Everything posted by Ahyong81

  1. Our island is useless, according to hdb rules, u can only use the existing kitchen area as the wet kitchen, even do a island, it can only be a dry kitchen, cannot put sink or stove.
  2. Lol our small hdb hard to have island haha.. although we living on an island
  3. Renovation Journal (Daily) - Day 28 Apologies for the poor lighting. Went to take photo late at night after work. Partition walls are up for master bedroom, dining area false ceiling design completed and toilet box up plasterboard installed. The Distribution board also installed by the electrician.
  4. I want to buy nice switch... end up whole of sg dont have a place to really see it, end up i order from overseas. That is how bad it was. Dont worry 1 more month and its done.
  5. House renovation is super stress de... too much options and choice. Want to hin liao....
  6. Lol end up you decided to go with your contractor/id?
  7. You can change the position of the wc by using a p trap connector instead of the original s trap connector. However you need to buy those p trap wc, mostly are those suspended type and they cost about 600 to 900 for one, there are also higher price range type above 1k but i think its not worth to spend anything above 1k for toilet bowl.
  8. Hi can i ask what is the price for the windows insect screen and where you got it. Thanks in advance.
  9. It wont be long for the design concept and 3d drawing, it can be done or complete in 1 week time.
  10. Lol. Guys ok de. Cause you single like me so thought you are 35. For me i am under 35 but above 30 lol. Got this saying 男人四十一条龙. I brought my stuff all mostly from local And most of the applicance is by friend connection to buy at a very good price then what outside can offer or promotion price.
  11. Must post regular updates since we both single bachelor renovating our man cave. Am interested to see how it evolve. So you are 35?
  12. Haha.. going well fast. Your renovation timing or schedule so similar to mine
  13. Renovation Journal (Daily) - Day 27 False ceiling nearly completed / patching work will be up next
  14. Renovation Journal (Daily) - Day 26 More false ceiling works, box up most of the aircon trucking and also level the beam at the master bedroom by adding addition plaster board.
  15. Renovation Journal (Daily) - Day 25 False ceiling works goes into the kitchen and patching up works for previous false ceiling works. Foundation lay for common room.
  16. Renovation Journal (Daily) - Day 24 Ceiling works begin today, material also arrived. Amazing how fast one man can do it for the entire house false ceiling.
  17. Renovation Journal (Daily) - Day 23 The Starhub guys came today to run the network cable for the IP TV set top box. One for the master bedroom and one at the living room. The two point are FOC.
  18. Renovation Journal (Daily) - Day 22 Some patching works as well as painting the big waste pipe in the master bathroom in preparation for the ceiling works and box up works. After the painting, the pipe looks blend in with the entire color scheme of the master bathroom.
  19. Maybe should organise some shopping trip together for fellow forumers to share experiences and knowledge.
  20. Renovation Journal (Daily) - Day 21 Finally the installation appointment for the NLT to install the fiber termination point. Today also have make arrangement for Air-con piping and trucking to be lay for the LG Aircool System 3
  21. Grats mine also target end oct. Feeling excited to move in to my first house of my own.
×