Skip to content
View in the app

A better way to browse. Learn more.

RenoTalk.com ™

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.

Our Very 1St Home (N & S) And Our 2 Princes & Princess

Featured Replies

  • Author

This evening I went over to our new house after work and see that the capentry work is 90% done. contractor has advised that the solid surface top will up this thursday. Just hope that my house can be fully done and clean up latest by early dec 2011. I have arranged with all the suppliers to deliver the furnitures and electronic items on 15 Dec 2011 and curtains will also install by that week as well. just pray hard that we can move in our new house by mid dec 2011.

following are the photos of the capentry works for bedrooms, kitchen and living room:

bedroom 2 wardrobe

SDC10953.jpg

SDC10952.jpg

  • Replies 55
  • Views 17.8k
  • Created
  • Last Reply

Top Posters In This Topic

  • Author

master bedroom wardrobe

SDC10951.jpg

SDC10950.jpg

SDC10949.jpg

SDC10948.jpg

  • Author

master bedroom bay window laminate

SDC10947.jpg

SDC10946.jpg

  • Author

master bedroom shelves, tv and study table

SDC10945.jpg

kids room study table with drawers and top cabinet and bay window laminate

SDC10944.jpg

SDC10943.jpg

kids room wardrobe

SDC10942.jpg

Edited by sccy2

  • Author

shoes cabinet with seat

SDC10939.jpg

SDC10938.jpg

house shelter feature wall

SDC10936.jpg

  • Author

my camera got problem can't take the real picture of the shoe cabinet and feature wall - the colour of the white is actually glossy pearly white without the lines.

  • Author

kitchen

SDC10935.jpg

SDC10933.jpg

laminated kitchen entrance

SDC10932.jpg

SDC10931.jpg

  • Author

living room false ceiling with T5 lightings

SDC10929.jpg

SDC10927.jpg

tv console feature wall

SDC10926.jpg

SDC10925.jpg

Hi,

Nice blog! :)

I noticed your living room has no downlights? Just T5 side lightings it seems. Are those bright enough to light up the whole living room? :yamseng:

Yes, I believe their kitchen is similar to my layout. But mine definitely can't fit a 2 door fridge. Until now, I still cannot phantom why my kitchen is smaller than a 4room unit. Haha.

Anyway, it looks almost completed! Your MBR can fit a study table. Wow. How many ft is your wardrobe? How's the workmanship for cpg btw?

I think the leadtime to do the curtains shld be fast - shld be 1-2 wks leadtime (also need to depends on the supplier schedule - seems now is coming year-end - will be busy). For me I have advised my curtains to be installed on the week 12-16 Dec 2011 but my wooden blinds will be delayed as materials imported delay (just hope that can do it by Dec'11). Yesterday I went to my friend hse warming - she stays in the condo..her curtains for living room and 3 bedrooms only S$1,200.

your kitchen can't fit a fridge but I went to blk 269A a 5 rm unit that my contractor has done - kitchen is small but the owner still get a 2 door side by side fridge - the sink is near the windows which outside is the aircon ledge and the cooking area is just opposite the toilet...i find it so crampy.

  • Author

Hi,

Nice blog! :)

I noticed your living room has no downlights? Just T5 side lightings it seems. Are those bright enough to light up the whole living room? :yamseng:

Thanks :D

I do have downlights but they are at the other end of the living room where the sofa is situated. They are 3 pcs of 6 1/2 inch downlights there but the switch for these downlights are yet to install as switch is situated at the house shelter feature wall.

SDC10929.jpg

SDC10837.jpg

  • Author

Yes, I believe their kitchen is similar to my layout. But mine definitely can't fit a 2 door fridge. Until now, I still cannot phantom why my kitchen is smaller than a 4room unit. Haha.

Anyway, it looks almost completed! Your MBR can fit a study table. Wow. How many ft is your wardrobe? How's the workmanship for cpg btw?

Oh yeah, my reno is almost 85 - 90% completed - everything should be ready latest by next week (cross my fingers :P )

the study table is just like a L-shape table with 3 drawers which link to the wardrobe so i can put my small TV (22") there or work/surf net with my laptop on the longer side of the L-shape desk. My wardrobe is 6ft but i find that the contractor actually get the capenter to do the wardrobe more than 6ft as it cover up the whole wall. So far i find the workmanship ok and i did see the workers doing and talk to them ..we are happy wif their workmanship.

So yr house reno already start? HDB already approved the hacking permit?

Edited by sccy2

Thanks :D

I do have downlights but they are at the other end of the living room where the sofa is situated. They are 3 pcs of 6 1/2 inch downlights there but the switch for these downlights are yet to install as switch is situated at the house shelter feature wall.

SDC10929.jpg

SDC10837.jpg

OIC... :) Thanks. :P

That's really nice! You must be busy with moving next week. Post your final pics! haha

My hacking has finally completed. We went down yesterday and they build back half the wall. Finally there's some progress!

Oh yeah, my reno is almost 85 - 90% completed - everything should be ready latest by next week (cross my fingers :P )

the study table is just like a L-shape table with 3 drawers which link to the wardrobe so i can put my small TV (22") there or work/surf net with my laptop on the longer side of the L-shape desk. My wardrobe is 6ft but i find that the contractor actually get the capenter to do the wardrobe more than 6ft as it cover up the whole wall. So far i find the workmanship ok and i did see the workers doing and talk to them ..we are happy wif their workmanship.

So yr house reno already start? HDB already approved the hacking permit?

  • Author

That's really nice! You must be busy with moving next week. Post your final pics! haha

My hacking has finally completed. We went down yesterday and they build back half the wall. Finally there's some progress!

Thanks sis! still can't do anything this week - just contacted the contractor and he said only can do polishing of the parquet flooring for the 3 bedrooms this Friday (still need to let it dry up for @ least 2 days) then next week will do the necessary drilling for clock, toilet accessories, etc and last whole house cleaning (just hope everything can be done before 15 Dec as all my furniture will be coming on that day)-cross my fingers

Create an account or sign in to comment

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.