Reira

Counting Down To Moving Day~

Recommended Posts

gim

is this the FFM 4000 you are talking about? it can install light, the white FFM 4000 in the pic have light installed.

24264_382585566459_597656459_3690820_974

Door - can i have the supplier's name as well? Thanks in advance!

Windows - thanks for the name. will contact them as well!

Door: thats great! then i dont need a fire rated door since mine is a corridor unit =)

frame: i think there are rust or something. can they actually change out the metal part of the frame (in the middle where we close door)? i think that one is rusty as well. my hubby thougth since it is quite cheap, might as well do everything. but if they need me to go down to their office to make deposit before they come to measure, dont think i would engage them. inconvenient for me to go down! too far.

Edited by Reira
 

Share this post


Link to post
Share on other sites
Looking for good contractors? Click here for your request

Hi Reira,

The one i got was the black: FFM4000 GM, comes with a regulator, no lights and no remote. The white one looks a bit different, im not so sure that lights can be fitted on the black or not also. It costs like $80 for the remote. I figured that its not very worth it as the fan cost $118. :)

Door contact: i PM u. They will advise u on the door frame as well. I know what you mean by the metal part, its for the door lock one right? That part they will make good for you...Mine is wooden door frame, so they like screw a piece of wood there to make up the hole. Your frame is metal? Maybe the door people can advise u...

:)

Edit: your inbox is full...

Edited by gimz63251073
 

Share this post


Link to post
Share on other sites

So, which window specialists did you engage?

Is the price good? How about the workmanship?

I also need to change the window grill again soon.

 

Share this post


Link to post
Share on other sites
So, which window specialists did you engage?

Is the price good? How about the workmanship?

I also need to change the window grill again soon.

:o so fast? thought u dun nd to change???

 

Share this post


Link to post
Share on other sites

ngunadi

i havent choose one. so far only asked quotation from unipac and doors gallery doctor. both going to my place on thurs.

Edited by Reira
 

Share this post


Link to post
Share on other sites

Yesterday was the big day! :D So excited!

Woke up early in the morning 6 o'clock... disturbed neighbours cos have to knock real hard to chip off the wall. =( saw 2 next door neighbours and apologized to them.

24604_385869171459_597656459_3772887_599

Went there again in the afternoon to meet up with windows supplier. Heavy rain and loud thunder... what a day!

24604_385866026459_597656459_3772831_615

Common toilet

24604_385866051459_597656459_3772835_236

Service balcony

24604_385866056459_597656459_3772836_311

Master Toilet

24604_385866071459_597656459_3772838_146

 

Share this post


Link to post
Share on other sites

Kitchen cabinets doors out

24604_385866161459_597656459_3772854_774

The corrugated paper is here at 4:47PM. Hopefully my current living, bedrooms floorings are ok.

24604_385866121459_597656459_3772847_863

 

Share this post


Link to post
Share on other sites

Just found out that I need my window installer to come install my window for the toilet before tiling. What about rooms windows? *headache*

Edited by Reira
 

Share this post


Link to post
Share on other sites
Just found out that I need my window installer to come install my window for the toilet before tiling. What about rooms windows? *headache*

Better get them to install the windows at one go....I think you need to install the windows before tiling can start.

Also, do ask Patrick to let u know what needs to be done first...

 

Share this post


Link to post
Share on other sites
Just found out that I need my window installer to come install my window for the toilet before tiling. What about rooms windows? *headache*

did they say why? i don't think its a must...its probably a good practice so that the window installers do less works? i may be wrong though...

think about it, lets say the house you are living in now is already tiled, and therefore it doesn't make sense to me that you cannot change your windows or window grilles if it is a must that windows must be installed first.

better to check with them the reason, or another way is to call other window makers to clarify (since u wld be asking them to quote u as well right?)

 

Share this post


Link to post
Share on other sites

wordangel

yup, installation of windows must be done before tiling. but thats just for toilets windows. tiling starts next mon... =( headache...

gim

both my contractor and windows supplier say that =( windows supplier say can start tiling but must leave spaces so when taking out of old windows, wont risk the tiles getting damaged.

 

Share this post


Link to post
Share on other sites

Been busy these few days. Finally went to Poh Joo today and bought all the kitchen and toilet necessaries.

Decided to let our contractor do the windows work since we are only changing bedroom 2 window grille, service yard windows, toilets windows. Too much headache for me to outsource for windows work as the MBR toilet window must be installed asap so that tiling can be done.

Met up with our carpenter today. Finalised wardrobe and kitchen cabinets. No more changing for me haha! I was being real indecisive and can tell that Patrick is sick of it already. lol Hopefully the end product turns out ok.

16 April

Hacking of toilets, kitchen tiles is done.

15329_387333596459_597656459_3807934_394

15329_387333606459_597656459_3807935_335

20 April - Cement screeding day

Old common toilet door is sealed up.

15329_387333626459_597656459_3807937_145

Kitchen entrance. Moved the entrance to the right so that it is not align with my main door. Fengshui master said "Qi" will flow out of the house and it is bad for us.

15329_387333631459_597656459_3807938_749

Next 2 weeks, tiling.

Edited by Reira
 

Share this post


Link to post
Share on other sites

21 April

New store room and common toilet entrance

15329_387627276459_597656459_3813774_728

Kitchen

15329_387627286459_597656459_3813775_585

Right part of kitchen (where my hood and baking area is)

15329_387627296459_597656459_3813776_499

Left part of kitchen (back splash for sink area is up)

15329_387627301459_597656459_3813777_875

Master bedroom toilet tiles - Left side

15329_387627311459_597656459_3813778_192

Edited by Reira
 

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  

×