Skip to content
View in the app

A better way to browse. Learn more.

RenoTalk.com ™

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.

jaCKY777

Members
  • Joined

  • Last visited

Everything posted by jaCKY777

  1. Hey, - my kitchen pull-out table though is different frm wat u intended 2 do, i find its kinda similar concept. See e pix below, ignore e paper-tape on e granite top & e plastic wraped around e legs. - it is made up of Black Galaxy granite, solid plywood, 1 set 3-track runners, 1 pcs square hollow section polished stainless steel legs. - basically, e design -> polished stainless steel legs (A-shape design) is screw 2 e thk plywood below which inturn is glued 2 e granite top. e other side which is at e tall cabinet side is supported by runners on plywood support. In fact, dis granite worktop is 3ft x 1ft, its kinda heavy oleady. - for ur case of 1.8m x 1m marble, i gues it wld b much heavier. Definitely gota do a box frame 2 support e slab, regardless wats e legs design & how u gona connect e marble 2 e legs support. - ask ur marble supplier lah, i belief they hav e contacts. - if u stil nid e contact, i do hav some1 in mind. U gota bring watever sample pix & discuss wif e person-in-charge. - but price i guess wil b kinda on e high side. If polished stainless steel mayb between $500 - $750. Hairline finished wld b cheaper but less appealing. On e whole, its stil cheaper than retail if can get e marble slab at a cheap rate. - PM mi if u stil nid e contact.
  2. Hey neighbours, - any1 on e high floor experience hairline wall cracks? - las time b4 reno oleady got crack. - complaint hdb service centre, asked them 2 rectify. - rectified liao, nicely done. - now 3 mths later, after my reno done & painted, CRACK again !! - by rite, it shouldn't crack again. By left it crack again. - dat means, dis time e crack its wider than e 1st time. B.cos previous cracks were patched up & painted. - if every 3 mths like dat, dunoe how leh. crack - patch up - paint, crack - patch up - paint, crack - patch up - paint ... Zoom-in part view 1 of hairline crack as at 2008Jun03 Zoom-in part view 2 of hairline crack as at 2008Jun03 Patched-up as at 2008July01 Painted as at 2008 July03 Hairline crack as at 2008Oct17 Zoom-in part view 1 of hairline crack as at 2008Oct17 Zoom-in part view 2 of hairline crack as at 2008Oct17
  3. jaCKY777 replied to zhong's topic in RENOVATION WORKS
    Hey, - 1st paint commonly refers 2 e base coat. Commonly & widely use is 'Super White Emulsion Paint' by Nippon, regardless u r choosing ICI or Nippon paint s e final color. - 2nd paint commonly refers 2 e 1st coat. It is e exact color u see on e paint booklet. In fact, it shd b slightly thicker or brighter in color. - 3rd paint commonly refers 2 e 2nd coat or final coat. It is e exact color u see on e paint booklet. In fact, it shd b e same color s e 1st coat after it dries. - wen e paint is stil wet, e appearance of e newly painted tends 2 look different. After it had dried, e correct color wil appear. - by rite, wat color 1 chooses frm e paint booklet is wat 1 gona see at end of day s e end product. In some cases, e end product may appear richer in color due 2 natural or mechanical lighting. - 2 cut cost or rather recycle left over paint frm previous jobs, some painter use e 'left over' & mix & match 2 meet e client's chosen color. Dis 1 can b seen during day 1, wen e cans of paints arrived, b4 e painters start work. E paint cans shd b new, had neber been opened. Whether e can of paint had been used b4 anot, any layman can tel frm there. - a professional way of painting is 2 pour e paints 1 gona use in2 a big container & paint frm there. So dat watever unused which is untouched in e new container, can b kept by u for future usage. - if e painter gona paint direct frm e new can, gota make sure he finish e whole can. If not, after he paint e 1st coat, he gota wait it 2 dry b4 2nd coat. Meanwhile, he washes e same brush by running water & uses it 4 another color. - although e brush is left 2 dry, dis is e time e mildly wet brush cums in2 contact wif e paint. - once paint cums in2 contact wif water, there wil b chemical reaction over time, u wil definitely smell wat u had described, e sweaty jersey. - new paint in e container which did not cum in2 contact wif water, wif proper storing, can b kept for yrs. - if e 1st & 2nd coat cums frm e same container, dat means e painter had unintensionally or carelessly let e paint cums in2 contact wif water. Evidently, e 2nd coat had been mixed wif water, frm purplish becums bluish. - watever painted canot b undone. No pt arguein who's rite who's wrong. My suggestion is 2 demand ur ID & painter 2 paint it 2 ur chosen color which is reflected in e booklet. - last resort, get a new can of paint. Worse 2 worse, hold on ur payment. - olso, if end of day u gona touch up e edge on ur own, gota do it very thin & 1 time. If not u wil see e patches at diferent angle, b it by brush or roller or sponge.
  4. - basically, ventilation fan is 2 ventilate e rm. - it is fixed in2 e glass panel of e window. - e glass panel inturns is fixed 2 e alum frame of e window. - dis glass panel can b in e form of fixed panel or top-hung. - if fixed, only can clean e internal. - if top-hung, can open up e top-hung, clean e outside. (top-hung means e pivoting pts r at e both sides, jus like e 1 above ur casement or sliding window) - conventional window in e bathrm is alum frame glass louvres, e glass cums with wire-mesh & is somehow obscure 2 reduce visibility. - e control or switch pt of e fan can b either manual or auto.
  5. - old hdb flat design do not hav a drop, dat is y a kerb is needed 2 prevent water frm flowing 2 other area of e bathrm. - current design hav a drop, dis wil prevent water frm flowin frm e shower area 2 e basin area. - wen installing e shower sceen, b it tempered glass or acrylic, frame or frameless, it is 2 e user preference & design. - some ppl construct a kerb, jus 2 embed e aircon piping. Pardon mi kpo, keys given by hdb on keys collection day -> - 3 nos. letterbox keys - 3 nos. G&W keys - 3 nos. E&T keys - 3 nos. metal gate keys - 3 nos. main entrance door keys - 3 nos. master bedrm keys - 3 nos. bedrm 2 keys - 3 nos. bedrm 3 keys - tap-head for water valve inside letter box. This tap-head is 2 increase or decrease e water pressure. e valve is e thingy dat controls e water pressure. B4 using e tap-head, u may nid a (+) screw driver. - tv antenna cable inside letter box. 3 nos. if i'm not wrong. - yup. u r rite, bathrms no keys. 1 can lock frm within. If accidentally lock frm within & no 1 is inside, can stil open frm outside with special tools & skills.
  6. - 2 take out e dnlite in 1 whole pcs, u du not hav 2 cut e false ceiling. - e dnlite is fastened 2 e false ceiling by 'pins' on both sides in e internal of e dnlite casing. - e dnlite glass casing olso applies e same method, fasten by 'pins' on both sides. - wen there's a nid 2 change e energy saving bulb (eg. warm white, cool white or daylight), jus nid 2 open up e glass casing. 1 side of e glass casing wil stil b hanging (pin stil hooked), 1 side loose (pin not hook), both pins r fixed 2 e internal of e glass casing. Replace bulb, press e pin & insert in2 e correct slot of e dnlite casing, close e glass casing. Dis applies 2 square type of dnlite. - circular type of dnlite is easier, jus nid 2 turn e casing anti-clockwise or clockwise. - w/o casing even easier. Jus like those in our lift lobby. - some dnlites, e light bulb holder is vertical while most r horizontal. - wen e light bulb holder is horizontal, some designs can b tilted, so dat changing of bulb is w/o fuss. - wen there's a nid 2 take dn e dnlite casing. (1) Remove e glass casing. (2) Remove bulbs (3) Release e pins in e dnlite casing, take it dn. (4) off MCB at main switch board 2 play safe, unscrew e (-) small screws dat fasten e wires. - changing of bulb, most ppl can do. But take dn e whole dnlite casing, not every1 noes how 2. - e lightings were recomended by ur ID rite? Jus giv him a frndly call, tel him ur situation frm day 1 (spoilt changed & spoilt again). i belief he'l try solve 4 u. - if not, then u gota call e lighting shop, repeat wat u told ur ID. They definitely gota rectify 4 u. - at e last resort, tel them u willing 2 top-up slightly more 2 change 2 a better internal component. Do not attempt to tamper with any electrical wiring & fittings if u r not sure, esp. wen e main MCB is ON, LIVE current is expose.
  7. - u r rite man. - basically, SERS ppl who had : 1) lived in e ext'g flat > 5yrs, wld b buying e replacement flat at 20% discount of dat prevailing market worth of new flat + $30k reno grant. 2) lived in e ext'g flat < 5yrs, wld b buying e replacement flat at 20% discount of dat prevailing market worth of new flat. Dis grp of ppl includes those who buy e flats after it is announced enbloc. - on my level, > half of e total nos. of units r frm SERS. Had a brief chat e other day wif 1 of e neighbour. - we hav e same layout but our units r at e opp. end on e same level. - if i recal correctly, e price difference during my purchase period is abt $1-2k due to orientation. - my neighbour asked abt my purchased price & told mi abt her purchased price. - e difference is abt $100K - those elderly couple who do not hav outstanding hdb loan & opt 2 take a smaller 75sqm unit, basically, they nid 2 fork out only $2-3k 'paperwork' fees. - if they cant fork out e $, they can opt 2 pay by installment which is merely $1-2 hundreds for a few yrs. - basically, its Old Smaller Flat Replaced By New Bigger Flat. Many of them r so delighted. i had seen many, in fact, too many a happy wrinkler faces. - SERS benefits etc were discussed in e earlier earlier postings. Aniway, its useless 2 look bak. ----------------------------------------------------------------------------------------------------------------------------- - any1 here is electrically trained? - i got sum quiries on light switches wiring lei. - any1 can ans?
  8. - dis pix was taken yesterday evening. - i was there, had tot of takin e pix & send 2 STOMP olso but did not. - then i saw dis lady, walking 2wards e car. Think she noes e newspaper vendor. - din see e person who took e pix. izit u?
  9. Hey Vlanze, - Hows ur homo tile scratches liao? - wat rectification did ur ID do?
  10. Hey JMers, - got sound of crickets calling; - got sound of toads croaking; - got sound of water running dn e pipes; - got sound of air circulating in e pipes; - got sight of spiders crawling; - ... got so spooky meh?
  11. Hey alister, - so u meet up e chairman often, at e RCC? - how's ur floor tile probm liao? Rectified? Hey meepok, - nuisance post, i cant b bothered, waste my time reading his post. ----------------------------------------------------------------------------------------------------------------------------- Update on my reno status -> - metal gate bolting holes drilled out of line, can only bolt if use force on e metal gate! - s.s. backing panel havnt use oleady kana scratches! - while installing e s.s. backing panel, scratched e kitchen cabinet laminate. A long deep scratch! - s.s legs for pull-out table flimsy, not well-done. How 2 support e granite top in e long-run! D-a-m-n fed up. Think gota rectify all defects & mistakes.
  12. - jus got my latest utility bill. - got a shock! Havnt move in, yet my bill is $120+ - after scanning thru every item, ohh, e gas pipe installation of $100 is included. ---------- - jus got a letter frm Toa Payoh Central Citizens' Consultative Committee. - it states e measures & actions being taken by e relevant authorities regarding security issues. - check out ur letter box. ---------- - those ppl who dun contribute constructive replies, reply olso not relevant, i think u r lonely. - kinda pathetic dat 'u' nid 2 cum in here 2 get attention. - i think 'u' go do charity work better. More meaningful. - e less fortunate ppl who r in need of help requires 'u' more than e TPY Blk 79 Kakis thread ppl. - but even 'u' volunteer help them, i doubt they wil accept ur help e 2nd time. - 1st time they'l think, 'u' r a 'typical volunteer'. 2nd time they'l noe, 'u' r a 'useless volunteer' & add-on 2 their misery. - they'l rather dun wan ur help. - if 'u' dun like wat i'd wrote then too bad 4 'u'. - jus like many ppl dislike ur nuisance posts. - nobody wana read ur post, y 'u' stil wana post here? (2) - bcos 'u' wana gain attention. - y 'u' wana gain attention? - bcos 'u' r lonely. - y 'u' r lonely? - bcos noboby wana b frnd with 'u' who s-h-i-t everywher. - y 'u' s-h-i-t everywher? - bcos 'u' eat ful liao, find place 2 s-h-i-t. - y 'u' cum here s-h-i-t? - go 2 pt. 2 & e cycle wil revolve another round, another round, another...
  13. - my info may not b up-2-date. - extension of gas pipe = 1 amount. - activation = think is another amount. (4goten liao). - mayb some1 wif recent bill wana clarify. - u can call Citygas 2 ask olso. Its e same tel no. 2 make appt. for pipe extension & activation.
  14. Hey Vlanze, $100 payable to Citygas -> - extension of gas pipe to cooker hob area. - conection of gas supply to cooker hob. (rubber hose) - installation & activation of gas meter. (inside G&W services duct). - additional charges if alter extended gas pipe. - additional charges if use gas heater. Needs 2 extend e gas pipe 2 e new gas water-heater. - all dis charges is payable 2 Citygas by 'owner' via e utility bill. - therefore, it shd not b chargeable in watever reno contract.
  15. Hey Dracula, - u got contacts 4 Shower Screen? - tot of installing 1 w/o doors. - frm e pix of e thief, can tel u mus b a LEGO fan. - i olso a LEGO fan but not so fanatic. - only got a few LEGO Technic models. - wats e brand of ur feature wall laminates? - looks kinda similar 2 my wardrobe's.
  16. Hey Hana79, - i cant remember who installed e ventilation fan in e toilet but i'm sure there r quite a few. - if i'm not wrong, gona get approval. - total amount gona invest shd b abt $300. (if recal correctly) Hey Alvin, - ur ID/Contractor no lobang? - e cheapest in e market shd b startin at $300 onwards, depending on e complexity of hacking. - additional $$$ involve > -- dismantle existing door frame, if any. -- seal-up existing doorway, if any. -- hack wall, create e door opening. -- supply & install nyatoh door frame. -- make good affected walls. -- supply & install bedroom door, if needs 2. May use back existing door if e direction of swing is similar. If not, gota ask around fellow neighbours whom gona throw away theirs. But i think gona wait 4 e upcuming batch. Or mayb u wana try e Bangalashi workers, they do keep quite a nos. of discarded doors. -- relocated affected elect conduit, wiring & switch pt, if any. - new crates of cement had jus been delivered, so i presume e final batch of 79 neighbours r gona collect their keys beli beli soon. - noise & dust wil soon b bak again. Hey groovygenie, - y dun u ask ur Id/Contractor 2 install 4 u? - 8mm tempered glass backing 4 kitchen stove area shd b abt $12 psf (supplier's price). - most importantly is 2 get e supplier 2 measure on site b4 'cutting e glass'. If not, u take ur own measurement b4 ordering, esp between e top & e bottom cabinets, gif allowance of abt 2mm. - s once e tempered glass is cut frm float glass & heat treated 2 bcum tempered glass, it CANOT b cut liao.
  17. Hey Hana79, - aiyo, e drink & food SOoo X! Really chop carrot head out of e F1 fans ... - mayb nex time i shd go set up a 'Cha Kway Tiao' stall. - got take pix anot? See leh. - yah, dats e 'ball'. But i find its not outstanding enuf, mayb gona DIY paint e circumference of e circular false ceiling? - or mayb add in LED lites, jus like those Hari Raya type. - 4 e past few nites, i hav been monitoring e elect meter -> -- e highest elect power comsumption is e beautiful lite wif halogen bulb, yet not bright. -- e lowest elect power consumption is e ugly energy saving bulb, yet beli bright, esp wif 'daylite'. - mi gona start clean-up & DIY touch-up watever 'defects' i find sore eye. - sms/call mi b4 u cum then. - btw, u got ladder? Think of getting 1 s its kinda handy. Hey meowie49, - gd loh. - then who's gona monitor e 'recording'? - saw a patrol car in e MSCP on e higher decks. - saw a grp of teenagers on bicycles kana screen & spot check. - think TPY Ctrl 79 too much publicity liao, e relevant authorities had started 2 implement measures & take actions. - i olso notice e common corridor is swept every day. Much cleaner than b4 but stil its dusty.
  18. Hey Hana79, - my lights installed oleady, e effect hor, cum see 4 urself loh. - check-out my avatar 4 a preview. - let mi noe wen u wana cum & see again. Hey meepok, - e surrounding carparks i wen 2 recce liao, its either ntry by Cashcard or got 'ON' carpark warden. - any carpark i go, gota pay $$$. Not like las time... - think now most of e carpark warden r frm pte company, oursourced by hdb. - if 'hdb auntie', they r more lenient. - if 'outsourced warden', they r more stringent s got quota 2 meet. - mayb i shd consider ride bicycle. Free parking. Can even park outside my unit.
  19. Hey shay_d, - mine? think shd b 70% done bah. - there were some hipcups, if not, oleady completed liao. My schedule -> This week -> 1) installation of glass doors for wardrobes 2) installation of granite worktop & pull-out table at kitchen 3) installation of lightings & switches 4) measure S.S. backing panel 5) touch-up paint & paint doors 6) rectify defects in carpentry Next week -> 7) installation of S.S. backing panel at kitchen 8) payment $$$ 9) installation of inlet, outlet piping & tap-mixer for kitchen sink and bathroom accessories (TBC) 10) installation of shower screens (TBC) 11) installation of window grilles (TBC) 12) DIY cleaning & washing (TBC) 13) refill white cement in tile joint (TBC) 14) make appt with CityGas Next next week -> 15) check for auspicious date (TBC) 16) connect gas hob & activate gas meter by CityGas 17) electrical appliances (TBC) 18) furnitures (TBC) 19) barang barang frm current hm (TBC) 20) ... (TBA)
  20. - had seen men-in-blue on foot patrol at 1st sty lately. - carpark warden olso kinda frequent. - jus kana a $100 Fine! - had seen many a times, dis middle-age couple kissing passionately behind e letter boxes of 79E. - think its more windy over there. Olso, tired liao can go foodcourt by drink.
  21. Hey our-home, - wher is Song Cho (AMK branch)? - any other branch in Marsiling, Woodlands, Bishan, Toa Payoh?
  22. - seems like e 79 neighbourhood had finished reno their homes, settled dn. - beli quiet lately in Renotalk. - dunoe wen's e final batch of neighbours gona collect their keys?
  23. - i think ur worries r wrong. - if u ngage him at end of e day, wen his quote is much higher than his colleague he shd provide u better design proposal & services. - he shd b e 1 woryin, not u. - 1 thing i find beli important in reno a dream hm, is communication. - dun assume, watever doubts & queries in ur mind gota raise out. - saying is free. whereas lack of communication & understanding wil leads 2 unhappiness & most importantly more $$$. If not agreeable by both sides, gota say til both sides agree than proceed. - dun b paisei. Tel dat ID straight dat u oleady noe his quote is higher than his colleague but u stil ngage him. - 'i dun xpect e materials u use is made of gold or diamond. All r standard materials which r widely use by e reno industry'. - 'can u gif mi assurance dat u wil provide a better design proposal, coordination & management service 2 prove dat u r worth e xtra $$$ than ur colleague who's quote is lower?' - if he say canot, u'l noe wat 2 do liao. - if he say no probm, he'l do his best. Then u'l hav a more peaceful mind liao. Conclusion: - dun b paisei, dun take-in 2 much ID's empty promise b4 signing of contract. - after signing, stil gota observe & monitor b4 paying blindly. - 1 shd get equal or more than wat he pays, not lesser. - e above r my personal views, its up 2 u 2 obsorb anot.
  24. - Then how abt those items at Sim Siang Choon? - They got a wide range of products at e Changi South showrm. - m planning 2 get mine over there lei.
  25. Hey purplesky, - pardon mi kpo. - frm ur post, i find dat there is oleady some discomfort between u & e ID although u said there is 'clicking'. - different ID frm e same co doesnt mean e price of reno wil b e same. It goes back 2 how much e ID wana earn frm e potential client. - there is e base cost price frm sub-con & supplier, then ID wld mark-up e price at least 20%. - depends on e ID 2 determine dis 'designer fees'. - yes, window grilles there r different grades & different pricing. - currently, e standard bronze anodized alum window grilles is abt $5.60 psf. - thicker rod (double e mm) gota add abt $0.80 = $6.40 psf. - more complicated design, eg. 2 horizontal bracing with 1 vertical bracing is consider abt $6.40 psf - casement window grilles is consider abt $6.40 psf. - u oleady noe where ur heart lies, no pt stick 2 e 'click'. - s wat h4happy suggest, move-on & source more quotes. - fyi, basic reno -> homo flooring whole unit, kit cabinet & 1 no. wardrobe & other misc, by ID co is abt $15k excludes lightings, elect appliances & furnitures. - more wardrodes or carpentry such s feature wall & console, add-on frm there.

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.