Weaver 0 Report post Posted February 14, 2009 Hi everyone, I have a kitchen measure around 3.9m by 2.4 metre. I need to tear down everything in the kitchen, and re-installed a new kitchen? Can any one advise me on a package cost? And also what are the things I need to take note? Also, I heard we need to apply HDB for some kind of permit for demolition work, is that true? Would appreciate for heard from any of you advises. Thanks you. :-) Share this post Link to post Share on other sites
pinkpetter 0 Report post Posted February 14, 2009 I'm no pro... but I'm thinking of these... Packages usually include other stuff too.. But I reckon a kitchen with a change of wall and floor tiles and cabinets will probably cost 5-8k? Cost should include: hacking of tiles and removal of cabinets Tiling and waterproofing construction of cabinet base cabinets (number and combination makes a diff) eg. if you want to have tempered glass doors it'll cost more. Orientation of the cabinets (whether there are corner units) type of laminate type of worktop (postform/solid surface/granite) Plumbing (need to shift? need to change pipes?) Electrical points Backing? (need glass or S/S backing?) Yup need to apply permit if you're hacking things off. I'm concern about one thing... is your kitchen... near your entrance? Cos after they hack they need to haul the things out... I'll be worried when they try to drag things across my hall/living flooring.... Share this post Link to post Share on other sites