Skip to content
View in the app

A better way to browse. Learn more.

RenoTalk.com ™

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.

wyx03

Members
  • Joined

  • Last visited

Everything posted by wyx03

  1. So far only some minor hiccups here and there, but ID is flexible enough to fix them and explain in details. The aircon drainage PVC pipe in the MBR bathroom is the only pending item that we have yet to find a better way to run it. Looking forward to see more reno photos from you
  2. Hi neighbour, I m from 524B. Hope your reno will go smoothly and work well with your ID/contractor
  3. We have bought both warm and cool white LED strips and LED T5 tubes. Haven't decide which one to use, but most likely will use warm white LED strip since it's slimmer. We bought a lot of Philips 4-ganged light switches. They are standard 10A rated with fire-proof materials. The quality is definitely much better than those standard power switches installed by HDB. However, don't buy those power switches with stainless steel polished faceplate. They look solid and classy, but I don't think anyone will feel comfortable touching a electrical metal switch . For electrical power socket, buy only if you feel comfortable because power sockets sold locally have the Safety Mark stickers on them. Here are the links to the LED strips and T5 tubes. Their LEDs are either from Taiwan Chimei (in LED strip) or Samsung (in T5 tube). I bought quite a lot of spares since they are so much cheaper than buying locally, and I can replace each LED individually if they happen to fail prematurely LED T5 tube: http://detail.tmall.com/item.htm?id=35675365653&spm=a1z09.2.9.533.LOjDNg&_u=jvr2rgb20ad LED strip: http://detail.tmall.com/item.htm?id=37523938302&spm=a1z09.2.9.414.LOjDNg&_u=jvr2rgb157e
  4. Have been receiving PMs on how to make online payment by using NETs. Hopefully this step-by-step procedure can be helpful for those who likes to try TB/Tmall. Sorry for the pictures quality as my gallery album has already hit the max of 50 photos.
  5. I have the same question when I saw the way our aircon drainage PVC pipe is laid from ceiling all the way to the drainage hole Definitely need to work out with my ID when I am back in town. Pls share if your ID/contractor has better solution to hide it.
  6. Oops...my mistake. 57ft is the total length written in my reno quotation. I just checked the actual measurement I took last time, it's about 17ft 1 side. So both sides should be ~34ft. I guess the 57ft quoted was based on top and bottom cabinets. For aircon installation, I let my ID to work out the schedule since I am not in town. He started the aircon and false ceiling installation concurrently since they are related. In our case, we run the trunkings across all the rooms and hidden inside the wardrobes, so aircon need to be installed 1st before we can start the carpentry works. Everything went smooth except that the false ceiling contractors forgot to wrap the aircon when they were laying the false ceilings , so all the fan units are now full of dust on their suction holes. Not a big deal though but will have to spend an hour or two to vacuum them before use.
  7. ya...but that 'runway' costs a lot because we will need to pay for approx 57ft of top+bottom cabinets and quartz table top. Our ID brought us to visit his on-going project with the kitchen cabinets' downlight, and we really like it despite having to give up quite significant amount of storage space. But we eventually have to pass this design idea because we have cement base for our kitchen sink and stove, which have to be sit on the floor. Instead of 50%-50% different design of bottom cabinets, we go for the normal but more practical design
  8. Aircon trunkings in MBR. Not a perfect routing but thoughtful and practical enough. Will discuss with ID to reroute the small drainage PVC. BTW, an advice to home owners who will install their aircon in early reno phase. Make sure your aircon fan units are properly wrapped up during the reno works. Otherwise you will need to spend extra time to vacuum the dust out from the up-facing suction holes before you can use them.....a hard lesson learned
  9. Can share how much did you pay for the racing simulator and where you bought it? Thx
  10. Didn't have much time to upload photos since I am here in Taiwan for oversea work assignment for a week. Leave the reno to ID and wife while getting updates from them through skype and emails. Ran into quite a lot of trouble mainly caused by the building structure where the kitchen flooring is higher than the living/bedrooms floor level. As per ID, the kitchen flooring will be higher than the living room flooring once overlaying the kitchen tiles. So, we have to raise the living room floor level slightly while not obstructing the bomb shelter's door. But will have to trim the main entrance door.....seems like the HDB construction quality really needs a 3rd party to watch over them MBR aircon trunking box up....wonder if there will be any problem next time when servicing the aircon fan unit with such a limited space. 30/12/2014: Edited to consolidate all photos due to limitation in gallery, and updated with post-reno photos.
  11. I bought LED down lights, T5 LED lights, kitchen sink, basins, bathroom faucets, mirrors, LED ceiling lights, LED track lights, and many more. None of them is faulty or broken. Some sellers even give extra spares for items that I bought from them. My 2nd batch of goods (computer chair, dining chairs, LED lights, decorative pots, etc) will be shippped out this weekend. As bro OceanEleven mentioned, we need to put in some effort to compare and review comments from other buyers on the sellers. I have spent more than SGD3000 buying from TB and Tmall. I would have spent more than SGD6000 if I were to buy the some goods locally. Take for example, the exact same basin that I spent sgd50 buying from Tmall/TB costs sgd105 if buy from HoeKee. Of course, it depends on individual if saving 50% worth the risk for such a fragile item.
  12. My reno is not going as smooth as I have expected....quite tiring to deal with all this from oversea. Hopefully my ID can manage the remaining reno works without more surprises from his contractor... Looking forward to visit your new home as well
  13. Wonder where you install your fan coil unit in your MBR? Above the MBR's door or the bathroom's door? Hope my reno also progress as smooth as yours
  14. Started floor screeding on 30/9 and 3rd round of common bathroom's uneven mosaic tiles rectification. But no luck.... HDB sub-contractor seemed to start late and got the MBR flooring done. No progress on the other 2 bedrooms. They also left the MBR windows wide open. Wonder if that was on purpose to let the cement dry or forgotten to close Gave up to let HDB sub-contractor to keep rectifying the uneven mosaic tiles while delaying all other reno works. Informed BSC to hold on the 4th round of rectification in order for us to start the floor screeding and reno works. Put this under KIV Hopefully the electrical works on this coming Fri and Sat can progress smoothly.....
  15. Hi Aron, PM'ed you. Pls respond through my mobile contact. Thx
  16. 30/12/2014: All photos in this page have been consolidated in post #24
  17. 2nd version of the 3D photos from my ID. Will make some changes in the color but probably no more 3D as it takes too long to get updated..... 30/12/2014: Edited to consolidate all photos due to limitation in gallery, and updated with post-reno photos. Also commented in the photos with all the loose promises and mismanagement of some reno items
  18. Inspected this evening after the HDB sub-contractor touch-up on the uneven mosaic tiles. The uneven tiles in the MBR bathroom look acceptable, but the uneven tiles in the common bathroom just moved from one area to another area :curse:Decided to KIV this defect for now and push for floor screeding and reno to start early next week. Was told by the HDB officer that this is one of the most common problem in the new flats in Costa Ris....
  19. 30/12/2014: All photos in this page have been consolidated in post #21
  20. Some of the defects that we reported to BSC on 15/9. All have been rectified as we inspected yesterday except the uneven mosaic tiles in both bathrooms. Talked to the BSC officer and inspected the uneven mosaic tiles together with their technician. Was assured that it will be done by Sat. So, going to make another inspection on Sun to make sure things are really done and no more delay. To those who are planning for their reno and move in date, you may want factor in ~3 weeks for defects rectification by HDB. We wasted 2 weeks for them to rectify the defects at their slow pace with the reasons of tight schedule and always "in progress" status. Don't be surprise if you are asked to wait for another 2 weeks for them to screed the flooring 30/12/2014: Edited to consolidate all photos due to limitation in gallery, and updated with post-reno photos. Feel free to pm me if you need photos at certain places in the house.
  21. Very sharp eagle eye .....We are on the highest 13th floor, but the ceiling height is only different by ~10cm. I think the highest floor of the older flats were ~20cm taller. We decided to take the highest floor so we won't see the drainage/water pipes running down from the flat unit above. But we are taking the risk of lower water pressure as many have feedback in the forums.
  22. Hi abbytan, I used Oops. Overall, quite satisfied with the service, especially they deliver to your door step. Unlike Daigou65, we will need to collect the goods at one of their pickup location chosen by you. You can manage everything online, and they are quite responsive in email. They also have a local mobile number for enquiries, but not as responsive though. Planning to go for 2nd round of purchase...got addicted after my 1st round of purchase with all goods delivered in good condition
  23. FYI. I just sold my flat last month. HDB came up for inspection of windows, grilles, etc. He told that my main door is not fire rated and I must replace it before handing over the flat. So, I guess sellers are liable for any items that are not HDB approved.
  24. I used Oops. It took less than 14 days from the payment to the date all goods (consolidated in Guangzhou warehouse) been delivered to my door step. Nothing to complain about the online DIY-shipment system, but their email response was rather slow. You don't get response by sending sms to the local contact either. I have used Daigou65 before, but it's quite inconvenient in term of collection because you will need to match their delivery time at one of their allocated locations that you have chosen. Good lobang on the uni-arm holder. Can PM me his contact and the cost? The original one from HDB doesn't have locking mechanism to hold the door at 90deg, which is rather inconvenient when you are moving in many items alone. Thx

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.