October 3, 201214 yr Hi guys, I have been a silent reader and so now its time for me to share my house setup journey with all of you.I got a 5I in Woodlands, this was the 6th house hubby and myself had viewed and we closed the deal on the day itself. Hubby thought it may be a impulsive decision (that's my character) but I felt it a good buy. We are praying hard it can be our matrimonial house.Option Signed: 24 June 2012First Appt: 7 Sept 2012 (Submission was delayed due to personal reason)Second Appt: 25 Oct 2012 (as my seller was doing contra, that explain the long wait) Edited October 3, 201214 yr by Dreamer10
October 3, 201214 yr Author Welcome and hope to see more pix of your Reno...meantime, happy ID hunting. Well, actually we had already chosen our ID (wont be reviewing the ID till the start of my reno). And my friend was "scolding" me for being EXCITED, to buy almost all items for the new house even before first appt.Indeed, I am excited to go thru this journey. So my update here will be slightly back-logged, hope all reader wont mind......
October 3, 201214 yr Hi, I also just bought a resale HDB and my seller is also a contra seller. The seller is scheduled to hand me the key on Dec 10 (2nd HDB appt). From what I understand, the seller will only collect the keys of their new house on the same day!How does this work?
October 4, 201214 yr Author Hi, I also just bought a resale HDB and my seller is also a contra seller. The seller is scheduled to hand me the key on Dec 10 (2nd HDB appt). From what I understand, the seller will only collect the keys of their new house on the same day!How does this work?Did he requested for extension stay or maybe he do has a place to stay?For my case, my seller's seller is waiting for new flat, and so my seller is doing contra and my seller asked for 30 days extension stay (private arrangement)so for your case, dont worry about your seller if there's no arrangement, and wait for your keys in Dec (but why in Dec - so long from now)
October 4, 201214 yr Author The present house stateLiving RoomLiving RoomMaster RoomMaster BathKitchen (Common Bath was hidden behind the doors) Edited October 4, 201214 yr by Dreamer10
October 4, 201214 yr Condition of the house looks good.Better to check the house and bathrooms for molds and water leakage on the ceiling and walls. Better to ask the owner to fix it or other arrangement or else you will end up spending a lot of time going back and forth trying to get this resolve with the upstairs neighhbours etc..My 2 cents of knowledge. Hope it helps.
October 4, 201214 yr Author Better to check the house and bathrooms for molds and water leakage on the ceiling and walls. Better to ask the owner to fix it or other arrangement or else you will end up spending a lot of time going back and forth trying to get this resolve with the upstairs neighhbours etc..My 2 cents of knowledge. Hope it helps.Thanks for the advice, and we are doing the following:- Redo the whole Kitchen (removal of all kitchen cabinets)- Redo both common/master bathroom floor & wall tiles with new shower screens- Redo living room's false ceiling to 1-sided L-box with down-lights- Removal of master platform and wardrobe- Installation of full HT shoe 3.5ft cabinet
October 4, 201214 yr Thanks for the advice, and we are doing the following:- Redo the whole Kitchen (removal of all kitchen cabinets)- Redo both common/master bathroom floor & wall tiles with new shower screens- Redo living room's false ceiling to 1-sided L-box with down-lights- Removal of master platform and wardrobe- Installation of full HT shoe 3.5ft cabinetEnjoy your journey
October 10, 201214 yr Author My initial 3D drawingShoe Cabinet near the main entranceKitchenMaster RoomStill waiting for my ID to revert changes to the kitchen Edited December 5, 201213 yr by Dreamer10
October 10, 201214 yr Author More back logged photos to updateItems that we had bought whenever we go see see look look.... L-Shaped Sofa (we customized the colour to full dark grey, without that 2 yellow cushion for sure )King Size bed frame Only LG F-1422TD Washing MachineWithout picture- Mitsubishi Starmex Inverter System 3 (still considering to change to Sys 4)- Sealy Posturepedic Mattress MayFair- Turbo Incanto Built-n glass hob- Turbo chimney Hood- Turbo Incanto Built-in oven- Blanco Axia Kitchen SinkThere are so many many items on pending...... Edited October 10, 201214 yr by Dreamer10
October 10, 201214 yr Your house looked big, especially the 3D design ... Guess u like white color, looking forward to see your Reno progress ~ I also getting a 5i n going for 2nd appt this month .. Excited to see the reno start ☆〜(ゝ。∂)
October 10, 201214 yr Author My 2nd appt is on 25 Oct, but how I wish we could get the keys on that day....Your house looked big, especially the 3D design ... Guess u like white color, looking forward to see your Reno progress ~ I also getting a 5i n going for 2nd appt this month .. Excited to see the reno start ☆〜(ゝ。∂)
Create an account or sign in to comment