Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

DouglasHoh

Members
  • Content Count

    47
  • Joined

  • Last visited

Everything posted by DouglasHoh

  1. Maybe urs is contractor? That's give u a lump sum ?need to have sizes and scope of work and material used.
  2. Easy. 2 ways. 1) don't do the hacking. 2) change a contractor that willing to do it for u
  3. Ok simple. It can be hack base on hdb guide. But no one can assure that when in the process of hacking the tiles will damage. So as a contractor they will tell you cannot be hack or not advisable to hack. Hope this help.
  4. Hi evo, Standard ht is 8ft, if u gonna do higher of cos ur contractor needs to add $$ for sure. More materials , more workmanship. Don't worry about that. What u should worry is how much he quoted you.
  5. Yup, since guys are comfortable with the pm. Price dont really much matter. The price unable to help you to take a look as no size given.
  6. As usual, the package is always the attractive ones. Just beware of the part two which is always a killing blows to get back what they lost in part one.
  7. It's can be hack, but why does your Id says no? Ok it's because when the hacker hack the frame it might affect the wall tiles. And why wall and floor tiles cannot be touch for new flats? It's because hdb had done the water proofing and they does not want your contractors to damage it.
  8. Ok this happened to mainly ceramic tiles, ceramic tiles are glazed with colors. If it not treated well in the factory the color will fade out and causes the groud to stain with some colors. Secondly, it might due to the chemical acid wash after the completion of the work. The washer might have use a stronger acid to make the color reaction on the groud lines if it turns abit yellowish. The solutions u can try out are two ways, one, as what the previous member mention, buy a bottle of groud and div urself over it again and see it works. Second, try with some bleach u use for bleaching the clothes, apply on a dry tissue paper. Paste on the affected area for 2-5 mins. Let the bleach take out the stains. If these 2 ways cannot work for you. U can pm me, I show u another way of doing it. Hope this help.
  9. Hi, You will have a hard time cutting the Formica (laminates) using normal pen knife. If you really want to give a try you can visit a hardware shop and get a laminate cutter. Beware of you fingers.
  10. Hi bigbag, For PE endorsement for knocking down wall fees are range from 500-700. The PE can endorse for you within 2 days or maybe 1 if the plans are clear. For HDB side, it depends. ranging from 1week to 2week pending for hacking wall even you have the PE endorsement. But still it depends on case to case. If you are looking for a HDB -registered ID, there are quite alot of them outside this market. As for direct main con, you might want to check at the HDB registered listing. Hope this informations are good enough for you.
  11. How much is it? $110 pfr? They have a few range in LG, maybe you had chosen the higher range ones?
  12. Hi Tohweixiang, Warranty for workmanship will be 2 years, wear and tear and man made problems are not covered. For your case, i can get my designer to draw for you if you do not have any idea what you want. As for contractor, they do not have a showroom only ID's has one. I do have a operating signage workshop at Defu lane which is my office. And for my carpentry, i do have a workshop in JB. I guess those are basic price u got quoted for. But before you commit anything just ensure that those are the items and material you wanted for the right price. If you wanted to take a look at our workmanship, i can arrange to show you my current project.
  13. I have total up the amount is $8300 if I am not wrong. Beside those item that I reply you, the others can be done, but still need to look at the design and material used.
  14. Hi Fel, Yes, have to drill a new hole for the peep hole. The existing hole will be covered by the new veneer sheet or laminate sheet.
  15. Opps I think i am late for this reply. I guess your Id have already shown you the differences.
  16. Ciligaz, You can check dimmer electronic ballast for your dimmer or check with your electrician if you are appointing them. If you are DIYing, you can check online where to get it. But becareful with the wiring!
  17. Hi Shawncck, Solid surface is semi shine i can say that. The shine will not last more then 5 years, depending on the user how they maintain and usage. But dont worry about it, solid surface can be re-polish. Other then solid surface, you can try granite tops which are very shiny if you are choosing the black galaxy. But the price is much higher then solid surface. If you have an appointment ID or contractor ask them to show you the samples. Cheers!
  18. oh ya, where is your kitchen and toilet photos?
  19. Yes. but the cost is very high! That's why its not advisable to use glass as a working top. Beside the price, there are some other issue your contractors or ID will advise you.
  20. http://img.photobucket.com/albums/v630/defelio/My%20Mini%20Mid-century%20Modern%20home/HomeSweetHome_20110731_00045.jpg Nice photos!! I like this most! Lol sorry I can't say the Reno work is nice. U know the reason. Awaiting for house warming! Yum yum!
×