Skip to content
View in the app

A better way to browse. Learn more.

RenoTalk.com ™

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.

Study Rm & 2 Bathrooms

Featured Replies

hi,

I am looking for ID/contractors to do up my study room & 2 toilets. However it seems like either no follow up from them or they will directly reject me saying the project is too small.

Anyone can recommend me an ID/contractor that can do. Or if there's any quotation that you can share?

Thanks alot!

hi,

I am looking for ID/contractors to do up my study room & 2 toilets. However it seems like either no follow up from them or they will directly reject me saying the project is too small.

Anyone can recommend me an ID/contractor that can do. Or if there's any quotation that you can share?

Thanks alot!

Yes...its too small a project and most of them will reject cos they won't be earning much so they prefer not to do....2 toilet ard $7K, study room...depend on what u doing..everything less than $10K...so how much they can earn by spending weeks with your project, less than $3K or even lesser than $2K? To them is worth it or not for the time spend....for those willing to take up the project, u still have to worry why, becos they don't have customer, so small small projects they can't be choosy. In the 1st place why no project....

  • Author
Yes...its too small a project and most of them will reject cos they won't be earning much so they prefer not to do....2 toilet ard $7K, study room...depend on what u doing..everything less than $10K...so how much they can earn by spending weeks with your project, less than $3K or even lesser than $2K? To them is worth it or not for the time spend....for those willing to take up the project, u still have to worry why, becos they don't have customer, so small small projects they can't be choosy. In the 1st place why no project....

Renovating a study rm is about $3K+

2 toilets about $6~$7K.....so its about 10K....though its about 1/3 or 1/2 of the price for renovating the whole hse, they do not have to do the flooring for us...

Hence its less than 1 week job or just 3 days job...

  • Author
Renovating a study rm is about $3K+

2 toilets about $6~$7K.....so its about 10K....though its about 1/3 or 1/2 of the price for renovating the whole hse, they do not have to do the flooring for us...

Hence its less than 1 week job or just 3 days job...

Renovating a study rm is about $3K+

2 toilets about $6~$7K.....so its about 10K....though its about 1/3 or 1/2 of the price for renovating the whole hse, they do not have to do the flooring for us...

Hence its less than 1 week job or just 3 days job...

Hey hazelk,

i think if you're not doing the floor, the total cost might not even come up to 10k. Your refurnishing would be abt 5k. Initially, we wanted to do up our 2 toilets (total revamp, overlaying tiles), change one section of the kitchen cabinet and overlay floor tiles, living room console and study room bookshelves. All these we were quoted from 7k to 10k max from 4 different contractors. I think it's considered mini reno ba, but there are still quite a few takers then. Good luck finding your dream contractor! :)

  • Author
Hey hazelk,

i think if you're not doing the floor, the total cost might not even come up to 10k. Your refurnishing would be abt 5k. Initially, we wanted to do up our 2 toilets (total revamp, overlaying tiles), change one section of the kitchen cabinet and overlay floor tiles, living room console and study room bookshelves. All these we were quoted from 7k to 10k max from 4 different contractors. I think it's considered mini reno ba, but there are still quite a few takers then. Good luck finding your dream contractor! :)

Maybe I shld clarify...the 2 bathrooms are total revamp...

The study room is just the fittings, bookshelves, table,etc...

Maybe I shld clarify...the 2 bathrooms are total revamp...

The study room is just the fittings, bookshelves, table,etc...

here's part of my earlier quotation for your reference... :)

TOILETS Supply and lay wall tiles for both toilets (overlay) $3,200.00

TOILETS Supply and lay floor tiles for both toilets (includes waterproofing) (overlay) $900.00

MASTER TOILET Supply and erect wash basin complete with tile $650.00

TOILET Supply labour to install one toilet bowls $60.00

TOILET Supply labour to install one basin $30.00

ALL Cleaning and Chemical Wash $100.00

Living Room Repair TV Console and fitting bookshelf into the study room $800.00

Living Room Supply and repair false ceiling $450.00

ALL ICI/NIPPON PAINT for all internal wall and ceiling $1,400.00

  • Author

hi...

Thx for yr quotation reference....

:D

Renovating a study rm is about $3K+

2 toilets about $6~$7K.....so its about 10K....though its about 1/3 or 1/2 of the price for renovating the whole hse, they do not have to do the flooring for us...

Hence its less than 1 week job or just 3 days job...

Apply permit and wait for approval...3~5days( during this times, they go buy the material). Selecting of tiles, bring u go buy took 1/2~ days. Hacking and disposal of the debris for 2 toilets took another 3days. Waterproofing, tiling....etc...took another 2~3days. Installing of toilet assy. took 1 days..sat work 1/2day, sun & PH not working. Carpentry measurement took 1 day, wait 2-3 week before they come to install...another 2 days. So its never a 3-1week job. Not counting the days they got to spend with u on the design...etc. :yamseng:

  • Author
Apply permit and wait for approval...3~5days( during this times, they go buy the material). Selecting of tiles, bring u go buy took 1/2~ days. Hacking and disposal of the debris for 2 toilets took another 3days. Waterproofing, tiling....etc...took another 2~3days. Installing of toilet assy. took 1 days..sat work 1/2day, sun & PH not working. Carpentry measurement took 1 day, wait 2-3 week before they come to install...another 2 days. So its never a 3-1week job. Not counting the days they got to spend with u on the design...etc. :yamseng:

I got a quotation fr 1 ID....

1 toilet cost abt $5K+

N my study rm is $3K+ near $4K....

Create an account or sign in to comment

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.