Skip to content
View in the app

A better way to browse. Learn more.

RenoTalk.com ™

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.

jaCKY777

Members
  • Joined

  • Last visited

Everything posted by jaCKY777

  1. Y human is like dat 1 Expensive -> complain Cheap -> olso complain Isnt it good dat e propose quotation is sign by both e ID & manager Aniway, any latest update of reno done by Baroque
  2. Hey sushibabe, so who's e ID u'd ngage Hey Liana79B, e 'stuffs' u gona buy, most of e time seems 2 mi beri special 1 or different frm many of us lei. Mayb u wana consult e sales exec at e respective shop. Think they shd b able 2 give u their profesional advice & info. 2 mi, both shd b e same bah, except e material Hey meepok, i share e same tots s u. So how's ID hunting
  3. mi gota learn. Btw, wats 'fa kua'? Cant realy figure out frm e translation? Hey shutiao06, mi jus replied in ur 'Firms & Services' thread on Decomark. So ID who? Reno status?
  4. Hey shutiao06, how? ngage them? Half yr ago, wen i was hunting ID for my new hm reno, i chance upon their 'showcase' in RADAC website. I kinda like e effect, so all e way, i travelled frm Woodlands to Jurong, to e office & showroom at Jurong East. Was serve by a middle age guy (4goten name liao). Told him my requirements, budget. Then he on-e-spot, sketch out e proposed designs. >1hr spent in discussing e design, was kinda dissapointed, so jus had 2 accept watever designs he proposed. Dun wana waste my time further. On-e-spot, he calculated for mi e quote for e whole reno contract. e pricing was average. But e design theme, materials & colour scheme all r against my expectations & requirements which i had told him at e begining of e consultation. He's olso not clear abt e type of finishes & e normal layout of my new hdb standard flat, despite he said he's a senior in e industry. Conclusion, did not nage them, so cant comment abt e workmanship & service. Mayb i got no luck in e correct ID frm dat co. e 'showcase' in RADAC website is merely 3D drawings, not completed projects.
  5. Hey zanie98, how reno status? Wat u'd been quoted shd b jus e runners only. Fyi, normally, the drawers is made of solid plywood, white pvc finish internally, laminate finish externally, ABS trimming at 4-sides of cabinet door, alum recessed handle or 'designers' handle. To mi, i find $50 for a complete drawer is cheap? Hey vowsh, read thru e past few pages. There's a discussion on e haulage thingy. 4rm-$800-$900 5rm-$1000 -) Both payable to e term-contractor who sub e whole haulage contract for blk 79. -) Town council fees is another sum (<$200), w or w/o hacking, b'cos TC provided e debis collection tank oleady. See whether izit include in your quotation from ID. Correct mi if i'm wrong.
  6. i got a simple plan. Mayb one of us can go befriend e 'workers' esp e foreman who r doin e Haulage & Clearing of debris. Tel them dat They r being watched bcos of many theft cases. Once being caught red-handed, they will b jailed , fined & rotan . If they r e one, they sure scared, then theft cases may b able 2 reduced. If they r not e one, then they may b able help us hav e lok-out, as they r phsically at 79 working frm morning till nite.
  7. aiyo, we pay such high price 4 e 'flat' yet get a cheap doorbell cover, so eazily remove dun tel mi e doorbell cover is made of Gold take 4 wat got nice door at refuse area dun take take doorbell cover. STUPID
  8. u mean e white color square plastic cover with a bell imprint?
  9. Hey, if i'm not wrong, e plot of land between e Toa Payoh Entertainment Ctr & e main road, near e entrance to hdb hub, already tendered out. Its a small mix development, low-rise, with office & commercial space. Yrs bak, b4 e old 79 was being Enblock, there were oleady rumours dat e Road In Front of 79 would b closed & replaced with Paved Walkway. Push-carts etc can do business there. Yesterday, e rumours surface again. Haha. For now, e 2 confirmed residential developments in TPY, r e DBSS site at lor 1A, and Condo at lor 2/3. Come bak 2 e ERP thingy. Actually, e gahment can consider 1) Lor 8 (rd beside canal to change direction), 2) Toa Payoh Rise (1-way section outside Girls Home to becomes 2-way). Think dis shd increase e existing 5 rd entries into Toa Payoh to 7. Now 79 got Secret Code liao.
  10. Aiya, small matter, u r not at fault lah. Jus dat our timings bei gum nai mah. So u went Sungei Kadut? International Furniture Centre? IFC got quite a nos. of brands available there. Manage to buy ur desire sofa set?
  11. And e kitchen is over there? Normal floor cleaning agent olso canot?
  12. Hey Yang Guo, i agree with h4happy, e final product seems Its a pity i'd missed e 'kpo session' 2day.
  13. Hey josephine, 85% done is referin 2 e cabinets or whole reno? Can noe who is ur ID or contractor? (PM mi if u dun wana post here) Olso #13 got 5 blocks leh, difficult 2 find.
  14. Hey korea, oh i had mixed-up 'Padang', 'Canning' & 'Collyer' combine is Raffles Ballroom. Stamford Ballroom is smaller with pte cocktail reception area Mi? Havnt lah. LLLooonnnggg wwwaaayyy to go.
  15. Like dat huh 2-3 wks time is CNY de le. Might s well delay til late Feb08 or early Mar08 then collect keys.
  16. Hey korea, Stamford ballroom Izit 'Padang', 'Collyer' or 'Canning' If it is all, then u mus hav held a Big & Grand Banquet Also, its e biggest ballroom of Swissotel with double-volume space (high ceiling). Yes, i agree, e food there is
  17. jus checked with my fellow neighbour abt e postal code thingy. Yes, u r rite, i'm frm E dats y 315 Wher got ID or contractor dun wana offer their services wen can earn $$$ If u cant find any & got alot $$$ to spend, mayb can cum lok 4 mi, i do 4 u.
  18. Hey, Welcome! Welcome! Spend some time read thru e forum other threads, u wil find very useful tips, infos & lobangs. Regarding e 79 thread, u may wana try 2 read frm mid yr 07 onwards. Dunoe how 2 choose ID or contractors? Y dun u check with ur frnd who's unit is currently renovating? u can olso team up with ur e other frnd, go hunting 2gether lah. Btw, fyi, e postal code for blk 79 is 315079. Cheers.
  19. Mayb thers a catch in e above sentence It would b HEART-WARMING if - Toa Payoh residents motorists got immunity frm dis ERP gantry or - Toa Payoh residents motorists would b issued with special IU/cash card dat would not deduct wen passing thru dis gantry. This in turn deters non Toa Payoh residents frm entering via dat rd during operational hrs. Lessen e traffic. If dats e case, e gahment is HAPPY, Toa Payoh residents olso HAPPY.
  20. Hey sunzhi, my las qns is e space between e top & lower kit cabnts. Izit gona b Stainless Steel Backing or Coloured Glass Backing or Green Glazed Wall Tiles? e color scheme is wat i had in mind 4 my upcuming... Lookin 4ward... Cheers.
  21. Hey almonddust, u shd hav gather s many TPY ppl petition signatures s possible b4 u email in. Actually, i kinda lost. Dunoe izit gona b charge IN or OUT of TPY? Can i noe wher is e exact loc of e new ERP gantry at TPY lor 6? 1) Exit frm Braddell Rd (come frm Bartley Rd), enter TPY lor 6; 2) Exit TPY lor 6, enter Braddell Rd, 2wards Bishan Rd /Marymount / Lornie Rd; 3) Exit TPY lor 6, via TPY North Flyover, enter Braddell Rd, 2wards Bartley Rd; 4) Exit frm Braddell Rd (come frm Bishan Rd /Marymount / Lornie Rd), via TPY North Flyover, enter TPY lor 6.
  22. Hey TPY, not 4geting e mthly loan instalment. Once keys collected, $$$ starts 2 deduct liao. Unless e 'flat' is fully paid. (no loan frm hdb or bank) Wonder wen e water & elect & gas bill starts 2 take effect? Btw, conservancy charges is payable to Town Council, not hdb. There r stil ID/contractors willing to take-up prj during e CNY period. Though majority of e reno workers r foreigners (go bak hmland to celebrate), there r olso some who r locals who r willing 2 work during CNY period. The main thing is to get e required materials ready b4 e materials suppliers close 4 e yr. Fyi, my keys collection day had further delayed since nov07 til mar08. (not solely bcos of no manpower durin CNY)
  23. Hey renosay, mayb its new, so not many ppl noe & ngage them loh. Think they r not hdb licensed contractor. No accredition to BCA, RADAC, CASETRUST ...

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.