December 9, 201015 yr Finally, after 4 years of marriage..!! Bought this place at val: $289k + very very low COV Condition: SUPER original and requires a lot of reno 1st appt: 9 Dec 2010 2nd appt: 13 Jan 2010 Start of reno: 6 Jan 2010 We start earlier with the permission from the owner to rush reno for CNY! While contractor takes measurement... we take picture!
December 9, 201015 yr welcome fellow 3roomer......wow, the aluminum toilet doors!!! very retro!!! tink ur two toilets combined together will be very spacious.... but i tink rushing reno to complete by CNY (3Feb2011) maybe a bit tight....
December 9, 201015 yr Author Renovator: Home Sweet Home - Lina 9329 9934 Comments: Up till now, i find her quotes reasonable and shes quite honest. Can do cannot do, she is upfront to me. No empty promises. Like what other members here say, she is very hardworking.. 3am still emailing quotes. Response fast and give logical advices. Flooring: Good Hill Ent www.goodhill.com Overlaying Vinyl Wooden Planks for LR and 2 Bedrooms Reasonable price. Lighter tone for LR What we plan to do.... Kitchen 1. Hack all kitchen cabinets 2. Remove the common toilet basin and fix it inside the toilet instead 3. 10ft top and bottom cabinet with solid surface 4. Overlay floor tiling 5. No wall tiles for kitchen 6. Sliding door for kitchen Toilets 1. Hack all floor and wall tilings 2. Lay all floor and wall tilings 3. Bi Fold door all both toilets 4. Redo pipings 5. Shower screen for MBR toilet 6. Vanity top for MBR toilet MBR 1. Wardrobe 2. Cabinet under window Living room is very simple, jus a TV featured wall Doors all change Paint whole house Re wiring whole house system 2 a/c Expected damage: $25k
December 9, 201015 yr Author welcome fellow 3roomer......wow, the aluminum toilet doors!!! very retro!!! tink ur two toilets combined together will be very spacious.... but i tink rushing reno to complete by CNY (3Feb2011) maybe a bit tight.... Hihi!!! Its all in its ORIGINAL state.. hahaha.. Hmm.. shud be able to la.. all contractors have to be cooperative lor... We target hand over by 27 Jan cause normally all works will end 1 week before CNY... Tay boon tat ending their year's work on 15th Jan. My main con is flexi Electrician also flexi so.... cross fingers... shud be ok cause they say... zodiac rabbit next year cannot move house ma.. so have to rush before CNY
December 9, 201015 yr Hihi!!! Its all in its ORIGINAL state.. hahaha.. Hmm.. shud be able to la.. all contractors have to be cooperative lor... We target hand over by 27 Jan cause normally all works will end 1 week before CNY... .. cause they say... zodiac rabbit next year cannot move house ma.. so have to rush before CNY Welcome to renotalk, Looks like plenty of room for transformation ;P (funny that your floorplan's all those thick bold lines, can these walls be hacked?) yea, 20 days' a tight squeeze for hacking works inclusive. Nevertheless, wishing you a smooth reno journey.
December 9, 201015 yr Author Welcome to renotalk, Looks like plenty of room for transformation ;P (funny that your floorplan's all those thick bold lines, can these walls be hacked?) yea, 20 days' a tight squeeze for hacking works inclusive. Nevertheless, wishing you a smooth reno journey. actually we wanna keep it simple cause our baby is going to learn to crawl... so less is best... plus.. tight budget.. so jus do whatever that needs to be done first.. the rest can wait a bit rush but bo pian... hopefully can get it done lor...
December 10, 201015 yr Author Yawns.. Waiting everyday for 6th to come is so painful... haha this weekend, we will go see dates to move in! next week need to go choose tiles, get the windows selection settled, see lights... and go geylang see altar table.. also also... go yon tat see door... cause TBT say their fire rated door is 1.2k... a bit ex... but i called yon tat, they quoted lesser... shall see how... Next week will be a better and FASTER week!
December 10, 201015 yr Yawns.. Waiting everyday for 6th to come is so painful... haha this weekend, we will go see dates to move in! next week need to go choose tiles, get the windows selection settled, see lights... and go geylang see altar table.. also also... go yon tat see door... cause TBT say their fire rated door is 1.2k... a bit ex... but i called yon tat, they quoted lesser... shall see how... Next week will be a better and FASTER week! I got this quote from this vendor not sure why their place cheaper than other places that I have asked (1000plus). Anyone buy from them before? Go their contact when google from Internet. the HDB main entrance door for single panel ----0.5hr fire-rated timber door,supply and install is $750.00/1nos,unequal double leaf is $1050.00/1nos. $600 if only supply only.. Best rgds, Miss.Yang BAO LEE DOORS
December 10, 201015 yr Author I got this quote from this vendor not sure why their place cheaper than other places that I have asked (1000plus). Anyone buy from them before? Go their contact when google from Internet. the HDB main entrance door for single panel ----0.5hr fire-rated timber door,supply and install is $750.00/1nos,unequal double leaf is $1050.00/1nos. $600 if only supply only.. Best rgds, Miss.Yang BAO LEE DOORS ooo thats quite cheap... TBT quoted me $1.2k
December 17, 201015 yr Wife is down with flu and cough Anyway, we got our tiles selected!!! MBR and Common Toilet Kitchen Floor vs Living Room Flooring Grey and Red are the borders
December 17, 201015 yr wow ur house is really original, can do by cny? I'm also hoping to handover before cny, but mine is new flat lah, so not so much reno involved... hehe... hope ur reno goes well!
December 17, 201015 yr wow ur house is really original, can do by cny? I'm also hoping to handover before cny, but mine is new flat lah, so not so much reno involved... hehe... hope ur reno goes well! hahaha.. ya.. my contractor say can wor... but good news is.. the owner allow us to reno first so maybe we can start reno end dec... new flat easier.. my hacking is gonna take 3 days already.. then plastering and stuff.. one week.. then overlay is 2 hours for the wooden planks window and doors 1 day painting i think 1-2 days ba...
December 17, 201015 yr hahaha.. ya.. my contractor say can wor... but good news is.. the owner allow us to reno first so maybe we can start reno end dec... new flat easier.. my hacking is gonna take 3 days already.. then plastering and stuff.. one week.. then overlay is 2 hours for the wooden planks window and doors 1 day painting i think 1-2 days ba... wah... ur contractor v fast... mine a bit slow leh... 3rd wk of reno and still doing plastering only... i guess applying the permit for hacking was slowing everything down... sien. at first i thought they'd be done with the tiling by now... got to chase them to move quickly! and ur ex-owner very nice man, can let u guys start first...
Create an account or sign in to comment