Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

ILJ

Members
  • Content Count

    68
  • Joined

  • Last visited

Everything posted by ILJ

  1. F Partition Works 01 Supply & install L-shape divider partition (L14ft-H8.5ft) (At study room) $700 02 Supply & install ceiling L-box (L64ft-W16”) (**** hall) 03 Supply & install ceiling L-box (L45ft-W16”) (At dining hall) 04 Supply & install divider partition (L5ft-H102”) (At master bedroom) G Other 01 Paint whole house Nippon or ICI (5 colour) 02 Cardboard protection and chemical wash for whole house $576 $405 $350Subtotal $2031 $1700 $450 03 Haulage ,debris fee $450
  2. D Electrical Works 01 Supply & install light point 14nosx$50 $700 02 Supply & install double power point 11nosX$80 $880 03 Supply & install single power point 5nosX$70 $350 04 Supply & install water heater point 2nosx$100 $200 05 Supply labour to install light 14nosX$10 $140 06 Supply & install 20A isolator point 1nos $150 07 Supply & install SCV point 4nosX$100 $400 08 Supply & install tel point 4nosX$60 $240 09 Supply & install D.B box (12/18) way $350 10 Supply & install hood point 1nos $65 11 Supply & install oven point 1nos $100 12 Supply & install 2 way switch 2nosx80 $160 Subtotal $3735 E Door Works 01 Supply & install tempered shower screen glass door (At common toilet) $500 02 Supply & install tempered shower screen glass door (At master toilet) $500 03 Supply & install PD door 2nosX$480 (At mater toilet & common toilet) $960 04 Supply & install tempered sliding glass door (L36”-H96”) (AT study room) $850 Supply & install fix tempered glass with frosted (L6.5ft-H8ft) (At study room) $1300 05 Supply & install tempered sliding glass (At kitchen entry ) $850 Subtotal $4960
  3. C Plumbing Works 01 Supply & replace the whole house stainless steel cold & hot pipe 02 Supply labour to install toilet bowl for 2 toilet 03 Supply labour to install basin and tap for 2 toilet 04 Supply labour to install shower tap for 2 toilet 05 Supply labour to install accessories for 2 toilet 06 Supply labour to install storage heater 1nos 07 Supply labour to install kitchen sink and tap Lump-Sum $1600 Subtotal $1600
  4. B Wet Works 01 To supply & lay floor tiles at master toilet $650 02 To supply & lay wall tiles at master toilet 291sqtf $2328 03 To supply & lay 3-in-1 waterproofing at master toilet and common toilet $500 04 To supply & lay floor tiles at common toilet $650 05 To supply & lay wall tiles at common toilet 302sqft $2416 06 To supply & lay floor tiles at kitchen 190sqft $1520 07 To supply & lay waterproofing at kitchen $150 08 To supply & lay wall tiles at kitchen 531sqft $4248 09 To supply & lay vinly flooring **** hall, master bedroom, room 2 & 3 $6493 999sqft 10 Construct cement base for kitchen cabinet (L25ft-D20”) (At kitchen) $625 11 Construct washing base and fridge base with tiles finished (At kitchen) $300 12 Touch up the wall, door frame wall and kitchen entry $300 Page 1 of 3 13 Construct hollow wall to seal up the door entry at master bedroom $500 14 Construct hollow wall to seal up the door entry at common toilet, $800 Master toilet and master toilet Subtotal $21480
  5. Items Description Amount A Dismantling & Demolition Works 01 To hack the toilet floor tiles and wall tiles (At common toilet) 02 To hack the toilet floor tiles and wall tiles (At master toilet) 03 To hack kitchen floor tiles and wall tiles (At kitchen) 04 To hack kitchen sink support (At kitchen) 05 To hack the toilet wall entry (At common toilet) 06 To hack the skirting (**** hall) 07 To hack the false wall and door frame (At room 2) 08 To hack the false wall for door frame (At master toilet) 09 To hack the floor tiles (At balcony) 10 To hack the wall at kitchen entry (At kitchen) 11 Dismantle & disposal the existing wardrobe and kitchen cabinet 12 Dismantle and disposal cornice 13 Dismantle & disposal the wardrobe (At master bedroom) Lump-Sum $4500 Subtotal $4500
  6. starting of with Electrical Per LED light points $35 Install downlight $9 per pc Install Track light $45 Install hanging light $70 Per SCV cable point $110 Light dimmer $50 tbc...
  7. Hi guys, I've identified a standard norm for the reno cost by item .i will share it soon, Please feel free to comment or suggest . cheers
  8. Hi guys , Please advice on this quotations and feel free to leave your suggestion even to DIY. i m more of a DIY person but wifey against it Thank http://i.imgur.com/3hjawi3.png http://i.imgur.com/Z5wTxvt.png http://i.imgur.com/bZLLEbx.png http://i.imgur.com/cZy7NWb.png
  9. today i took a drive around those hdb flatted factories to learn a thing or two abt woodwork's since im looking for a custom design wood piece decoration now. To my amaze i found some very low quotes just by walking in to these factories and talking to the bosses. Please dont ask me the address as i went to almost half of singapore factories. Anyone used them before ?
  10. I remember seeing somewhere bose501 ceiling speaker the range is abt $500 for 2 sets. I mean real speaker that attached to ceiling just like the ceiling downlights. I believe its for commercial usage but residential no problem too.
  11. Hi yc_mw , congrat, We were hunting for unit there for some time but didn't get any good one. there was one low floor indian house for sale for quite some time still haven't sold i think. I believe its 13FIVE ? facing the main road of yck ?
  12. they have Facebook. leave a public comment and tag them to warn others. https://www.facebook.com/SIllusionDesignPteLtd thanks for sharing.
  13. hi please quote this 1. hack existing tiles and re tiles for 2 toilets 2. hack and re tiles kitchen 3. create small wall to install door for yard area 4. hack balcony tiles and replace tiles thanks
  14. oh shrucks. But what is consider and renovation and whats not ? Some parts falls into DIY too
  15. here is the video for installing false ceilings
  16. Things i planned to outsource: 1.carpentry works 2.electrical 3.waterproofing Things i planned to DIY () false ceileing, cornices laminate works tiling home garden minor pipings minor electricals (no touching of DB)
  17. Hi Guys, Just confirm a unit at north. Its 5I with balcony. 3-4 more months more to get the keys, but im already start planning The house condition is such that rooms are well laminated, air corn trunking done, basic wall cornices done. I'm more of a DIY guy i was wondering if i could reno the whole house myself together with some workers i planned to hire. I understand that HDB permit is needed for reno but i am not entirely sure which area that i should not touch .I believe hacking walls and waterproofing works need to engage a contractor. The scope of works im expecting hack balcony tiles and replace with balcony design tiles. hack 2 toilets and replace tiles and sanitary fittings design a sunken shower area in MBR toilet - not sure if this is legal laminate living, dining, and walkways to bedrooms hack kitchen tiles and re-tiles , create a yard area to place dryer and washer and a laundry cabinet
  18. Hi, from your description it seems like the ID walk away cause you start sourcing for your own items then letting them source for you , as i believe they do mark up the price from vendors. in this case the ID don't earn as much as she/he planned. Generally ID earn 20-30% of the quotation in total excl product markups. Good luck on your Reno. Hope it goes well. If you dont mind , pls PM me the ID. Thanks
  19. does he complete reno works? Pls PM me his number. thanks
×