Contractor for HIP are not very skilful. I just done my tiles for toilet for HIP in Jurong in February. Took them 10 days even if its 1 toilet. Was told that tiles was not enough so I had to go buy more tiles but found out it was because they cut tiles wrongly and I had to buy 30 more tiles. Toilet was done but floor were uneven. Scratched my parquet floor. Paint along stairs were partly ripped off. The reason I had to sign up for HIP was because my master toilet failed the water proofing test. After the toilet was done, they did several rectifications to the uneven tiles. After the rectifications, I washed the toilet.. Guess what... Leaking to the toilet below causing the bottom floor toilet ceiling to have spalling concrete. All these defeats the purpose of renovating the toilet in the first place. Was told that they will redo the toilet again... Another 10 days.. Sibei Pek Cek...