Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

Sendo999

Members
  • Content Count

    48
  • Joined

  • Last visited

Community Reputation

1 Neutral

About Sendo999

  • Rank
    Bronze Member

Previous Fields

  • Gender
    Male

Recent Profile Visitors

1,174 profile views
  1. My wife also said she can do her face painting on the floor. All the best to your renovation journey. Enjoy.
  2. Hi Slashmylove, Have seen my hood... They did leave a gap... Think it is a space for expansion n contraction of the hood..
  3. If I'm not mistaken, mine do not have a gap... Will check to confirm since we have the same model of hood. Most likely tmr...
  4. I have got to agree with you that I'm lucky to have matching tiles... Your mosaic tiles looks good too... How I wish I can put in a bathtub... Idea rejected by my wife... Thinks she is afraid that I hogged the bathroom for too long... The rectification work is done. The hanging light is lifted up, the paint mark at the gate is cleaned up and the internal PVC is replaced.
  5. slashmylove I wun say I can graduate lah ... Many things that can still be learnt from the rest. Congrats on your reno going to be completed soon too. bykaraanne think nowadays HDB has improved on their designs compare to all the horror story from the past. Your mosaic tiles in the bathroom looks good too.
  6. During the visit last Sat, we notice that there are alot of small bugs which if we dun look closely, we will think that they are dust. Wondering is it normal for a new home to have some "company". Coz heard from my mum that her house used to have a lot of beatles initially when she moved in to her house. Will do a first round of killing on my next visit. 罪孽深重.
  7. All lights, accessories, countertop and tempered glass backsplash are up. Hanging lights at dining area. We find that it is hanged abit too low for our liking. Lights at MBR. The Rat says that its not bright enough. She is the one that do not like it too bright. Lol The taste of before and after of a pregnant woman changes. A plank at the side of the MBR, as we can't find such small bedside table. So we get the ID to put in for us. Light at other bedroom. Painting at dining area. It's not completed yet coz initially we do not intend to leave them there, we wanted to put them on the shorter side of the dining area. But ID says it's better to put it there coz if we put at the shorter side, which housed the aircon, it will look lopsided. Since I order onli 2 pcs of the frames with pic, I have to order again. MBR toilet basin up. Kitchen sink, countertop and tempered glass backsplash. Common toilet A bar at the service yard for hanging of cloth. After all the installation, we went for a final round of checks and realised some issues that need rectification. 1) Long scratch at the internal pvc of the wardrobe. 2) Paint marks on my main gate. 3) As mentioned earlier, the wire of red hanging light needs to be shorten. Think that's about all that we felt that needs rectification. Hopefully it will end smoothly.
  8. Initially I was still thinking whether am I too particular. But the more I see the scratch mark, the more I feels uncomfortable. So I will let my ID know so that he will rectify the problem .
  9. Your house is looking good. I changed my MBR sink at the last min too. As we did not overlay the MBR toilet wall, so we just proceed to change the basin. Hope the change is worth the money.
  10. Hi, Did you call up Hoe Kee? Or confirm with your ID that it is normal anot?
  11. Anyway there is a long scratch on the internal pvc of my wardrobe. Although it's not an eyesore, I would still prefer to get the ID to change. Coz we pay for it. What do the rest think?
  12. Carpentry is more or less completed. Tic tac door, shoe cabinet & display cabinet. Feature wall MBR wardrobe MBR toilet Bedrooms Kitchen Think now left only plumbing works and the rest of the lights liao.
  13. Aircon installation day. It took around 3.5 hours to complete. But hiccup happen. The living room unit got minor fault. When the air con is on, the power light keeps blinking. The installers say need to get Toshiba person to come down coz they can't open the inside as it is under warranty. If they were to open it, the warranty will be void. Haiz. On the same day, taobao stuffs arrive. No time to check the stuffs. 2 days after the aircon installation, all the woods have arrived, meaning carpentry works will be up soon. The Rat commented that the nest looks like a warehouse. 3 days later... Tadah... Feature wall Shoes cabinet with tic tac door to cover the household shelter door. Display cum storage cabinet Kitchen cabinets MBR wardrobe Bedroom Think the end is near.
×