Our First Home, Mixed Ideas, Mixed Concept

Featured Replies

Hi guys,

Me and my wife finally got a good queue number for our BTO application after 11 tries, thus after a long week of approximately 3 years and 4 months, we finally got our keys in May 2015

As usual, the standard HDB 4-room floorplan...

floorplan_zpsie6lhxn8.jpg

As we have a limited budget, thus we will be making use of the following (in no particular order) for most of our purchases

  • Our friendly neighbour, Malaysia for most of our wall switches, sockets, ceiling fans, storage heater, some lightings
  • Amazon.com
  • Taobao.com

Before key collection, we have sourced out a total of 3 options for our renovation needs, 2 IDs and 1 contractor, eventually choose the contractor, even though there will be no 3D drawings as he is able to explain the various pros and cons in the items that we wish to have and provide solutions and suggestions to many things based on one thing: PRACTICALITY

Edited by danie1teo

  • Author

Scope of works included

DEMOLITION & DISMANTLING & DISPOSAL WORKS

  • To dismantle & dispose, 2 x basin for main bathroom
  • To hack & dispose, 1 x wall in between kitchen & living room

WET WORKS

  • To construct cement fridge, washing machine, & kitchen cabinet based with tile finishing at exposed area.
  • To construct cement shower kerb with tile finishing at exposed area for main bathroom.
  • To make good of wall, floor & ceiling after hacking of wall in between kitchen & living room.
  • To supply labour to install craft stone for living room. (est. 14ft by 8.5ft)

CARPENTRY WORKS

A) Kitchen

  • To supply & construct solid plywood top (20ft), bottom (16ft) plus suspended table (4ft) kitchen cabinet with soft closing handle-less casement door, laminate finishing (Up to 2 selected laminate choices), wooden strip for door, internal white PVC & ABS trimming. Kitchen cabinet consist of 1 set of drawer (small, medium & large), 1set of 2 tier stainless steel dish rack, & 1 x sandblasted glass with aluminium frame top hang door.

B) Living Room

  • To supply & construct (3ft) full height solid plywood shoe cabinet with soft closing casement door, laminate finishing (Up to 2 selected laminate choices), & internal white PVC for living room.

C) Main Bedroom

  • To supply & construct full height wardrobe (6ft) consists of partition wall, internal white PVC pole system, & white aluminum frame with frosted glass sliding door.

D) Bedroom 2

  • To supply & construct (5ft) full height solid plywood aluminum frame sliding door wardrobe with glass/laminate finishing & internal white PVC for main bedroom consist of 3 x drawer with lock & 1 x sliding mirror.

E) Main Bathroom

  • To supply & construct solid plywood casement door vanity low cabinet with laminate finishing & internal white PVC for main bathroom (2ft).

F) Common Bathroom

  • To supply & construct solid plywood casement door vanity low cabinet with laminate finishing & internal white PVC for Common bathroom (3ft).

GENERAL WORKS

  • To supply & install, Kompactop table top for kitchen bottom cabinet (20ft).
  • To provide general floor cleaning after renovation.
  • To provide ICI/Nippon emulsion painting for whole house (up to 6 color for wall & white for ceiling), & piping.
  • To supply & install, 1 set of tempered glass fixed panel & sliding door shower screen for bath/W.C 1, 1 set of tempered glass spray paint backing in between top & bottom kitchen cabinet
  • To supply & install 1 x system 4 1 x 18K BTU & 3 x 9K BTU fancoil unit (Mitsubishi Electric Inverter).
  • To supply & install, Solid surface top for vanity low cabinet at main bedroom. (2ft), Solid surface top for vanity low cabinet at common bathroom. (3ft)

PLUMBING WORKS

  • To supply labour to install of 2 set of toilet accessories. (Material supply by owner)
  • To supply labour to install 1 x basin with hot & cold water taps including connection of water outlet & inlet piping for main bathroom. (Material supply by owner)
  • To supply labour to install 1 x kitchen sink with cold water taps including connection of water inlet & outlet piping for kitchen. (Material supply by owner)
  • To supply labour to install 1 x storage heater connecting to existing HDB provided piping. (Material supply by owner)
ELECTRICAL WORKS
  • To provide labour to install Cooker hob. (Materials supply by owner)
  • To supply & install, 8 x New light point, 2 x Relocation light point, 4 x 2 gang switch, 1 x Heater switch for cooker hood
  • To supply labour to install, 6 x ceiling light fitting, 4 x ceiling fan, 12 x 1.5m track light with 2 x light fitting each
  • 1 x hanging light fitting
  • To supply and install conduit piping for new light point, switch point & power point for whole house

Edited by danie1teo

  • Author

Some photos of the items that we purchased from taobao, malaysia and amazon as well as some of the progress photos

Taobao

20150530_142150_zpsyxfpuzlp.jpg

Taobao

20150530_142146_zpseof5qeeh.jpg

Misc items

20150525_135521_zpskwa9sxah.jpg

Craftbricks from Malaysia

20150523_185528_zps8irwrwfs.jpg

Hacked half the walk at kitchen area to create "space"

20150609_194950_zpsruxmzwfl.jpg

Edited by danie1teo

  • Author
Frame for partition wall for pole concept wardrobe

20150612_101910_zps6f3llve3.jpg


Partition wall for pole concept wardrobe (with the worker's sexy back)

20150612_104721_zpsjfheprjj.jpg


Partition wall for pole concept wardrobe

20150612_194721_zpspiqaeb3u.jpg


Sealing up of vent of bomb shelter@living room

20150612_102354_zpsmffamifp.jpg


Shower Kerb in master bathroom up!

20150612_194728_zpsahoouuli.jpg

Edited by danie1teo

  • Author

Tracks in progress


20150617_195924_zps6kcssfcs.jpg



20150617_195940_zpsyuu9zco4.jpg



Service Yard Lights


20150618_154011_zpsx0cr7y5n.jpg



Box up aircon piping


20150619_210305_zpsc9sconar.jpg



Craftbricks in progress


20150619_210225_zpsvhkaqnda.jpg


Edited by danie1teo

  • Author

Bricks 100% done, left filling up the gaps


20150623_192236_zpsxtlwzno9.jpg


Edited by danie1teo

  • Author

Master room pole concept wardrobe


20150701_191635_zpsxnh6mzsz.jpg



Master room bathroom cabinet


20150701_191644_zpsj4vei7kh.jpg



Common room wardrobe with sliding mirror


20150701_191732_zpshkrobzzh.jpg



Common bathroom cabinet


20150701_191808_zpsoupjevuc.jpg



Full height shoe cabinet cum partition


20150701_191834_zpsdpvplils.jpg

Edited by danie1teo

  • Author

Kitchen cabinets


20150701_191843_zps9ky1qptg.jpg



Mini table!


20150701_191847_zpstzpjejok.jpg


Edited by danie1teo

  • Author

Completion photos updated soon

Edited by danie1teo

u don't plan to sell this flat rite? Cause i don't think concealing of electrical cables like this is allowed...

Technical Terms and Conditions

1. All wiring installation work must be executed by an EMA licensed electrical worker
2. Embedding of wiring house in metal/high impact PVC conduit in RC slab, beam, column, wall and in wall plaster or other finishes is not allowed

Edited by lonerboi

  • Author

u don't plan to sell this flat rite? Cause i don't think concealing of electrical cables like this is allowed...

Technical Terms and Conditions

1. All wiring installation work must be executed by an EMA licensed electrical worker

2. Embedding of wiring house in metal/high impact PVC conduit in RC slab, beam, column, wall and in wall plaster or other finishes is not allowed

thanks for the info, i will check with my contractor

Create an account or sign in to comment

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.