Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

rajini

Members
  • Content Count

    13
  • Joined

  • Last visited

Community Reputation

0 Neutral

About rajini

  • Rank
    Bronze Member

Previous Fields

  • Gender
    Male
  1. [am looking for an air con system for my 3 bedrooms. not looking for any high end ones, as we only use it occassionally in our master bedroom and the two other rooms are for rental. any recommendations and costs? any promo packages? looking to install next week, if possible. thanks
  2. I was there yesterday as well, about 8pm The first shop i totally ignored as the prices were higher and the sales girl did not seem to have knowledge of the starmex. I popped by to GC and after a while, the guy recommended that the best energy saver was not the Mitsubishi starmex but the hitachi model. I got a bit confused as well. Ended up didnt feel like buying and left.
  3. Can u PM me the shop details? Thank you.
  4. Can u PM me the contact..? Thanks
  5. Can u PM me the contact as well? Thanks.
  6. Hi, with regards to ur quote.. How is your contractor service? And was it within your budget and how much did u spend in total? Am doing something similar and looking for a good contractor URGENTLY. Thank you.
  7. Have you found anyone yet? me on tight budget as well.. Anyone recommendations?
  8. Hi there, i am looking to install air con in just my 3 rooms (mine is a 4A flat in bishan). Nothing too fanciful, looking for a good brand. Any recommendations, with pricings as well? Thanks.
  9. rajini

    Doors

    i am looking for a fire retardant door but was told that it would cost at least 1k. is this the the standard price?
  10. S/N DESCRIPTION AMOUNT($) Kitchen & 2 Toilets:- 1 Supply hack and lay kitchen floor tiles c/w water proofing. $1,300.00 2 Supply and lay kitchen wall tiles up to ceiling height. ( expose area only ) $3,000.00 3 Supply and construct L-shape cabinet, fridge and washing machine base. $350.00 4 Supply and install L-shape top/bottom kitchen cabinet of 22ft. $3,850.00 5 Supply and install L-shape solid surface kitchen work-top of 22ft. $1,650.00 6 Supply and over-lay bath 2 floor tiles. $500.00 7 Supply and over-lay bath 2 wall tiles up to ceiling height. $1,300.00 8 Supply and construct hollow block lintol for bath 2 c/w tiles finishing. $200.00 9 Supply and re-located new entrance for bath 1. $200.00 10 Supply and seal-up existing door entrance using 63mm hollow block at bath 1. $250.00 11 Supply hack and lay bath 1 floor tiles c/w water proofing. $800.00 12 Supply and over-lay bath 1 wall tiles up to ceiling height. $1,300.00 13 Supply and install tempered glass shower screen at bath 1. $338.00 14 Supply and install aliminium bi-fold door at bath 1 and bath 2. $360.00 15 Supply and re-run whole house stainless steel pipe. $550.00 16 Supply and re-run sink, wash basin and washing machine inlet/outlet pipe. $180.00 17 Provide labour to install toilet bowl, wash basin heater and toilet accessories. $350.00 18 Supply and install stainless steel bin chute. $168.00 Miscellaneous Works:- 1 Supply hack and lay 600mm x 600mm homogeneous fllor tiles c/w skirting ****, 3 bedroom and store room. $6,200.00 7 Supply and construct false ceiling **** room. $360.00 8 Supply and construct 2 sets L-box **** and dining room. $910.00 9 Supply and plaster whole house wall and ceiling. $1,500.00 10 Supply and paint whole house wall/ceiling, bedroom doors/frames and all expose pipe. $1,050.00 11 Supply and do chemical washing after renovation works. $250.00 Electrical Works (Total rewiring) $2k+ I hope that people here in this forum can give me some much-needed advice on whether this is a reasonable quote, cos my gut feeling says other wise. Appreciate all comments.
  11. Hi guys.. I am a newbie here. Need some advice from the more experienced friends here. Below is the quotation for my 4rm flat reno. Am doing quite a few things as its an old flat. But am still wondering whether the prices are a bit too much.. Please advice. And thanks for your time. S/N DESCRIPTION AMOUNT($) Kitchen & 2 Toilets:- 1 Supply hack and lay kitchen floor tiles c/w water proofing. $ 1,300.00 2 Supply and lay kitchen wall tiles up to ceiling height. ( expose area only ) $ 3,000.00 3 Supply and construct L-shape cabinet, fridge and washing machine base. $ 350.00 4 Supply and install L-shape top/bottom kitchen cabinet of 22ft. $ 3,850.00 5 Supply and install L-shape solid surface kitchen work-top of 22ft. $ 1,650.00 6 Supply and over-lay bath 2 floor tiles. $ 500.00 7 Supply and over-lay bath 2 wall tiles up to ceiling height. $ 1,300.00 8 Supply and construct hollow block lintol for bath 2 c/w tiles finishing $ 200.00 9 Supply and re-located new entrance for bath 1. $ 200.00 10 Supply and seal-up existing door entrance using 63mm hollow block at bath 1.$ 250.00 11 Supply hack and lay bath 1 floor tiles c/w water proofing. $ 800.00 12 Supply and over-lay bath 1 wall tiles up to ceiling height. $ 1,300.00 13 Supply and install tempered glass shower screen at bath 1. $ 338.00 14 Supply and install aluminium bi-fold door at bath 1 and bath 2. $ 360.00 15 Supply and re-run whole house stainless steel pipe. $ 550.00 16 Supply and re-run sink, wash basin and washing machine inlet/outlet pipe. $ 180.00 17 Provide labour to install toilet bowl, wash basin heater and toilet accessories. $ 350.00 18 Supply and install stainless steel bin chute. $ 168.00 Miscellaneous Works:- 1 Supply hack and lay 600mm x 600mm homogeneous fllor tiles c/w skirting ****, 3 bedroom and store room. $ 6,200.00 2 Supply and construct L-shape wall using 63mm hollow block at prayer room of 8ft. $ 750.00 3 Provide labour to make good with cement plaster at L-shape wall. $ 400.00 4 Supply and lay 1 side wall tiles for prayer room. $ 700.00 5 Supply and construct support for prayer altar. $ 400.00 6 Supply and box-up 3 nos door top. $ 120.00 7 Supply and construct false ceiling **** room. $ 360.00 8 Supply and construct 2 sets L-box **** and dining room $ 910.00 9 Supply and plaster whole house wall and ceiling. $ 1,500.00 10 Supply and paint whole hosuse wall/ceiling, bedroom doors/frames and all expose pipe. $ 1,050.00 11 Supply and do chemical wshing after renovation works. $ 250.00 Electrical Works:- 1 Install light 20 x $ 8.00 $ 160.00 2 Lighting point 20 x $ 28.00 $ 560.00 3 13A double point 12 x $ 55.00 $ 660.00 4 15A heater point 2 x $ 80.00 $ 160.00 5 15A air-con point 1 x $ 80.00 $ 80.00 6 Tel point 2 x $ 60.00 $ 120.00 7 SCV point 2 x $ 80.00 $ 160.00 8 Earth point 1 x $ 80.00 $ 80.00 9 DB box 1 x $ 350.00 $ 350.00
×