New Hdb Regulation? Prepacked Screed For All Floor Replacement Works

Featured Replies

Hi All,

I just would like to confirm if the above is the new HDB regulation which some of the IDs mentinoed it will start on 1st December 2014 onwards.

Currently floor replacement is using sand, and moving forward there are using prepacked screed.

The big diif is if were to do both toilets and kitchen flooring. it cost extra of nearly $3k start December of the current quote now.

Went to few IDs yesterday for quote on my 4 room flat, and was informed of this new ruling.

Hoping some of the seniors here can comments....

TQ!

  • 3 weeks later...

Not a senior here but I guess it's true. My contractor told me the same thing. My reno is already half way through so he said I'm lucky

  • 4 weeks later...

Hi,

I just confirmed with the HDB officer in charge of my block. As of 1 Dec 2014 onwards, needs to use pre-packed screed. That's an additional cost to new home-owners! :help: He said the costs will definitely increase due to the material and workers' charge as the mix is not easy to handle. Try to apply for the renovation permit before 1 Dec 2014 to avoid having to cough out additional charges.

Cheers!

aSteRuS

Edited by aSteRuS

Please take note that this new ruling only applies to flooring.

  • 3 weeks later...

Does this ruling apply for the bases for washing machine, fridge, kitchen cabinet , and shower kerbs which are laid after the flooring is done?

  • 3 months later...

There are shortage of sand in our country. Even when HDB is doing home upgrading, they are using pre-pack cement for wall and floor area. As for laying of tiles they are using pre-pack cement with adhesive material.

I think pre-pack is good in the long run. I have very bad experience with my old flat renovation about 8 years ago. The workers have to mixed the sand and cement to form a mix and do the flooring and now all the ceramic tiles are popping out piece by piece. I suspect they add more sand and less cement to save cost.

Pre-packed is good as it comes already pre-mixed in the right quantity with the necessary additives added. It should also help with the adhesion of tiles without having them pop up. It's really all in the mix quantity and the additives.

Bummer about the price though!

  • 2 weeks later...

thought it extended to june 2015?

or maybe the ID's anyhow say...

i might be wrong though.... but im pretty sure it extended to june 2015

Edited by RetiredInteriorDesigner

  • 1 month later...

Pre Packed cement is new here and workers will find it very difficult to make the floor level.

The cost will also goes up.

Create an account or sign in to comment

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.