Should be FREE. Nego skills place a part here.
-
Since I'm tiling the cabinet side, my ID advised me to tile everything since the cost removing existing tile at the opposite side of the cabinet + plastering, cost quite "near" to fully tile. Cost difference maybe like ~$300. Full tile sounds more durable and yeah, you can ask your ID not to tile at the cabinet side since it's not exposed and you can save a bit from there.
-
so most of you all are using pvc or polyken?
-
Anyone uses the hydraulic hinges. Is it durable? I was in my col's house and seems like the hydraulic is not so smooth, is it poor workmanship or is it the hydraulic itself? Any alternative to solve this? Thanks.
-
Hi, I think if you want advice you should go to HN, Best Courts etc. Hong Liang are those that you need not the service and the best price. Anyway, I went to HL, they DID provide me with some good advice and service too. I was served by a rather plumb and short guy. Cheers.
-
Anyone can advise what is an average cost of a work/ computer table? Thanks
-
Mine is the Serta Louisiana. Initially looking at Missouri but decided on Louisiana as I can't really feel the difference and Louisiana is cheaper too. Bought it at Serta IMM.
-
How can I plan the number of points and lighting required? I heard from my friends that every corner should have one plug. Any tips of website that i refer to on how the lighting and points could be designed? Thanks
-
May I know when is this defects list done? Is it a must have for resale flats? Thanks
-
Anyone can recommend a good electric heater + storage? Any how many liters are required? 20 or 25 liters?
-
Hi applefreak, How can the contractor confirm? Did he test the water gauge? I found out that my block doesn't have city gas, I have to get either electric instant/storage heater.
-
Yeah anyone can tell us the pros and cons of gas heater. I'm on for gas cause it saves $. Cheerioes
-
GPlan
andrew77 replied to admin's topic in Renovation Contractors, Interior Designers & Suppliers Reviews
thanks niko!! -
ekardo, say my House will be ready in Mid Sept. Should I tell them to ship 1 month before hand, assuming they will delay for 3weeks, I still have some time to plan. BTW, what did you purchase there. Is it the "package"?
-
Yeah me same as you. Placed a deposit after reading from sgbrides. So when is your delivery date? Pls update us. THanks
-
GPlan
andrew77 replied to admin's topic in Renovation Contractors, Interior Designers & Suppliers Reviews
I also need Kelvin no. Pls PM. Thanks! -
GPlan
andrew77 replied to admin's topic in Renovation Contractors, Interior Designers & Suppliers Reviews
can someone pm me kelvin's contact too? tks!!