Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

jwchu168

Members
  • Content Count

    6
  • Joined

  • Last visited

  • Days Won

    1

jwchu168 last won the day on November 7 2015

jwchu168 had the most liked content!

Community Reputation

2 Neutral

About jwchu168

  • Rank
    Member

Previous Fields

  • Gender
    Male

Recent Profile Visitors

The recent visitors block is disabled and is not being shown to other users.

  1. Feeling surprised that no many replies to this very important question.. Getting a feeling that perhaps most posters in this forum are from the industry and not keen to reveal. It feels like a classic switch and bait tatic...always say that detailing comes later and that's where the additional cost will be added..Future buyers please beware. Do all your detailing upfront if possible or at least make clear what you expect in your cupboards and have every item listed down in your quotation
  2. Hello Renotalkers, Like to seek advice from seasoned forumers as I'm re-doing my home current. I noticed the market rate for Kitchen Cabinets is around $120 pfr which was what my ID quoted for me. However, when we are doing the detailing, he is charging me extra for things such as these... Saucer Rack: + $220 Drawers: +$600 for 4 drawers using Blum track (Apparently $120 pfr only gets cupboard door...not Drawers) Bi-Fold Door for Corner L-shape: + $150 Extra 4ft of counter Top w open-concept Internal PVC for Washing Machine: +$550 Dish hanging rack w glass cover: +$250 Just like to check if this is normal? in my previous renovation where I had 2 Saucer Racks and Dish-Hanging rack, there was no VO....has there been a change in market standards? Thank you very much renotalk.
  3. Hello All, Hoping to seek your advice if the latest quote is inline with market or have furthur room for improvement? My ID claims that this is the best best price they have already but I think best to consult the shifus here. Thank you in advance. Rgds Colin ITEM DESCRIPTION- Project Documentation and administration $ 1,000.00- Supply labour and material to protect and clean the affected apartment at level 1 and 2 $ 1,400.00- Supply & install plaster ceiling board as proposed at following area;Living & Foyer (284 sq ft) $ 1,800.00- Supply labour and material to paint 2 levels (Emulsiion + base sealant coat $ 2,600.00 - HACKING AND CONSTRUCTION WORKS; $ 6,000.00a. Remove existing Balcony railingc. Remove existing sliding door between Balcony and Livingd. Remove existing wall at Service yarde. Remove existing wall at Kitchenf. Remove all existing cabinetg. Remove all existing sanitary waresh. Remove all existing floor tiles in Kitcheni. Remove all existing wall tiles and floor tiles in Common Bathroomj. Remove existing roof in balconyk. Remove existing wall tiles and floor tiles in Master Bathrooml. Remove existing wall tiles and floor tiles in Common Bathroomn. Remove all existing sanitary wares at Master and Common Bathroom Construction works as per following;- Supply labour and material to lay cement screed for affected flooring and wall as per following;Kitchen $1,000.00Helper room and Store (Incl. to construct new Hollow block wall) $3,000.00-Common Bathroom (Incl. to construct new Hollow block wall) $2,400.00 To construct and lay HERF Flooring with wooden skirting as per following;-Living, Foyer (530 sq ft)$ 3,600.00-Balcony (214 sq ft) $1,400.00-Helper room (73 sq ft) $500.00-Store (73 sq ft) $500.00 - Supply labour and material to install kitchen kerb in selected material and finishing. $500.00- Supply labour and material to lay waterproofing in Common bathroom and Kitchen. $400.00- Supply and install partition wall at the following area;- wall divider to Store and Helper room (L2000 mm)$500.00- Supply and install Aluminium Composite Panel Roof at Balcony. $3,500.00- Supply and install Enclosed Full height window casement in selected finishing. (L6400 mm) $ 3,500.00- Supply labour and material to lay cement screed for affected flooring and wall as per following;Master Bathroom $ 3,000.00Common Bathroom $ 3,000.00Supply labour and material to lay waterproofing in Master Bathroom and Common Bathroom $400.00Clearing debris after hacking $ 300.00 PLUMBING WORKS ($2,400)- Supply labour & install as following; (Accessories by owner)a. To run new copper water piping for 2x Common bathroom,1x Master bathroom and Kitchenb. To install sanitary bowl, basin,and taps/mixers a 2 x common bathroom and 1 x master bathroomc. To install all the accessories at 2x Common bathroom and 1x Master bathroom CARPENTRY & FURNITURE- Supply Top and Bottom cabinet in selected material and finishing. (L5950 mm) $6,300.00- Supply & install Solid Surface Counter Top in selected finishing. (L6500 mm) $1,500.00- Supply & install Vanity Storage with Solid Counter Top in selected finishing. (L800 mm) $800.00Supply & install Vanity Storage with Solid Counter Top in selected finishing. (L1200 mm) $1,000.00Supply & Vanity Storage with Solid Counter Top in selected finishing. (L800 mm) $800.00 M&E WORKS (note. All the light fittings purchases by owner)- Supply & install necessary electical point on the affected area; $ 5,500.00a. lighting point 49 nos.b. power point 20 nos.c. TV point 2 nos.d. Data & Voice point 2 nos. - Supply labour & material to Glass Shower Screen for 3 bathrooms $ 2,400.00- Supply and install Tempered glass backsplash in kitchen. (L4700 mm) $ 1,300.00 Special Discount $ 3,300.00Grand Total $ 59,000.00
  4. Hello Tiler Seng, Are you able to do Balcony Enclosure works for a Old Walk-up apartment? - New Roof - Windows - Half-height walls - submissions Please PM if you can. Thanks
×