Skip to content
View in the app

A better way to browse. Learn more.

RenoTalk.com ™

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.

arowana

Members
  • Joined

  • Last visited

  1. hahaha. you pay 45k means over liao. If you don't control the payments, you will always be at the mercy of the contractors.
  2. Lmarianne58 started following arowana
  3. kitchen counter tops always best to go for natural stones. Can take hot pots and will not discolor over time.
  4. My tiles are always Made in China tiles so far. But for my next house. I'm planning to go for non-homo tiles like marble or granite etc. If you are willing to spend more on tiles, might be worth going for better material ones. If you still think it's better to stick to homo tiles for convenience of cleaning, then i would also suggest get the best quality made in china tiles.
  5. Dear all, I wanted to ask for more feedback on design and build contractors who specialized in landed property. This is not about general contractors. Just in case some people are not sure, here are some notes about D&B contractors - Only contract with 1 company to do the whole package of A&A/recon/rebuild for you from consultation, design, construction etc. - They usually also work with limited number of templates for the house - Cost is cheaper than doing the other route which is having separate contracts with the Architect, general contractor, PE, QS etc - Time from start to finish is also faster - Still does offer some level of customization within the templates. - Biggest cons are limited designs and no truly competitive tender system I have looked through this website and searched online. I so far can find only 2 names. The rest do not have design and build construction for landed housing as their main business hence i didn't mention them. - Meridian Homes - Nic& Wes Builders Appreciate any other names and feedback and experience if possible. Would appreciate if i can get response only from actual home owners and not marketeers of the company so as to keep the discussion authentic. Thx
  6. I learnt that plot ratio doesn't matter for landed housing. Only floor height n overall restriction on number of floors matter. And of course the min setbacks for the front, back n side.
  7. Just get the manual version. For automatic, the sensor can become insensitive after awhile
  8. Dear all, Not sure if you all notice this also. I see many property listings where the plot ratio rule is not adhered to. Granted i'm not sure exactly of the official plot ratios of all the listings on URA website but assuming we use a base ratio of 1.4. Most listings have overshot this number by quite abit in terms of their GFA built up. So is their current house illegally reconstructed/rebuilt? Or am i missing something here? Is the plot ratio a strict rule which BCA will check and follow? Am refering for regular landed housing, not strata titled landed. Thx,
  9. Dear Friends, Need your feedback in terms of what is the average and advisable % of combined income used to service home loan. We are planning our next home purchase of a pte property. We are intending to pay up our existing HDB loan first before buying a pte property and are working out the numbers based on how much monthly cash we should top up to service the home loan. Assuming we have max CPF OA monthly contribution of $1150 x 2 = $2300, and out combined gross salary is about $20k, we are evaluating how much monthly should we top up in cash to service the 30yrs home loan. Our jobs are relatively stable. Thx
  10. hey all, what's the cost for a tear down and rebuild for 7000sqf approximately for total builtup? Total land would be about 5000sqf I was hearing the costs is around $300psf on average. Does that make sense?
  11. Hi all, As above. Brand new in box and unopened. Selling for $100. Just take and go at Telok Blangah Heights. Drop me a msg at 85185319 as i hardly check here. Cheers.
  12. pinkbean, if you see my other posts, you'll realise i mention 1 common but very important point. Payment plans. When all of us home owners manage this better, we wouldn't hear anymore of such problems. Your ID can behave like this to you because your balls are in her hands (Sorry if i'm crude, but this gives u an idea rite?). You have paid out too much, too fast for too little corresponding work to be done. It's like your boss can shout at you to do your work but u can never repeat that to your boss because your boss can fire you anytime but u can't fire the boss. In reno contracts, it's all about who has the power, you or the ID/contractor. I've heard enough stories to come to the conclusion that it's better for the home owner to have more power in this case. When you have not paid for what has not been done, your ID will be nicer to you mostly, do work quickly on time so as to get paid. Simple. I agree that if you have a good contractor/ID, you can pay alil bit in advance. It's fine... sort of to give and take also and respect the client-contractor relationship. The important thing is that the power balance always tilts in your favor. If your ID/contractor- does a bad job? demand a proper job is slow in his work? demand he move faster works fast and keeps u updated constantly? pay him abit more in advance... You can only do the above when the power balance tips in your favor and the power balance can only tip in your favor when you control the payment plans and pay only after work is done. It's not about how reputable the company is, it's not about how good and seemingly honest and innocent looking your ID/contractor is, it's not about how much of a good feeling you have with your ID/contractor. IT's ultimately about the payment plan. It's because ultimately you can always threaten as a last resort to get rid of your ID/contractor and change him provided there's a reasonable breach in contract. Oh yeah, general contractors only pay their sub-contractors after job is done, sometimes on credit somemore! so if they can do it, why can't you demand that from the contractor?
  13. simple lor.. u dun pay last bit.. tell them do a good job then case can close. they definitely have to clean all those stains and dirt especially when related to the work like paint marks, grouting fines, cement patches etc..
  14. Hhaahahahahha that's what most pple think. Use id doesnt mean he'll coordinate everything swee swee for u. Go read this forum fully, got tons of horror stories from id n contractor alike. Using id or contractor, one will still need to continuously check on progress. U only r paying more for id becoz he's able to better coordinate the design element n choice of materials. That really is it. N yes most ids got very good sales talk
  15. sigh.. another problem like this... It can only be rectified when people learn to control the payment plan. Only pay what has been done or pay partly in advance abit only. When one controls the money, then the power balance is tipped in your favour. I've only left 2 pieces of carpentry to finish fully (i.e. they are already being built halfway as of now) - tv feature wall and dining room storage seating cushion bench. Then just touch up on painting at those injured spots and I'll only be paying the 2nd last 15% today after going to see my place again. I'll pay the last 15% after ensuring all defects are rectified and handover by early next week. Contractors/IDs will always want us to pay up as much as possible, we always want to pay as little upfront as possible. It's about negotiations that allows both parties to be satisfied with the payment plan and an acceptable timeline handover date. My contractor was willing to accomodate our payment plan as we were a recommendation from his preivous customer and we told him we are wary of the renovation industry due to all the horror stories. So he was relaxed about it. Will set up a T-blog and share my contractor when all is completed..
  16. is there any breakdown of the quote?

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.