Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

Angelwrath

Members
  • Content Count

    581
  • Joined

  • Last visited

Everything posted by Angelwrath

  1. wah u mean u got ur keys on the 1st appointment? we chose in apr, got keys in mid-july too. how old is ur blk?
  2. went to daiso yesterday and saw those newspaper holder. it's just how u stack them up but this works like an inverted plastic stool with a base and 4 legs upwards.
  3. IMM has just moved their ID firms to the 3rd floor, concentrated together. you may want to drop by and take a long walk through
  4. hmm, MaCe these are so true. LoL but hor really leh, if not L-shape sofa then get those 3+2+2 even more obiang leh. L-shape sofa hor, if hubby do something wrong he still can sleep comfortably there. hmm, skirtings i think they have their practical use ba like your saying mopping for one. con is that it leaves a gap and eat u off ur already tidy space. wah liew those tiles like very the dangerous. u should open the window and tell her to DIAM LA! WAT TIME LIAO! SEOW CHAR BO!! actually if it's me i run liao. LoL
  5. hehe hopefully ba. think u are getting ur keys soon, hang in awhile more. hehe or else albert also wont arrow me ask me organise la, lol Broyz did mention ur situation can overlay over ur present tiles, think dont need screed. save $$$ and on top of that if Donut or Oreo naughty naughty scratch ur laminate, still have the tiles below. haiz, desperate liao. sometimes can just break down and wat's worst u see another fault and stab urself more. um1 tun2 sorry, miss ur post. oh! how much u got them for, Junkay?
  6. fortunately, i dont have those lines leh. Maybe they havent touch up?
  7. Lydia and Pauline's the PR, i did aliase more with the restaurant manager Kenny though. Lydia's on leave that time, must say Kenny's service is average only. yup, paid extra for the reserve table. Stage, my rom set up. Theme: maroon for your reference. and ya 2 years a little too early. maybe go as planned, book only in dec lor.
  8. Hey ilys, oh wow we have the same taste, lol bought them from Premier lightings in geylang. those in the foyer/feature are 2 bulbs, with the adjustment "plug" thingy. avg. cost around $54 and im not sure whether there's a smaller size one wor. mine was not handled by town council or hdb, was ID's sub contracted shower screen worker, but he indeed is efficient. this morning i went up it's ALREADY fixed, minimal delay !! only 1 tile was affected, and HDB doesnt have those tiles it will be aweful to just change one of it, isnt it? dont think ID would bear the cost and change all the toilet tiles just cause of that one, not practical. You went to Dreams on ur own? where is it?
  9. the stage is really kinda small. really no space for a projector, unless they have those roll-down type. cheesecake, u need to take into consideration for those reserve tables. that time my ROM we had an extra reserve table vacant but it's still charged into the bill. So u might want to take note of this, think is their policy. Look for Lydia Chua, she's
  10. It's been my pleasure, ID sourcing must have been an headache, glad it's over for you. Actually he's the 1st ID we shortlisted and already feel he's the one. Heng for us, save alot of legwork. i knew you will like his design and 26.8k plus hacking and WIW He really got give me face, LoL. We will have the same 360deg TV console! uhm, and you may want to edit off ur address. hehe.. Congrats once again. i heard meet up! me want go too!
  11. Oh albert get key liao ar?! congrats! post more pics leh
  12. lol why did u sit down on ur toilet floor? ya i think better be there when they do rectification, cant trust them lor. Pics think i'll upload on monday, cause this weekend burnt again. gonna change the vanity top with Sims and go recce wedding venues. the toilet problem is it that common? or the sub contractor our ID engaged just not experienced? Well at least our ID's rectifying it fast for us. Tml im going down to supervise the soldering of water pipe, now where to find the same toilet wall tiles. hmmmm hehe my Poh Joo stuff in that pic havent unpack yet, how u know same leh? =p he did mention ya the one who brought him there. things are cheap, deliveries prompt, just their variety can be improved on. sent me 1 defected and 1 rusty toilet roll holder though did ID brought u to dreams lighting? he brought me to priemier, find them a tad on the high side, though the lights are swee swee.
  13. LoL we both so free at work. oops. hehe cause i not project now. it's confirm cant fit in le. i even teh at hubby ask him shift the WC or try put it at another angle, but that would be too squeezy le and the door may not even be able to close. this kind of situation, dream sink also have to let it go le. i only manage to take pic of the basin without the top. when i drag the whole set down to exchange then i take pic for u, k? wah lau so small de bathrooms, HDB also able to make so many defects in there siah. how did cement get in the toilet?! and how to chip a WC, ask HDB teach me leh.
  14. *cough* that vanity top we bought ourselves at SSC one. ourselves for not measuring before buying. wah, then how ur floor tiles? they are rectify those for u mah. Applefreak u are my loyal blog reader la, give u a hug! like noone else reading le :~
  15. when i recieved the call i also want to then 5 minutes later hubby call me say my vanity too big. It goes till the middle of the W.C lor. double blow. cant have my love in 1st sight vanity. even more. it's not my ID la, it's the sub-contracted out shower screen installer. the problem now is that HDB may not even have the tiles to cover it up after hacking the toilet tiles to solder the concealed water piping, and wat's going to happen to my installed rain shower?! at least hubby was there when this happened, or the sub contractor could have act blur and patch it back, cant imagine the bills lor. HDB say they could suspend the ID firm if they nv fix that for me, so i guess they dont dare to not ignore it ba. HDB finally changed my bi-fold doors for me. they very smart lor, nv tile the kerb and install the frame onto the cement as seen in the picture above. then cracked 2 tiles in the common toilet. VERY li hai! *golf clap* more pictures from yesterday The Lights story Foyer / Feature wall area downlights Kitchen light close up, see the waves? Kitchen lights and ceiling painted - Rose white Common toilet hamburger light Living room light still in box Cosy area / platform light in box MBR toilet light Storeroom's hamburger in wrapper the toilet accessories from poh joo monday will upload pics during the Lights Up Ceremony
  16. Hey toratora! welcome to sembawang! =)
  17. i almost got an heart attack when i went up just now. THE PLUMBERS BURST MY CONCEALED WATER PIPE when installing my shower screen!!! and if they think i wont die from the heart attack, here's another thing my SSC vanity top / basin is too big for the MBR toilet. waste $600. I want to faint liao............. Call ambulance please.......................
  18. Thanks Air and storeberry. Im considering yunnan, cause in the west, easily accessible and ppl know where's IMM. ya, the question is whether they still exist after the revamp. Im also wondering abt whether IMM's ballroom still exist. the restaurant abit the cheena. will give them a call soon. Think u should book 1st lor. since PJ is so hot, when the date draws near and you decided against it, still can let it out. Im sure there will be people who will buy over from ya. But seriously it's not bad leh.
  19. Our favourite. Study room painted - Fizzy Lime Bedroom 2 painted - Lavender Mist. Turns out a little too dull? MBR lights installed - one of my favourite, the 1st thing i layed my eyes on in the lights shop. LoL. painted with - Sandstone & white linen. 1st coat, will get them to paint the L-box and the ceiling too. One of the stupid things HDB did. My MBR toilet w/o the kerb tiles. It's either i ask them to dig up tiles from 3 years ago or my ID has to lay it with laminate which is an absurb thing to do. toilet with laminate. WTH. notice the door frame not changed and bi-fold door not up yet which delayed my laminate installation in the bedroom. Heading up now during lunch time, will update more when i get back.
  20. Pictures time! Surprising I took alot, 22 in all. Applefreak will have a feast! LoL I'll let the pictures do the talking. =) Here's all the doors: Main door / gate painted - Apple white All bedroom doors painted - Apple white Colourfull rooms, Lights on platform Living room painted - Slivermirk & Candlelight Notice the slanted circuit board and HDB's uneven box up? =(
  21. nono, safra also can. just safra need to pay alittle more for the facilities.
  22. LoL Junkay, why u so agitated? more worked up than me. it has just been a month + that i've gotten my key, so it's not that bad yet. there are others more deserving of the media's and CASE's attention, like renovictim and oinkgal. im consider one of the fortunate liao. rather just push and rush them and hope they finish up their rectification fast.
  23. HEy Hey welcome Bernice~ finally start ur blog le =) u mean u bought from ur parents-in-law? reno havent start u already bought ur furnitures, sanitaries, appliances and tiles! wow, certainly got do homework oh?! LoL
  24. huh, they already so slow liao u still ask them to hold rectification works. alamak. got pix got pix, tml i upload. Lol
  25. I just read that we have a Hometeam in sembawang? there's a chalet and BBQ huts in there, but where is it ar?
×