Everything posted by jaskel
-
Pixiepixel's Pixilated Home
Ard 6-8weeks, if HDB approve fast fast for the hacked wall then better still, normally took 1 week for them to approve for walls. So when will be your 2nd appt.?
-
Pixiepixel's Pixilated Home
What you intend to do for your new unit?
-
Pixiepixel's Pixilated Home
Tot u looked for edmund already? Happy birthday to u too.
-
Pixiepixel's Pixilated Home
Welcome Welcome...
-
Post Form Top
jaskel replied to ningyusof's topic in Renovation Contractors, Interior Designers & Suppliers ReviewsIKEA
-
Reno @my Simei 4a Resale Flat
Isn't your inspection on the 20th??? I'm ok with the inspection date. Let me know the timing for that day.
-
Our Love Nest In Simei
As discussed with owner, I will not put in the final design of their carpentry works till completion.
-
Wrought Iron Gate
How bout doing a wrought iron gate no. plate?
-
Our Love Nest In Simei
Had just sent u the design of the feature wall and TV console.
-
Our Love Nest In Simei
Use electrical cutter to cut it off then patch up...that why got burn marks.
-
Our Love Nest In Simei
Sorry about that. Already scolded Keith and Alex for overlook on this matter. Had just sent u the design for wardrobe, ask your hubby to see also.
-
Our Love Nest In Simei
Window grille for bedroom 3 Living room
-
Our Love Nest In Simei
Plumbling works in progress for common bath. Master bath
-
Our Love Nest In Simei
Sandblasted glass sliding door for master bath.
-
Our Love Nest In Simei
Will take note of that.
-
Our Ea In Bishan
Due to wastage. Yours is doing vertical and he's is doing horizontal and on his half height walls of his balcony.
-
Our Ea In Bishan
Thks Dr., gives me some times, now doing experiment on the cove lighting for your wife and also solving the inserts issues.
-
Our Ea In Bishan
He now change his mind cos the decking he do is 2 times expensive than yours and the area is 2 times less than yours. Now changing it to chengal wood decking. But manage to get a sample from the director.
-
Our Love Nest In Simei
Yes, need to. If not u don't like it and done already then big big problems liao.
-
Our Love Nest In Simei
Window grilles and window different group of installers. If we are not there to coordinate, it will be install blindly. So our present is very important. And that is what we are for. Don't install wrong things to owner than ask them to accept it. And yes, I knew what I'm owning u.
-
Should I Get Separate Contractor To Do Renovation?
Even have time, must also know how to coordinate all the works.
-
Reference Check: Gek Jin Contractors Pte Ltd
I think he looking for package that give free air-con, lighting, etc...those u can see in every sat ST classified section for renovation.
-
Reno @my Simei 4a Resale Flat
To other forumers, pls do not send me any more PM asking for quotation as I already full of projects till end of sept. I'll not be taking anymore projects till after that. Regardless u r rich or poor, doing more or less, to me all are equal, its 1st come, 1st serve. To ID/contractor, dont bother to pose as hse owner to ask me for a quote just to keep me busy. Cos if I do found out.....heeheehee. To my friends, pls do not set up a club for me. I prefer to keep as low profile as possible. Thks. I'm still prefer to advise in this forum rather than advertise or sell my service. I want to use more time to concentrate on doing my current and future confirmed projects than neglected them. I have my own principal of view towards business, if you are good, words of mouth will help you spread ard, if you are bad so will ppl spread for u. I been here for so long, and so is being in the trade. There reasons for me able to survive without doing forumers job.
-
Our Love Nest In Simei
To other forumers, pls do not send me any more PM asking for quotation as I already full of projects till end of sept. I'll not be taking anymore projects till after that. Regardless u r rich or poor, doing more or less, to me all are equal, its 1st come, 1st serve. To ID/contractor, dont bother to pose as hse owner to ask me for a quote just to keep me busy. Cos if I do found out.....heeheehee. To my friends, pls do not set up a club for me. I prefer to keep as low profile as possible. Thks. I'm still prefer to advise in this forum rather than advertise or sell my service. I want to use more time to concentrate on doing my current and future confirmed projects than neglected them. I have my own principal of view towards business, if you are good, words of mouth will help you spread ard, if you are bad so will ppl spread for u. I been here for so long, and so is being in the trade. There reasons for me able to survive without doing forumers job.
-
Our Love Nest In Simei
This few days there will be no works done. Next week will up your air-con, still waiting for the time slot. Measurement of carpentry work and also installation of your vinyl flooring on monday. Tomorrow will complete your floor tiling work, and also continue of your plumbling works. Today the window grille came to install but they do took the wrong design so ask them bring back. Your master bath sliding glass door had installed. So your see, after monday, is all waiting for the carpentry work to be up. But during the waiting time, painter will come in to paint your whole hse. And the last part will be the installation of the carpentry work....then I HO to u. Next week you will see me running your site again. This few weeks, Alex and Keith are at your site doing the coordination and monitor the progress.