Everything posted by zph19101
-
Walk in wardrobe with doors
Hi, Im pm you k.
-
Walk in wardrobe with doors
Hi, I also thought of doing spray painting on carpentry for my Victoria wardrobe and cabinet. I almost fainted when I saw the price. Haha. So I went to did it with carpentry. Turn out to be better than what I expect. Here are some photos.
-
A Baker's 3 room BTO @ Skyline II
zph19101 replied to matchalatte's topic in Reno t-Blog Chat - HDB BTO Interior Design and Renovationim not sure already.. need to seek advise from the experts
-
A Baker's 3 room BTO @ Skyline II
zph19101 replied to matchalatte's topic in Reno t-Blog Chat - HDB BTO Interior Design and RenovationHi, Im not sure about item no 1. For item 2. Under HDB ruling, no hacking is to be done in kitchen and bathroom. But owner can submit for approval to conceal the 2" drainage pipe under your present kitchen flooring. I suppose there might be some undertaking. Correct me if i am wrong.
-
4 room resale
-
4 room resale
Overall quality of sink 9/10. The thickness is about 3mm. Request my ID to drill another hole on sink for water filter. He managed to get the hole drill but broken one drill bit.
-
4 room resale
Bought this sink from taobao. The sink thickness is thicker, dunno whether good or bad . Waiting for the caeserstone worktop, should be on Tuesday.
-
4 room resale
close to 60K..
-
4 room resale
Thanks.
-
4 room resale
More photos.. ID mention that these carpenter/installer are the one fabricating the carpentry inside the factory. So they know how to install.
- Top @Kew Drive
-
4 room resale
Coming to the last stage of reno. These few days will be carpentry works. ID just updated me with some photos. Didnt expect so much carpentry.. Occupying almost the entire lift lobby..
- Renovation @ Keat Hong Axis
- Top @Kew Drive
-
4 room resale
Hi, I have pm you.
-
5-Room Resale (Light Industrial) Learn & Share
Hi, u did your bathroom tiles in staggered? Didn't your ID inform you about the problem? Because tiles are not 100% flat. Therefore you will feel the tile edge when rubbing against the tiles.
- 136 replies
-
- 5 room
- industrial
- resale
- tips
-
Tagged with:
- Reno Quotation Reviews
-
Is this reasonable?
the quotation is not detail enough. and carpentry prices are subjective to design. Im renovating my resale now. You wanna contact my ID for a quote? I feel that mine was reasonable and detailed.
-
Opinions on quote needed
Hi, Im also renovating my resale right now.. You wanna contact my ID for a quote? I got mine quite similar to yours. PM me if you need.. Thanks
-
Concealing water pipe in living room
No problem..Helping each other makes a better day.
-
4 room resale
Have not been updating for past few days. Not much works going on. First coat of painting is done. Looking forward to carpentry works soon.
-
fifteenmay's 5 room resale
zph19101 replied to fifteenmay's topic in Reno t-Blog Chat - HDB Resale Renovation & Interior DesignIf your unit present wiring is exposed. Your new wiring has to be exposed too (Under HDB ruling). Concealed wiring is done secretly. Of course concealed will be slightly expensive than exposed. Usually concealed will be $30-$50 more per point.
-
4 room resale
Wet works is almost done. Check on the grouting, quite impressed with the workmanship. Grouting space is very uniform, no chips on my precious tiles.
-
4 room resale
Because it's on a quite tight schedule to complete the reno. Our ID pre arranged his workers to standby for us. Up till today, everything is going well. False ceiling works also completed in 2 days. Of course before this, electrical wiring has to be done first.
-
4 room resale
Wanted to hack new bedroom and bathroom entrance. But HDB don't approve without a PE endorsement. So bo bian, this money can't save. (There are re-bar inside these wall) Hacking works completed within 3 days as promised by ID. He's really a responsible and trustworthy person. Daily updating with photos send to us. Thumbs up for him.