Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

polobear

Members
  • Content Count

    20
  • Joined

  • Last visited

Everything posted by polobear

  1. whats wrong with xclusive? I bought my sofa and dining table due to deliver tmr, don't scare me leh!
  2. Just sharing, Philips downlights http://item.taobao.com/item.htm?spm=2013.1.0.0.QtYEXr&id=21123968413 Livolo switches http://detail.tmall.com/item.htm?spm=a220m.1000858.1000725.16.HdTXq6&id=8726939588&user_id=645225636&areaId=&is_b=1&cat_id=2&q=livolo&rn=fe5cb955bedb10e271aa018c23c8d556 Philips led spotlight http://item.taobao.com/item.htm?spm=a230r.1.14.348.Nl95rR&id=21270868122 Don't buy from peeka or daigou, too ex. Get from this guy instead. http://forums.hardwarezone.com.sg/mass-order-corner-251/mo-taobao-com-paipai-com-other-china-websites-now-cheaper-alternative-shipping-method-2684430.html
  3. bro totally love ur lightings! Can I have the link to ur LED strips, downlights and livolo switches???
  4. Hi need to get a ceiling fan for my living and some led lightings. Do you have a catalogue or a shop where i can make my selection? Look forward to your reply
  5. Hi its slightly cheaper but there is a discount at the end so it kinda even out I guess.
  6. ya bto have existing floor tiles which cannot be hacked or removed for the next 5 years.
  7. I wont recommend as I haven't sign on the dotted line yet. Maybe halfway thru the process and if its good then I recommend.
  8. Way overpriced. U can check on my id quotation most items are similar but urs much ex. http://www.renotalk.com/forum/topic/61427-advise-on-quotation-for-new-5-rm-bto-flat/ Now I feel safer engaging my ID, if u need his contact pm me.
  9. Is this quote reasonable? B) DEMOLITION & ERECT WORKS :- 1) To provide labour to hack existing wall at kitchen, as per design proposed. $ 450.00 2) To provide material & labour to remove existing doorframe & hack existing wall at bedroom 2 (To convert as walk-in wardrobe area) As per design proposed. $ 250.00 3) To seal up existing entrance with partition wall at bedroom 2. $ 240.00 4) To provide labour to hack & remove existing door frame at bedroom 3. $ 90.00 5) To provide material & labour to touch up affected wall after hacking. $ 450.00 *All hacking / erect of wall are subject to HDB approval, PE maybe require by authority mentioned. C) MASONRY WORKS :- 1) To supply & lay 60 x 60cm polished homogenous floor tiles c/w skirting for living, dining, bedroom's corridor & study room. (Tiles @$3/-psf) $ 3,640.00 2) To supply & laminate floor board c/w skirting for 3 bedrooms. (Brand Wood Culture) Cement screeding will be done by HDB contractor. $ 1,965.00 3) To supply material & labour to overlay 30 x 60cm homogenous wall tile for master-bedroom. (Tiles @$3/-psf) $ 1,640.00 4) To supply material & labour to overlay 30 x 30cm homogenous non-slip floor tiles for master-toilet. (Tiles @$3/-psf) $ 550.00 5) To supply material & labour to overlay 30 x 60cm homogenous floor tiles for wet kitchen. (Tiles @$3/-psf) $ 600.00 6) To supply material & construct straight shower kerb, finish with tiles at master-toilet. $ 130.00 7) To supply material & construct L-shape shower kerb, finish with tiles at common-toilet. $ 150.00 8) To supply material & labour to 2 nos. construct cabinet base, side finish with tiles at kitchen. $ 350.00 D) CEILING & WALL WORKS :- 1) To supply material & labour to paint whole house with Nippon (Vinilex 5000) emulsion paint, include gloss paint for doorframe and pipes. (Max. 6 colours) $ 1,450.00 2) To supply & install false ceiling with L-box light holder at foyer, living and dining. (Exclude lightings) As per design proposed. $ 1,200.00 3) To supply & install false ceiling at bedroom's corridor. $ 120.00 4) To supply & install false ceiling & L-box light holder at master-bedroom, as per design proposed. $ 300.00 5) To supply material & labour to construct partition wall at new kitchen entrance. TL 3400mm $ 560.00 6) To supply material & labour to construct partition wall at new TV area ****. L 3500mm $ 590.00 7) To supply material & labour to construct false hanger beam using partition above glass panel & glass swing door at studt room entrance. $ 250.00 E) ELECTRICAL WORKS :- 1) Price list will be provide separately. F) ALUMINUM / GLASS/ DOOR WORKS :- 1) To supply & install alum. window grilles for living and 3 bedrooms. (Non-powder coated) $ 945.00 2) To supply & install sliding window for service yard. (Non-powder coated frame & standard tinted glass) $ 520.00 3) To supply & install window grilles for service yard. (Non-powder coated) $ 220.00 4) To supply & install 1 set 10mm thick frameless clear tempered glass swing door at kitchen entrance. (1 pivot swing door) TL 900mm x H 2100mm $ 550.00 5) To supply & install 10mm thick clear tempered glass fix panel at new planter box area (Bedroom 3) TL 1800mm x H 2100mm $ 630.00 6) To supply & install a 10mm thick frameless clear tempered glass swing glass door c/w handle at study room entrance. L 900mm x H 2100mm $ 550.00 7) To supply & install 1 set 10mm thick frameless tinted black tempered glass sliding door at new walk-in wardrobe entrance. L 900mm x H 2100mm $ 800.00 8) To supply & install 1 set 10mm thick clear tempered glass shower screen at master-toilet. (1 fix panel & 1 swing door) TL 1500mm x H 1800mm $ 390.00 9) To supply & install 1 set L-shape10mm thick clear tempered glass shower screen at master-toilet. (2 fix panel & 1 swing door) TL 2000mm x H 1800mm $ 510.00 10) To supply & install 2 set new solid timber door frame for master-bedroom & bedroom 3. $ 480.00 11) To supply & install 2 nos. new semi-solid veneer door c/w lock for master-bedroom & bedroom 3. $ 640.00 G) PLUMBING WORKS :- 1) To supply labour to connect inlet and drainage pipe for sink and tap. $ 120.00 2) To provide material & labour to install piping from gas heater at service balcony to toilet. $ 200.00 3) Labour to install 2nos. Bi-jet spray. $ 60.00 4) Labour to install 2 set bathroom accessories. $ 90.00 5) Labour to re-install 1 no. toilet bowl & 1 no. wash basin. $ 150.00 *All above fittings will be provided by owner. H) CARPENTRY WORKS :- Wet Kitchen - 1) To design, fabricate and install top & bottom kitchen cabinet, finish in laminate. Estimate TL 28ft $ 3,360.00 Include - a. 1 pc. Cutlery Tray b. 1 set Stainless Steel Dish rack c. ABS Edging Doors d. Anti-slam hinges for casement doors e. 4nos. Drawers 2) Labour to install cooker hood. FOC 3) To supply & install solid surface table top, include backsplash. 18.5ft L $ 1,387.00 Dry Kitchen - 4) To custom made a full height cabinet next to kitchen entrance. $ 720.00 5) To custom made a top & bottom cabinet c/w tall unit for oven. 16.5ft L $ 1,980.00 6) To supply & install solid surface table top for kitchen cabinet. 4ft L $ 300.00 7) To design & custom made a lsland cabinet. L 1800mm x W 700mm x H 850mm $ 1,440.00 8) To supply & install solid surface table top for island. 6ft L $ 570.00 Living - 9) To design, fabricate & install a suspended shoe cabinet c/w mirror door. L 1200 mm x W 300mm x H 2400mm $ 1,000.00 10) To design, fabricate & install a suspended TV console c/w drawers. L 2400mm x W 450mm x H 300mm $ 1,040.00 11) To provide material & labour to paste wall paper at TV backing partition. $ 550.00 12) To custom made a planter box at study room area. L 800mm x W 600mm x H 250mm $ 300.00 Master-bedroom - 13) To design & custom made a king size bed frame. $ 1,130.00 14) To custom made a headboard c/w recess lighting pelmet. L 3400mm x H 1000mm $ 935.00 15) To custom made 2 nos. suspended bedside table. TL 2400mm x D 400mm x H 40mm $ 400.00 16) To custom made TV wall feature. L 1800mm x H 1200mm $ 640.00 17) To custom made a suspended TV console for DVD player. L 1300mm x D 350mm x H 300mm $ 585.00 18) To custom made a cushion settee along window area. L 2500mm x D 500mm x H 500mm $ 1,360.00 Room 2 - 19) To design, fabricate & install set full height wardrobe with sliding doors. TL 6500mm x W 600mm x H 2400mm $ 5,590.00 20) To design & custom made a suspended dressing table c/w a mirror. L 900mm $ 640.00 Master-Toilet - 21) To supply & install a mirror with cove light at top & bottom. L 1700mm x H 900mm $ 280.00 22) To supply & install a suspended vanity cabinet c/w solid surface top. L 1100mm $ 685.00 *Note - All above carpentry work are finish with plywood and laminate surface, internal finish with white colour pvc, otherwise stated. I) MISCELLANEOUS :- 1) To provide labour to lay protection sheet for whole house. $ 150.00 2) Chemical wash for whole house wall & floor tiles. $ 250.00 3) Submission of HDB permit FOC 4) To provide labour to haulage of material to unit. $ 650.00 Total : $ 47,772.00 Discount Amount : $ 972.00 After Discount Subtotal : $ 46,800.00
  10. For LED lights isn't it much cheaper to order directly from tao bao?
  11. (EXCLUSIVE PACKAGE FOR HDB BTO FLATS) A (PROFESSIONAL SERVICES) Space planning & conceptualizing Furniture planning & products pre-consultation Project management,site supervision & auditing 3D drawings for all carpentry works 3 years warranty with guarantee after sales service B (MASONRY WORKS) Construct 50MM height Kitchen cement mortar base with skirting Construct 50MM height W/M & Fridge cement mortar base with full tiling C (PLUMBING WORKS) Supply & install inlet & outlet piping for Kitchen sink Supply & install inlet & outlet piping for W/M Supply labour to install Kitchen sink & tap Supply labour to install 2 sets instant heater OR storage heater Supply labour to install 2 sets Bathroom accessories D (CEILING WORKS) Design & construct L-box @ Living/Dining Design & construct false ceiling @ Foyer area E (CARPENTRY WORKS) Design & fabricate 20ft (Top & Bottom)Kitchen cabinet using solid plywood with Laminate + soft closing doors Supply & install 10ft solid surface worktop Supply & install designer handles Supply & install 1 set frosted glass door Supply & install 1 column of drawer with 1 set cutlerytray Supply labour to install cooker hood & hob Design & fabricate 5ft full height wardrobe @ M/Bedroom in Laminate F (MISCELLANEOUS WORKS) Painting of internal wall & ceiling using Nippoin paint (Max 4 colors) Painting of all doors,frames,pipes & gate Provide corrugated paper protection to flooring Chemical washing for whole unit General cleaning upon completion of works SUB TOTAL AMOUNT FOR PACKAGE : $ 8,188.00 (ADDITIONAL WORKS) G (HACKING & DISMANTLING WORKS) (KITCHEN) 1 Supply labour to demolish away half height of entrance L-shape wall $ 550.00 (Subject to HDB approval)(Exclude PE endorsement if required by HDB) (MASTER BEDROOM) 1 Supply labour to hack away ext'g metal door frame, remove door & hack away side wall $ 280.00 (Subject to HDB approval)(Exclude PE endorsement if required by HDB) (BEDROOM 2) 1 Supply labour to hack away ext'g metal door frame & remove door $ 250.00 I (MASONRY WORKS) (KITCHEN) 1 Supply labour & materials to touch up to affected wall tile areas using matching HDB tiles $ 400.00 2 Supply labour & materials to construct additional 50MM height Kitchen cabinet base $ 200.00 (MASTER BEDROOM) 1 Supply labour & materials to render smooth to ext'g door frame areas $ 200.00 2 Supply labour & materials to construct timber door frame for new entrance $ 290.00 3 Supply labour & materialsto construct door lintol above new door frame $ 180.00 (BEDROOM 2) 1 Supply labour & materialsot seal up ext'g door entrance using 63MM hollow blocks $ 280.00 2 Supply labour & materials to cement plaster smooth to both sides of wall $ 200.00 (MASTER & COMMON BATHROOM) 1 Supply labour & materials to construct shower kerb c/w full tiling $ 280.00 H (PLASTERCEIL WORKS) (LIVING AREA) 1 Design & construct plaster false ceiling $ 450.00 (DINING AREA) 1 Design & construct plaster false ceiling $ 550.00 2 Design & construct cove light holder $ 250.00 (PASSAGEWAY AREA) 1 Design & construct plaster false ceiling $ 280.00 (MASTER BEDROOM) 1 Design & construct plaster false ceiling $ 450.00 2 Design & construct cove light holder $ 350.00 (BEDROOM 2) 1 Design & construct plaster false ceiling $ 450.00 I (ELECTRICAL WORKS) (LIVING) 1 Supply labour & materials to run 8 nos PLC downlight points $ 392.00 2 Supply labour & materials to relocate 1 no SCV point & 1 no 13AMP Double socket into TV wall $ 250.00 3 Supply labour & materials to run 4 nos light point @ Platform area $ 196.00 (DINING) 1 Supply labour & materials to run 5 nos PLC downlight points $ 245.00 (MASTER BEDROOM) 1 Supply labour & materials to run 4 nos PLC downlight points $ 196.00 2 Supply labour & materials to run 6 nos Cove light points $ 294.00 3 Supply labour & materials to relocate 1 no SCV point & 1 no 13AMP Double socket into TV wall $ 250.00 4 Supply labour & materials to run 3 nos light point @ Platform area $ 147.00 5 Supply labour & materials to run 2 nos light points @ Bedhead $ 98.00 (BEDROOM 2) 1 Supply labour & materials to run 4 nos PLC downlight points $ 196.00 (KITCHEN) 1 Supply labour & materials to relocate 1 no Lighting switch & 1 no 13AMP Double socket $ 250.00 (Entrance wall area after demoltion ) J (CARPENTRY WORKS) (KITCHEN) 1 Design & fabricate additional 2ftL Kitchen cabinet (Package consist 20ftL) $ 240.00 2 Supply labour & materials to install additional 1ftL solid surface worktop $ 85.00 (Package consist 10ftL) 3 Design & fabricate 2ftL x F/H Storage cabinet using solid plywood in selected high grade Laminate finished for built-in Oven & Microwave $ 720.00 4 Design & fabricate additional 3.5ftL Bottom Kitchen cabinet using solid plywood in selected high grade Laminate finished $ 420.00 5 Supply labour & materials to install additional 3.5ftL solid surface worktop $ 298.00 (LIVING AREA) 1 Design & fabricate 7ftL x F/H Design TV feature wall using solid plywood in selected high grade Laminate finished $ 1,960.00 2 Supply labour & materials to install mechanism for TV rotating $ 280.00 3 Design & fabricate 5ftL x L/H Design TV console using solid plywood in selected high grade Laminate finished $ 850.00 4 Design & construct elevated Platform using solid plywood $ 1,400.00 (DINING AREA) 1 Design & fabricate 6ftL x L/H Dining sette using solid plywood in selected high grade Laminate finished $ 1,020.00 2 Design & fabricate 6ftL x 2.5ftH cushion backing @ Sette $ 720.00 (MASTER BEDROOM) 1 Design & construct elevated Platform using solid plywood $ 1,100.00 2 Design & fabricate 7ftL x L/H Bedhead using solid plywood in selected high grade Laminate finished $ 1,400.00 (BEDROOM 2) 1 Design & fabricate 11.5 ftL x F/H Walk-in wardrobe using solid plywood in selected high grade Laminate finished for carcass c/w color polygrene internal finished(w/o doors) $ 2,415.00 2 Design & fabricate 10 ftL x F/H Walk-in wardrobe using solid plywood in selected high grade Laminate finished for carcass c/w color polygrene internal finished(w/o doors) $ 2,100.00 3 Design & fabricate 2.5ftL x L/H wall mount suspended Dresser using solid plywood in selected high grade Laminate finished $ 400.00 4 Design & fabricate 4ftL x L/H wall mount suspended Study console using solid plywood in selected high grade Laminate finished $ 640.00 (MASTER & COMMON BATHROOM) 1 Design & fabricate 3ftL x L/H Storage cabinet using solid plywood in selected high grade Laminate finished @ ext'g Vanity basin(Master Bathroom) $ 480.00 2 Design & fabricate 2.5ftL x L/H wall mount suspended Vainty cabinet using solid plywood in selected high grade Laminate finished(Common Bathroom) $ 400.00 3 Supply labour & materials to install 2.5ftL solid surface worktop @ Vanity cabinet $ 225.00 K (GLASS WORKS) (DINING) 1 Supply labour & materials to install 6ftL x 3.5ftH x 5MM thk Tinted wall mirror $ 420.00 (MASTER & COMMON BATHROOM) 1 Supply labour & materials to install F/H Mirror @ Basin area $ 480.00 2 Supply labour & materials to install 10MM thk clear Tempered glass swing door shower screen @ Master Bathroom $ 650.00 3 Supply labour & materials to install 10MM thk clear Tempered glass sliding door shower screen @ Common Bathroom (L-shape) $ 700.00 (KITCHEN) 1 Supply labour & materials to install 10MM thk clear Tempered glass fixed panel on entrance half height wall $ 750.00 2 Supply labour &materials to install 10MM thk clear Tempered glass swing door (1 swing + 1 fixed) $ 850.00 K (PLUMBING WORKS) (COMMON BATHROOM) 1 Supply labour to install 1 no new design basin (basins supply by owner) $ 80.00 L (WINDOW WORKS) 1 Supply labour & materials to install aluminium sliding window @ Service Balcony (BA/NA) $ 650.00 N (LAMINATE FLOORING) (LIVING AREA) 1 Supply labour & materials to lay heavy duty HDF Laminate floorboard @ Platform area $ 880.00 (MASTER BEDROOM) 1 Supply labour & materials to lay heavy duty HDF Laminate floorboard @ Platform area $ 600.00 M (OTHER WORKS) 1 Debris disposal costs $ 2 50.00 2 HDB permit handling fess $ 150.00 GRAND TOTAL AMOUNT : $ 40,205.00 As i'm building a walk in wardrobe, (Design & fabricate 5ft full height wardrobe @ M/Bedroom in Laminate) will be removed. Is this quote reasonable for a 5 room flat?
  12. Anyone engage their services before? Office at jurong east st 24. Was recommended by my friend for good service and reasonable pricing, but should I look out for more ID and get more quotes?
×