Everything posted by JCase
-
Colours Design
They work with a company called Rowell or something that is licensed HDB hacker. No an issue imo.
- We Bought A Flat, And Made It Our Home
-
Ely'S Rt-Gathering
Looks like we're moving on the same day. Sigh the unpacking ......
-
Our 1st Place
Nice 3D. Really like the cooker you guys bought. Looks like too late for me to cancel my hob order from Teka. Also the CO will kill me as our kitchen friggin tiny so the cooker will take up too much space that can be used for storage
-
Abobe By The Longkang / River
Not long. I will be at the unit from 2.30pm today if you would like to pop around. Meeting Marcus for our weekly walk around the unit and then a little later at around 3pm or so, Andrew my window installer will come by to update me on what's to be done next. Windows have been installed and w/ship is quite good. Some minor tweaking required. Grills will be next. The place is in a mess. Painting starts on Monday and then from Thurs onwards installation of carpentry. Some carpentry has been delivered. The work is quite fast.No major complaints yet. Lights will be installed on 6 June.
-
Abobe By The Longkang / River
Bro, that's asking him too much. I don't think he can stand upright, look straight down and see his toes.
-
Extreme Makeover @ Pandan Gardens
A sales person told me that inductionand gas cooking about the same. Only it takes a little longer for induction to heat up. Also the running cost for electricity for induction is very high. Don't shoot the messenger.
-
Abobe By The Longkang / River
As usual the condo mgr call to whine about something while I'm at work. Garbage in / garbage out. Need to pop over later to check onthe windows.From what I saw yeaterday pretty good so far.
- Home Away From Home
-
Abobe By The Longkang / River
My handover allegedly on 21 June, so a 6+ weeks process. From what I can seein the dim light at night: 1. Wet works completed 2. Major electrical completed 3. Major ceiling works completed 4. Major aircon truncking etc completed 5. New windows installed Next week from Mon to Wed painting will beging. Following which the next 2 weeks will be installation of carpentry, showers screens etc. Now need to check on aupicious time for symbolic and actual move in date.
-
The Best Journey Always Leads Us Home
Ely, wow,lots of drama with your reno. Hope it gets better soon. Imo you need to be more assertive. My ID and his team don't dare try to delay the project or come up with any carp excuses for poor execution. They know I will gouge their eyeballs out. They also know that what they utimately deliver is a reflection on the quality that their company's brand and reputation. My ID does not allow eating, smoking or drinking in the unit. I am however a little more flexible. I will allow it until the painting stage. Don't serve them mate. I just buy cartons of mineral water and leave out for them. Hang in there.
-
Ely'S Rt-Gathering
I like the arvo timing. Have to get back to you once I know when my reno HO is. Hopefully on week of 25 June, so 1 or 2 July will be ok for me.
-
Boxing Up Toilet Pipes In Hdb
Did this for my place before. Just boxing up and painting. I am not sure if the adhesive will hold the tile to the gypsum board / plywood in the long term.
-
May Our Dream Home Come True
Grats and consider yourself lucky. To get a balance unit these days is like striking 4D. I was in some position 7 years ago and am still very grateful. After your MOP, it is fairly certain than your flat will almost double in value. Good luck with the reno.
-
The Best Journey Always Leads Us Home
Super. I normally bring alcohol of some sort. Let me know your poison. I really hope to make it but am not sure if we are actually shifting into our new place that weekend. If we are I'll find a way to sneak off
-
A New Lair In The West
Nice sofa. Looks like you work at Suntec. Lucky. I used to work at Suntec,such joy being there. Now I'm in the deep recceses of the West Good luck to both of you for the reno.
-
Abobe By The Longkang / River
I wlll tekan the fella again soon. This tile is normal homo tile with faux woody look. Only for family room. Living and dining is cream 60 x 60.
-
Abobe By The Longkang / River
Partial view of living room - hacked Common toilet hacked and plubling works being done Tiling for Family room done- mostly Kitchen tiles The fmaily room and kitchen tiles taken using only a led torch light as only light source. will retake again over the weekend under natural light.
-
Abobe By The Longkang / River
Bro this fella is your typical bureaucrat paper pusher. He deserved the blasting. I was in meeting this morning with my boss and CEO and ID calls me to says that electrician barred from condo. wtf?
-
Abobe By The Longkang / River
I would love to update but by the time I get to the unit each nite to check I have to do so using a torch light. I think most of the tiling should be done so I'll take pics and post over the weekend. Luckily for us not much action happens in the kitchen on weekdays so touch wood floor and stuff should be relatively clean.
-
A Meeting Of East And West In Tampines.
Oh wow, congrats mate. And still on-line and posting.
- We Bought A Flat, And Made It Our Home
-
Third In Three Years
Please consider Besglas. It's far classier and the doors are made of glass so it's nice and heavy.
-
Our Dream Home - Seletar Springs
To be fair to Angeline and to Intradesign, her quote was definately not 10K more ex than other quotes. This is just a misconception. I did not use her in the end as we were more comfortable dealing with my current ID purely on a communication basis but the point is her pricing overall is fair. Nice office they have as well.
-
Edelweiss
You can go MCST office and purchase.