Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

lonerboi

Members
  • Content Count

    22
  • Joined

  • Last visited

Everything posted by lonerboi

  1. Reserved for photos uploads tonight
  2. Hi Tim, I would like a quotation for MXY-4A38VA - 3x MSY-GE10VA + MSY-GE24VA. 2 trip installation. Thanks. cheetaj@gmail.com
  3. I used chief architect. Not a free software, quite easy to use. But they provide a 30days free trial which is more than enough.
  4. Attached my own done up floorplan and 3d drawing.
  5. lonerboi

    My house

  6. lonerboi

    Layout Final 23 6 15

    From the album: My house

  7. lonerboi

    Layout Final 23 6 15 3d4

    From the album: My house

  8. lonerboi

    Layout Final 23 6 15 3d3

    From the album: My house

  9. lonerboi

    Layout Final 23 6 15 3d2

    From the album: My house

  10. lonerboi

    Layout Final 23 6 15 3d

    From the album: My house

  11. Haha, you are right, today when I visited my unit, I found pencil markings on the wall 1 I/We, ______________________________________________________________________________ I/We, _________________________________________________________________________________ I/We, ______________________________________________________________________________ intend to lay carpet/vinyl tile/linoleum/parquet/timber flooring (including laminated and bamboo floorings) the following location(s)# /parquet/timber flooring (including laminated and bamboo floorings)/nothing* at /parquet/timber flooring (including laminated and bamboo floorings) of our new flat:
  12. u don't plan to sell this flat rite? Cause i don't think concealing of electrical cables like this is allowed... Technical Terms and Conditions1. All wiring installation work must be executed by an EMA licensed electrical worker 2. Embedding of wiring house in metal/high impact PVC conduit in RC slab, beam, column, wall and in wall plaster or other finishes is not allowed
  13. Overlay? I'm screeding not overlaying, and only for my living + bedrooms cause i did not take OCS and want to do laminates.
  14. Step 1: Screeding is finally completed Step 2: Awaiting tiles from Hafary to arrive from China, ETA 29~30th Aug 2015. Step 3: Aircon was paid downpayment to AJ, seems like the group buy dealer at our Sunshine Gardens Estate. Going for 1x28VA to serve 2x GE10 and 1x GE24, 1x10VA to serve 1x GE10. Step 4: Grohe rainshower purchased @ 50% discount from Asia Excel(SG50 50% till end of Aug 2015) Step 5: Kitchen sink/tap, hob/hood, toilet sink/vanity paid deposit for Hoe Kee Step 6: Kitchen top selected at Lian Hin, granite Emerald Pearl Step 7: Brought ID to blum to experience the kitchen we want Step 8: 35L Joven Storage heater purchased.
  15. spotted the top kitchen cabinet doors are misaligned. U planning to fix them?
  16. hi, any problems fitting your rain shower set?
  17. Just gotten my key to my long awaited BTO without flooring and doors...My floor plan... With the opening of door etc, as usual I was greeted with various defects from hairline cracks on the wall, broken/chipped tiles, slanted socket points/ tap etc etc. Have yet to decide on an ID, new updates from recommendations and blog.1) Kaze, a freelance ID(Previously Ciseern)<--- eliminated due to too much sales talk and over promising.(45k) 2) Ted ID<---Still considering as one of the more professional ID, however budget constaint.(50k) 3) Inside Story(Previously Inside Story Pte Ltd, Previously Summit Design)<---Too busy to entertain me. 4) Renoguyz Nick(ty jasminnie)<--- too busy to entertain me, comes up with lame excuses like eye not good, assistant do the quote etc. 5) SimpleReno Melvin<--- Too slipshort 6)Absolook Zhi Ying<--- Met him during their roadshows, 3 weeks later msg me cmi for the quote. Never heard of concrete support or platform using raised floor sucker to open etc. After going through a few t-Blogs, eg: Freb, leonjennawong etc, I managed to get a few concepts and idea... After 2 months of filtering and interviewing, I have decided to engage Ace Space Design, Zion Yeow for my house renovation. Not only was she sincere(maybe cause staying nearby), she was also able to give me the lowest quote(literally squeezed dry) amongst all the other ID. Viewed her completed project and found the workmanship to be acceptable. Signed her last Saturday. Reserved for future updates...
  18. hardware shops shld sell standoffs for washing machine in 4xcube shaped. shld not cost >$10.
  19. I've recently engaged a contractor who did my wet works, just checking if this is the norm, if not how do i get it rectified. A contractor went door to door claiming he was engaged by hdb to do flat repainting and to check if the ceiling are leaking. I found out later that HDB list them as bogus contractors. Power sense enterprise, Roy Tan 90952812 claimed that he is from some big company with various small departments handling different type of renovations. The one that does wet works will be power sense. Toilet sewage pipe/kitchen waste pipe 900 squatting to sitting bowl 650 repiping stainless steel 1200 dustbin cover foc. The current stainless steel pipes are connected with copper joints, they informed that it was stronger as stainless steel joints are just plated. True? My squatting bowl is not hacked away, just a pvc pipe covering the existing hole leading to the sitting bowl and sealed up with white cement. From what i know it is not per HDB regulations, but HDB did not want to commit that it is not the right way. Currently my new toilet bowl area is "curved" in due to the design of water drainage to the squatting bowl, and with the worry of choke and slow water drainage, any ways for me to get the contractor to redo, or better refund the money as i do not have confidence in their works anymore.
×