Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

mrmerry

Members
  • Content Count

    325
  • Joined

  • Last visited

Everything posted by mrmerry

  1. updates by mrs merry: Sorry for the late reply! the prices are negotiated by our ID. So I think it's not nice to reveal the actual pricing. In total, we spend about $3.5k on lights for the whole house. The guys from HiiGa were here again. So peiseh, made them come to our place for numerous times. We didn't like the original light switch design; so had an alternative switch BUT that sets the lights to flicker when in low light frequency. Ugh!! Thus today, the friendly guys came to change our 2 x 4 gang lights switch to the compatible version. This is is what we call service! Our house pictures are now featured in their Facebook - https://www.facebook.com/HiiGaPteLtd. I look at the pictures want to laugh! Cos our house is still so bare without accessories or any plants.
  2. hello macuser77! Thanks for setting my worries in the right place! Haha. I hope everything is going well for your new place! mrs merry
  3. We used quartz aspen for our counter top - marble look alike yet not porous. No stain and scratches. So far been good and loving it!
  4. updates by mrs merry Reno regrets or rather considerations for reno newbies: 1) the intense swarm of renovation sounds going around the neighbourhood is driving Mr Merry mad. So, never be amongst the first few to cheong finish renovation as you will be "enjoying" the symphony of renovation like we do. 2) The sink tap design. This looks beautiful but your dripping wet hands will soon cause a puddle accumulating around the tap. Consider something that the tap sits within the sink and where puddles will not accumulate on the table top. 3) Vanity table Something that we had not foresee. We chose a wide sink where you could wash your face happily without splashing much water on the sides. We grew up with a tiny basin and dreaded it. However we totally missed this part where the drainage hole happened to right above the vanity table. So cleaning toilette is an issue now. We cannot reach the below to wash it throughly and at the same time worry that the wood will rot with the amount of water splashing around as we tried to wash the area. Suggest to not to build the cabinet so low. Overall, we are quite pleased with all the reno works and purchases. We shall wait for Time to tell if all these purchases and reno works will fall apart sooner than expected.
  5. updates by mrs merry: It's 2 months in the new house! Mr Merry snapped the first photo showing his mopping evidence; whilst on his Teacher's Day off day last Friday. We already paid up everything. Despite that, Andy still promptly send down his painter do some touch-up work; one of the new wall has a crack line (the side of the washer/dryer) and the painter got it fixed within a week of notice. Both Andy and painter said that's very common for newly erected walls. Till now, we still highly recommend Andy's service. I missed the hustle and buzz during the renovation period. Our house remain bare. The speed of how dust accumulated is like a child sucking lolly. Fast and messy. House warming parties shall be starting soon as we get more settled in. For those still renovating, good luck!
  6. yah.. need to invite ppl to 搞旺的地方!
  7. =D my question is how are u gonna mount on the wall? set up already? let me guess.. u guys were watching 中国好声音?!
  8. WA LIEWWWWWWWwwwwwwwwwwwwwwwwwwwwwwwwww!!
  9. actually i still gian la.. but i think i will aim the sony ps4 first end of this year haha my ps3 pai liao : ( my bluray all cannot play. But i agree.. the sound from tv is actually quite decent.! My wife say she saw your home pics on Mr K's facebook already!
  10. hi JSimmy i think its abit useless la cause i know he plus n minus for various things to ensure his own fee. so its very unfair to breakdown and compare items by item. We are after all not talking about items but a overall service he rendered for us. =) sorry bro. OOps. i just realised i think u meant the hood n stuff,ill ask mrs merry to revert to u k she's the penny master.
  11. Congrats and welcome to RT! good luck on your journey ahead!
  12. Congrats bro! finally finished liao. time to do one whole set of swee swee pictures to let us "virtual tour" your place!
  13. Eh, we spent about 58K for the whole reno. 15K for furnitures and appliances. 3K for lights. 3K for all the sinks, taps, toliet bowls and blah. Much costs are sunk into better material selection and re-doing the toilets, service yard. Mr Merry wants a a consistent look for the entire home. Not even a tiny space like service yard can be spared too. I was trying to convince him to spend less but not fruitful. Of course a pretty home comes with a heavy price. We're broke now! Now I'm thinking how to delay Andy's payment to later months. *ahem* - mrs merry
  14. Erm, i cannot recall on the actual costs. our kitchen had 2 x backsplash ( one particular piece is from ceiling to table top) , 2 x table top, 1 x island top - all HanStone Quartz for about 7kish i think. Kitchen costs - I can't recall. 15k? I made alteration to all the bottom shelves to be heavy duty track drawers. - mrs merry.
  15. Hi kingfisher07 We love their lights! Awesome!! Our whole house is lit by their quality products - even bathroom, service yard and bomb shelter. Haha! The Merries are serious book readers - so if we can read comfortably long hours under this lightning. The verdict is clear. Seriously, this money spent (compared to those much much much cheaper version) is worth every cents. Maybe we are very sensitive to light temperature and colour - it fits us functionally and it makes our home look gorgeous at night too. haha. We realised, pretty homes need decent quality light sources. It REALLY set the home in a whole new dimension. FSM means FENG SHUI MASTER. - mrs merry
  16. Hi Razzberries, Yes, its full height. It cant be knocked down for our house layout. It's 100% original with all the electrical box and points for WIFI and blah. HDB also laid the gas piping outlet at that pillar too. The only thing we did to ensure a seamless look was to apply to a layer of sealant to the original door and paint over with our wall paints. - mrs merry
  17. Hello IsetanteO, There is no unforeseen items once the renovation starts. The only changes that we had were genuine unforeseen minor alterations and he will inform you the costs upright and if you like to change. I must stress that YOU (homeowner) need to be very meticulous with every single details at quotation and layout/technical drawing stage. This save the whole hassle of any other last min decisions on-site or miscommunications. Many at times, unhappy incidents happened as owners change their mind upon seeing the actual site reno as they can't visualised the real environment prior to that. Home owners need to play their role too. For Andy, he knew our preferences and expected quality to be delivered after numerous meetings together on drawing boards stage. We have blown an additional 7K as we changed certain things along the way - 1 example is changing kitchen glass backsplash to quartz backsplash was a huge cost difference. But that was clearly our decision and costs was made known to us. His quotation is very itemised and all inclusive. So those things that wasn't executed will not be billed to you. I hope that clarifies. - Mrs Merry
  18. Check thread posts and signature.=)
  19. Oh too bad! He's getting married. Was planning to intro him to my friends. Lol - mrs merry
  20. Hello! Andy Quek has met all requirements and our renovation had been smoother than we had expected. Or rather we had benefited from a 20-day planning discussion with him over 2 weekends; each lasting average 8 hours each Sat discussing over elevation plans and floor layout. Thus when the renovation actually kicks off we do not deviate from what we had discussed and agreed. As granular details had been thought off - from usage perspective, functional and aesthetics design perspective, material perspective and costs perspective. We had this 20-days as we were waiting for the auspicious FSM timing to kick off. This 20 days had allowed us to back off from over enthusiasm and forced us into planning the drawing board. And I will strongly urge any new home owners to do this process throughly. In addition, we are very clear with what we want in mind - our functional needs and aesthetics needs. I'm the only person that liaison with Andy directly throughout the 2-mths process. We communicated heavily on WhatsApp and via Phone. We exchanged ideas and feedback very frequently that I always ponder how he managed it as thou I'm the sole client he serviced. Haha. We like his service and will highly recommend his services. We have very hectic work schedules and he basically settled everything from aircon trunking, gas piping and all without us around (so we never took leave during this 5-weeks reno period). We visited the house only once a week to check on progress and provided feedback to him. Issues were rectify quickly and promptly. He has an even nimble mind than me; I'm very impressed. So I rely heavily on him to get things executed based on our discussed issues. Quality wise, we think is good. thou note that we're not fussy people. Our tolerance level might differ from other people. Most importantly, our home had turned out to be a beautiful one. It's hard to guess if it's a HDB from the pics. So far, no issues. Any minor issue, Andy will always be around to service us and promptly gotten it rectify. And he is a good eye candy to work with. - mrs merry
  21. naise. the opening concept " island " partition has got a good feel to it.
×