Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

Angel81

Members
  • Content Count

    4,058
  • Joined

  • Last visited

Everything posted by Angel81

  1. Yah! Can't imagine if it's all gone. Hee.. thanks! Glad that it turned out well.
  2. Hee... Well, at least it's over, and rondy was kind enough to remove the pics after requesting him to. Haven complete leh! Hehehee... Still got sme electrical works haven finish, abit of painting left (doors & touch up), carpentry! and lvl1 marble polishing. Can't wait till we can shift in! Furniture all haven arrive. Delivery date is 23 March!
  3. I also kept wondering if our blogs will be wiped out or messed up! So glad that everything is still fine. Thanks RT! Oh I totally understand how u feel! It's been sooo boring w/out RT these few days! My first update actually got posted 3 times! So edited with pics. hhehhe
  4. PIL Room painted. Can see the cream walls & the white door? AC guy touching up in Bedroom 3 MBR with air con fixed! See the fixed up downlights? Love my room! Amazing thing is that my contractor told me that the lvl2 marble has been polished! Left downstairs only. So should be very fast liao! Wah, carpentry so long one ah? Bobian I guess. But I can't wait to see the carpentry! Yupz, got chemical wash. Yah! Now that I've seen it in sunlight, I think it's real pretty! Can't wait to see it in yellow light. I rem it'll look kinda pinkish from another forumner's pics. Gorgeous..... *Bleah* U see my pics? The cream is sooo light. Hahha, I would have chosen a darker cream if it's up to me. But it looks bright lar. Finally! I tried in the morning around 9plus still cannot leh. Sad... So happy that now can liao!
  5. Kitchen Light Fixed! PIL Bedroom Light Fixed! Bedroom 3 Light Fixed!
  6. Pics Pics! Level 1 Cheery yellow feature wall @ Living Room! Relaxing balcony Foyer & Kitchen
  7. OMG!!! Finally!!! I miss RT and u guys so much!!! So glad that it's finally working. Everyone, faster update ur blogs to let us know what has been happening for the past few days k? We must post more to make up for the past few days! My Update I'm totally in love with my new home. The whole house has been painted. Only the doors need to be painted after the white wash dries, and some touch up after carpentry is up. Totally in love with the place. Paint really does wonder to a house, and the whole place looks totally different now! All the lights have been fixed except for dining and foyer pendant light. But there are no lights yet, as the electrician has yet to fix the switches. The aircon and compressor were fixed today. Cool air has circulated the rooms. Amazing thing is that my contractor told me that the 2nd lvl and staircase marble has been polished! After carpentry, the marble at dining & living room will be polished. Carpentry will come in on Monday, along with the PD/bi-fold/glass doors and shower screens.
  8. hahahha! Ur description of ur parents.. so cute! Can just imagine them running with bowls to the living room.
  9. Hehehe, thanks thanks in advance! How's ur preparation to shift coming along? Don't stress urself too much k? Anything u need, ask someone to do it.
  10. Hmm.. For those area that can be seen, it'll be better to plaster them bah. What if you don't wana do the box up in the end? Then the rockstone will be very obvious woh. My contractor told me that the DB box must be very accessible. That time, I wanted my DB box to be positioned very high, almost to the ceiling. But he said it should be at a height most of us can reach. Imagine power trip at ur house, and u need to search for a stool/ladder to reach the DB box. You'll be searching for it in the dark, and may fall. Not good to hide/put way up high if you have old pple/preggies at home. In the end, he's just going to put it slightly higher then recommended for us. Okay lar, at least ur stuff can be delivered tomorrow. It should be installed before the weekend! Really the previous owner for the rockstone DB box.
  11. Haha! U r most welcome to ask anything. Good things should be shared. Save lots of time by going to those recommended shops instead of going to all the shops.
  12. Think it should be fine too. Most impt is that u like them.
  13. Welcome! Wah.. EM in that area is rather x leh! Well, if you know what u wana renovate, and have some ideas, then a contractor will be good enough. If you have totally no idea what to do, then an ID will be able to assist you. Just note that if you are going to change the staircase railing, most likely you'll need to change the staircase flooring, cuz the hacking will spoil the flooring.
  14. Hee... Agree that that's the good thing about Yeak. He won't do what you want to earn more money. He'll give advice accordingly.
  15. The place looks really well kept! Will you be keeping the floor tiles? They look very good.
  16. Congrates! Ur 2nd appt date is just 1 week away. Must be very excited now. All the best for ur reno!
  17. My red & white kitchen? Yah, still going ahead with the colours. That's why chose white kitchen wall tiles to bring out the red cabinets loh. I'm not too sure when he's going to do my carpentry also leh. But if according to what he said, this week finish painting, next week should be polishing my marble floor. So I guess should be around end of next week, or the week after (3rd wk of March) then do my carpentry bah. Hee.. Yupz, u told me about ur delivery liao. The installation of those stuff super fast. Mine delivered early afternoon, and by end of the day, those that can be installed were installed liao. I think my rewiring took about a week. I rem it started early last week. End of last week end mostly finish. When we went there on Sunday, there was still a ppt outstanding, and some touch up to the electrical works were still needed. But the false ceiling/L-box was super fast. Completed within the day.
  18. I think that's how contractors do it leh. My seller also did plastering for the whole house. But when we hacked away the cabinets/wardrobes/air con, there were still rockstone hidden behind them. If you wish to plaster the whole area, maybe u can check with ur contractor about it? But well, out of sight = out of mind. For me, I'll act blur and point it out to him, and just listen to what he says. After that, ask for more freebies to "cover" this.
  19. Hee.. Icic. Plain white walls will bring out ur kitchen cabinets' colours. I also chose all white kitchen wall tiles for the same reason.
  20. Wah, then u veli lucky! Mine got pipes everywhere! 1 pipe can be seen at the balcony. And pipes can be seen at all 3 toilets some more.
  21. Ooo! Congrates! Finally can continue with ur reno.
  22. Harlow harlow! Hee... Currently still dun have. When we went up on last Sunday, nuting much was done. Just alittle bit more electrical works completed only, and pails of paint. My hb will be going over tml to take the lights delivery. I'll get him to take more pics to show. Hope that tomorrow will have lots to show!
  23. Wah... All demolished. Cools. Did u take pics of the tiling that has been done so far? Wana see the tiles that u've selected. The pics are big, cuz they're in they original size. Can try resizing them, and they'll become smaller.
  24. Hee.. Good deal right? It's just $80 extra compared to the 8kg one. Worth considering. Love ur kitchen! Very clean look with lots of counter space. Cool! Looking forward to ur unit number sign, and congrates on confirming ur shifting in date. That's a good date (cuz it's my bdae )
  25. Hee.. Think it'll be better if my carpentry are done liao then u come c c. If not, no point. Best will be after 23Mar bah, cuz that's when most of the furniture will be delivered.
×