Hi all,

Pls advise if the following is reasonable. :dunno:

I told him that my budget is 18k then slowly increased to 22k(quite normal after some additions) and after we seen the FS master it has increased to close to $25k. Pls advise if the following is ok and should there be anything that we can try to reduce our cost.

(One example) My friend told me that I should try to nego for a demolition for a 1 time price. My contractor told me his margin is very less now or is there still room for nego?

Thanks in advance. :(

**Blue fonts are must have

HACKING / DEMOLITION WORKS

To hack existing floor tiles at kitchen & 2 bathrooms. $ 250.00

To hack existing wall tiles at kitchen & 2 bathrooms. $ 500.00

To demolish existing sink support at kitchen. $ 100.00

To dismantle existing kitchen cabinet. $ 150.00

To dismantle existing water pipes, sink, heaters, toilet bowls & wash basins. $ 150.00

Haulage. ( loading of goods & materials ) $ 300.00

To supply 1 no. of skip tank container to collect debris. $ 150.00

To clear & disposal of debris to MOE dump site. $ 200.00

To supply plaster sand for cement screed. $ 300.00

To hack & plaster smooth 1.5 feets, full height wall at common bathroom entrance. $ 300.00

MASONARY WORKS

Supply & lay HDB approved 3 in 1 water proof screed with K11 water proofing membrane $ 450.00

at kitchen & 2 bathrooms floor.

Supply & lay 300 by 300mm, non-slip, homogeneous floor tiles at kitchen & 2 bathroom $ 900.00

Supply & lay ceramic wall tiles at 2 bathrooms. ( Up to ceiling height, 2 tones ) $ 1,800.00

Raise up 50mm U-shape cabinet base with tiles skirting finish at kitchen. $ 220.00

Raise up 50mm fridge & washing machine base with tiles finish at kitchen. $ 240.00

Construct shower kerb with tiles finish at master bathroom. foc

Supply & 3 feets, half height to ceiling black glass tiles at stove area. $ 400.00

Supply & lay ceramic wall tiles at kitchen. ( Up to ceiling height, 2 tones ) $ 1,800.00

Construct 2 nos. of wall ledge with tiles finish at 2 bathrooms. foc

Construct & plaster smooth 1.5 feets, full height wall at common bathroom entrance. $ 400.00

Supply & lay 1 piece of tile of door kerb at main entrance. foc

Supply & lay 2 feets, full height mosiac tiles at kitchen. $ 300.00

CEILING WORKS

Construct L-box with curtain pelmet **** room. $ 600.00

Construct false ceiling at foyer area. $ 200.00

Seal up both side louver with plaster board at bedroom 2. foc

Construct L-box at master bedroom. $ 300.00

PLUMBING

Supply & install stainless steel pipes for whole unit. ( cold points ) $ 700.00

Supply & install 2 nos. of hot/cold points for shower. ( $60 per point ) $ 120.00

Supply & install inlet/outlet pipes for sink, washing machine & wash basins. $ 160.00

Provide labour to install 1 no. of sink at kitchen. $ 60.00

Provide labour to install 1 no. of storage heater at bathroom. $ 80.00

Provide labour to install 2 nos. of wash basins at bathroom. $ 100.00

Provide labour to install 2 nos. of sitting toilet bowls at bathroom. $ 160.00

Provide labour to install accessories at 2 bathrooms. foc

DOORS / GATES / WINDOWS / GRILLES

Supply & install 3.5 by 7 feets, designed, wrought iron gate at main entrance. $ 400.00

Supply & install 2 sets of wire glass, adjustable louver windows at bathroom. $ 300.00

Supply & install 1 set of 2 panels, sliding aluminium, frosted glass door at kitchen. $ 480.00

Supply & install 1 set of 1 panel, sliding aluminium, frosted glass door at common bathroom $ 380.00

Supply & install 1 set of 1 panel, sliding aluminium, frosted glass door at master bathroom $ 420.00

Supply & install 1 set of 10mm thick, frameless, temepered glass, wall to wall shower $ 600.00

screen at master bathroom.

Supply & install 1 set of aluminium clothes hanger at kitchen. foc

Supply & install 1 set of stainless steel, flat, auto lock, rubbish chute hopper at kitchen $ 180.00

Supply & change 4 nos. of door handles. ( 3 bedrooms & store room ) foc

GENERAL WORKS

Furnish whole unit wall & ceiling with ICI or Nippon emuision paint. ( 5 colours ) $ 1,100.00

Ceiling white colour.

3 coats, 1 white base coat & 2 colour coats.

Include painting of pipes, doors & door frames.

Furnish whole unit ceiling with water base sealer. $ 300.00

MISCELLANEOUS

HDB permit submission. foc

Chemical washing for whole unit. ( Include washing of windows ) $ 200.00

Supply & lay currogated paper roll to protect flooring. $ 150.00

Supply & install 3 nos. of stainless steel floor traps. foc

CARPENTRY WORKS

Living/dining room

Fabricate & design 4.5 feets, half height, solid ply-wood, laminate, shoe cabinet with $ 630.00

aluminium ventilation on the doors. ( $140 pfr )

Provide labour to install 1 set of string curtain. foc

Master bedroom

Fabricate & design 8 feets, solid ply-wood with laminate, full height, sliding wardrobe. $ 1,600.00

( $ 200 pfr )

Fabricate & design 27 inches long, solid ply-wood, laminate, suspended dressing table. $ 225.00

( $ 90 pfr )

Kitchen

Fabricate & design 36 feets, solid ply-wood with laminate kitchen cabinet. ( $90 pfr ) $ 3,240.00

ABS trimmings

Designed handles

1 chest of 4 sliding drawers

2 panels of sand-blasted glass doors

1 set of 2 tier stainless steel dish rack

Supply & install 26 feets, solid surface work top. ( $70 pfr ) $ 1,820.00

Provide labour to install 1 set of cooker hood & hob. foc

Common bathroom

Fabricate & design 5 feets, solid ply-wood with laminate, suspended low cabinet. ( $90 pfr) $ 450.00

Supply & install 5 feets, solid surface work top for suspended low cabinet. ( $70 pfr ) $ 350.00

Master bedroom

Fabricate & design 2 feets, solid ply-wood with laminate, suspened low cabinet. ( lump $ 300.00

sum )

Supply & install 2 feets, solid surface work top for suspended low cabinet. ( $70 pfr ) $ 140.00

 

Share this post


Link to post
Share on other sites
Looking for good contractors? Click here for your request
PM u liao

I saw already. This contractor that time is the most competitive price but then after add this and that seems like the cost really risen significantly. I'd follow ur advise and try to see see look.

The rest any additional comments and maybe recommend me and ID too? THanks

 

Share this post


Link to post
Share on other sites
I saw already. This contractor that time is the most competitive price but then after add this and that seems like the cost really risen significantly. I'd follow ur advise and try to see see look.

The rest any additional comments and maybe recommend me and ID too? THanks

Then all the more you should look for more quotes to compare and understand the market

 

Share this post


Link to post
Share on other sites
can someone pls advise? :thumbs up:

really stressed now

call for MORE quotations - your stuffs are quite standard works. nothing difficult to do.

check out renovation firms section.

 

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  


×