nanobio 0 Report post Posted December 6, 2008 4A HDB, Master Bedroom and corridor floor renovation: Hacking Works Supply material and labour to hack existing floor finish at Master Bedroom and corridor $400.00 Provide Sand, Haulage services and debris removal fees $300.00 Masonry Works Supply and lay 600 mm x 600 mm homogeneous floor tiles at Master Bedroom. $850.00 Supply and lay 600 mm x 600 mm homogeneous floor tiles at Corridor. $200.00 Total: 1750 Share this post Link to post Share on other sites
kewin 0 Report post Posted December 6, 2008 4A HDB, Master Bedroom and corridor floor renovation: Hacking Works Supply material and labour to hack existing floor finish at Master Bedroom and corridor $400.00 Provide Sand, Haulage services and debris removal fees $300.00 Masonry Works Supply and lay 600 mm x 600 mm homogeneous floor tiles at Master Bedroom. $850.00 Supply and lay 600 mm x 600 mm homogeneous floor tiles at Corridor. $200.00 Total: 1750 OK lei but tiles are based on how many psf? Share this post Link to post Share on other sites