

Clementi_PR
Members-
Content Count
280 -
Joined
-
Last visited
Content Type
Profiles
Forums
Gallery
Everything posted by Clementi_PR
-
Halo baby81984, I think mine is more simple than yours You extend your master bedroom, and seal the door. I am just hacking the wall between living room and kitchen only. I will updating pics daily, keep an eye on my blog Still need more idea from all of the expert here
-
Halo Baby81984, Actually which one is your floor plan? The bedrooms is on the left side or ride side? I think we will finish our reno around same time. Looking forward for your reno pic too
-
We are planing to have 2 drawer on bottom cabinets subject to price. cannot afford all because budget concern Thanks a lot for your idea
-
Did you ask the contractor to redo the mismatch tile? I dont think it will cost a lot, since it was only couple meter2 only. Try to ask, how knows they will absorb the cost
-
Halo Gimz63251073, Same with my Mum too Actually the fridge is not really blocking the entrance Anyway, we live in net 2.0 era already, kekeke I prefer L shape because can hide the washing machine behind the sink. About the hanger, yes it will not hide the clothes when they are hanged, at least it will look nicer at night when i am home Of course the pipes will be seal, but it will not be using tiles i think, i will have to confirm this with Jasper. For the top cabinet, we plan to use a little bit cloudy glass, not the clear one. Thanks for the reminder BTW just got another call from HDB (6395581X) They already inspect the site, and confirm it is the board near the lift landing that cause the splash to the corridor. they will ask "Lift" department to fix it
-
Halo Rasfene, Thanks for your info, but we already decided and bought the sink And yes, it is more expensive, maybe because what i saw is not the stainless steel.
-
Halo James, Not sure, maybe the software they use.
-
Halo Gimz63251073, Actually final design is the top one. It will be L shape And behind the sink, there will be a washing machine. For the fridge i purposely put it there, as i don't have wall between living room and kitchen. Hanger for cloth is behind the sink too. I ask Jasper to build a wall to conceal the hanger For the space with cabinet, we will try to discuss with Jasper. Thanks for your idea. So far Jasper try to ask me to change the whole cabinet door on top to use a glass (just like in the left most cabinet) while i only prefer to change another 2 on the other end of cabinet. Price per door 80$ What do you guys think? Will it make the kitchen looks better? TIA
-
Somewhere Over The Rainbow In Jurong West~~
Clementi_PR replied to Mickey M's topic in Reno t-Blog Chat
Very nice design and well executed. Keep on posting the pic, very interesting to see the disney theme -
I use double bowl. That what Jasper said also, but somehow my wife prefer top mount I am not sure what the diff between solid n granite top. All i know it was not natural granite. It was a man made granite. Is it same with the solid top that you mean?
-
Finally got my 3d pic from Jasper. See anything that don't look correct? Any comments are welcome. I still need to change a bit on the cabinet door under the sink. But still need to wait for the final measurement on the site.
-
It is good for your reno project. You can do what ever you want for your new house All will be as per you like Looking forward for more pics.
-
Day 3 Nothing much have been done today, except a little bit on the both toilets. Turn out, they are waiting for the tiles to come. Tiles comes around 3:45 pm Some materials that will be use:
-
Thanks a lot for your info Rasfene. Will try browsing there too. BTW, which one you refer to? Hommage Furniture 263 Serangoon Central Dr #01-65 Singapore 550263 OR Hommage Pte Ltd 2 Leng Kee Rd #05-11 Singapore 159086 This is what i got from prof G
-
Don't worry bro, just keep updating your blog. Hope you can get the sofa of your dream
-
Day 2 All hacking work is done. Debris already gone. Ahead of schedule one day. So far very satisfied with Jasper work. Wall between living and kitchen is gone. Debris is cleared, sand and cement already there. Jasper said tomorrow can start the wet work. But good one bad news: HDB did not approve my plan to leveling the floor near the common bathroom, because it will exceed the minimum height between floor and window I am waiting for final 3d with the floor leveling amended. Will upload once i get it.
-
That surely match with my wallet Bargain? how should i set the price? I am really not good at furniture pricing I don't buy furniture weekly or even daily, kekeke
-
Kekeke, i know they sell mostly grocery. But, if the price is right, i don't mind Haven't decide will be Sat or Mon. Need to check my wife schedule also. She is the one who will decide the sofa, i have decided the tiles, bathroom accessories and washing machine
-
Thanks for the info Rondy, never thought it will take 1-2 month for delivery. I have the same thought with u also. Will use 3 seater sofa with a small and low coffee table. Got recommend from friend who live in AMK. He said fair price have a nice sofa selling for 700 (3seater) Definitely Will go to AMK this weekend to browse the sofa. BTW, just got call from HDB (6395581X) Saying that they will see how to fixed the water spill in my corridor. I just send a feedback to hdb website last night. Less than 24 hour got response already
-
So far so good, finger still crossed Now i am searching for sofa and dining table. Still don't have get one that me and my wallet like
-
Any updates on your house? Waiting for your pics
-
Day 01 - Hacking I never thought they will do it so fast. That machine really mean. I wonder how my bellow neighbor feels today Kitchen Living room Main door
-
Halo NGunadi, Not sure why. Maybe because the wet work is complete by then? Will try to ask Jasper about this. How is your place? Mind to share some pic on your blog I will try to keep posting pic daily.
-
More pics from the corridor:
-
Love the circles and colorful theme, Nicely done. I was quite amaze to see the circle bed. Is it custom made?