirror.
Supply labour & tools to hack off existing wall for master room to extend walk in W'robe. $ 550.00
Supply labour & material to extend & construct new wall for master room & entrance $ 2,300.00
using 100mm thk hollowblock, sand, cement, plastering & steel bar support included
plastering.
Supply labour & material to install 01 set of classic door & door frame. $ 350.00
Common Bedroom 2 Works.
Supply labour & material to install 01 set of classic door. $ 190.00
Common Bedroom 3 Works.
Supply labour & material to install 01 set of classic door. $ 190.00
Master Toilet Works.
Supply & fabricate suspended bottom vanity cabinet @ master toilet. $ 450.00
*Perspective drawing provided
Measurement: L 600mm x D 500mm
Included solid surface vanity work top (L 600mm x D 500mm).
Materials: High pressure laminate w ABS edging.
Supply labour & material to install 10mm thick wall to wall swing door tempered glass $ 450.00
shower screen @ master toilet.
Supply material & labour to construct shower kerb for shower screen area. $ 100.00
Others Works.
Supply material to plaster smooth existing wall for whole unit internal wall & ceiling $ 1,850.00
using S-11 super ultra hard compound w angle bar support.
Total Amount: $ 50,566.00