Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

sgnick

Members
  • Content Count

    157
  • Joined

  • Last visited

Everything posted by sgnick

  1. Nice talking to you too. Depends on what your do I guess. I hacked the entire house tiles and retile. Almost everyday (including weekends) someone is doing work, until the 7th week. By eighth week thing slow down a little. 9th week the finishing touch.
  2. <!--quoteo(post=569980:date=Aug 31 2010, 05:14 PM:name=focus06)--><div class='quotetop'>QUOTE (focus06 @ Aug 31 2010, 05:14 PM) <a href="index.php?act=findpost&pid=569980"><{POST_SNAPBACK}></a></div><div class='quotemain'><!--quotec-->Hi can take a picture of your rack ? Or whats your rack dimension ? Yew Sin quote me $300 for a customized Lshape rack, PVC board. My storeroom is 204cm x 183cm. The depth of the rack is 60cm, height is 72" only. So I am wondering did I get a lousy quote ?? <img src="http://www.renotalk.com/forum/public/style_emoticons/<#EMO_DIR#>/mad.gif" style="vertical-align:middle" emoid="" border="0" alt="mad.gif" /> Thanks alot<!--QuoteEnd--></div><!--QuoteEEnd--> Hi, I bought this, but upgraded to 80" height (usual 72") and 5 levels of shelf (usual 4 levels). <img src="http://www.yee-sin.cm/images/StandardRacksB.gif" border="0" class="linked-image" /> Here is a pic, sorry about the mess. <img src="http://i17.photobucket.com/albums/b81/nick/Renovation/KSR.jpg" border="0" class="linked-image" />
  3. I stayed at my parent's flat 3 blocks away, so I checked the reno progress everyday I moved in when the reno was almost completed, just left 2 glass items to be installed. Now the reno is completed. My reno took 9 weeks.
  4. Hi Lyn, great to know there is another Room for Ideas customer. I was beginning to think I am only one here. Can't wait to see your blog.
  5. Installed storeroom rack, from Yew Sin Custom sized L-shaped, 80" tall, 5 levels rack, PVC wrapped boards. $230.
  6. Hi, you can try my contractor if you want. See my t-blog http://www.renotalk.com/forum/index.php?showtopic=28769 PM me for contacts
  7. Hi, you can try my contractor if you want. See my t-blog http://www.renotalk.com/forum/index.php?showtopic=28769 PM me for contacts
  8. Hi, you can try my contractor if you want. See my t-blog http://www.renotalk.com/forum/index.php?showtopic=28769 PM me for contacts
  9. You can try my contractor, look at my t-blog. PM me if you want the contact. http://www.renotalk.com/forum/index.php?showtopic=28769
  10. Moved in for 3 weeks already. Kitchen sink a little bit leaking, informed Vincent and he immediately call for plumber to come down and fix it until swee swee. The hydraulic hinge for my kitchen cabinet (to lift up the glass door) not working properly, Vincent got his carpenters to come and change entire set to another brand. So far the warranty support and response have been prompt and very satisfactory, even after 100% payment was already done weeks ago. Still easily contactable and responsible. One more plus point for Vincent from "Room For Ideas".
  11. Made final payment to willie/vincent. Bought desk, coffee table, side table from Ikea. Just ordered curtains from MGL, Day+Night full length for living room, Night 1/2 length for 4x bedrooms. Total $1300. Installation in 10 days time. Now looking for dining table, but looking for cheap one.
  12. Saturday 31 july: Sofa and mattresses arrived from Seahorse Mitsubishi fridge from Goh Ah Bee delivered Sunday 1 Aug: The big move, what a tiring day. Now living out of boxes at new place. Found some water dripping from pipes below kitchen sink Monday 2 Aug: Off to work from my new place. No leave today.
  13. We are also moving this Sunday
  14. Yep, it's either before 7th month, else will have to wait an entire month
  15. Ya, i prefer this to stainless steel or plastic box. To me looks better too. Don't really like laminated wood fixtures in bathroom also, I always feel wood and water should never mix, regardless of what others say about being it being humidity proof.
  16. The entire thing is made of glass, outside and inside. You can get from Genova, there's a big discount, usual price $199.
  17. Thank you samgalz. Your reno is looking great too. Seems like we will be moving in on the same week.
  18. Bedroom 1 <img src="http://i17.photobucket.com/albums/b81/nick/Renovation/finishing/BR1_1.jpg" border="0" class="linked-image" /> <img src="http://i17.photobucket.com/albums/b81/nick/Renovation/finishing/BR1_2.jpg" border="0" class="linked-image" /> Bedroom 2 <img src="http://i17.photobucket.com/albums/b81/nick/Renovation/finishing/BR2_1.jpg" border="0" class="linked-image" /> <img src="http://i17.photobucket.com/albums/b81/nick/Renovation/finishing/BR2_2.jpg" border="0" class="linked-image" />
  19. Common toilet <img src="http://i17.photobucket.com/albums/b81/nick/Renovation/finishing/CT1.jpg" border="0" class="linked-image" /> <img src="http://i17.photobucket.com/albums/b81/nick/Renovation/finishing/CT2.jpg" border="0" class="linked-image" /> Waiting for the toilet paper holder to be fixed <img src="http://i17.photobucket.com/albums/b81/nick/Renovation/finishing/CT3.jpg" border="0" class="linked-image" />
  20. <img src="http://i17.photobucket.com/albums/b81/nick/Renovation/finishing/K05.jpg" border="0" class="linked-image" /> <img src="http://i17.photobucket.com/albums/b81/nick/Renovation/finishing/K06.jpg" border="0" class="linked-image" /> Going out of the kitchen. Bifold door on left is to the storeroom. <img src="http://i17.photobucket.com/albums/b81/nick/Renovation/finishing/K07.jpg" border="0" class="linked-image" />
  21. Entering the kitchen. The storeroom entrance (bifold door) is on the right. <img src="http://i17.photobucket.com/albums/b81/clicknick/Renovation/finishing/K01.jpg" border="0" class="linked-image" /> Hob and Hood Waiting for them to fix the coloured glass backing onto the wall <img src="http://i17.photobucket.com/albums/b81/nick/Renovation/finishing/K02.jpg" border="0" class="linked-image" /> <img src="http://i17.photobucket.com/albums/b81/nick/Renovation/finishing/K03.jpg" border="0" class="linked-image" /> <img src="http://i17.photobucket.com/albums/b81/nick/Renovation/finishing/K04.jpg" border="0" class="linked-image" />
×