Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

superk888

Members
  • Content Count

    38
  • Joined

  • Last visited

  • Days Won

    3

Everything posted by superk888

  1. some personal opinion: 1. hexagon-shaped cabinet nice but finishing wont be nice. must remember its manual work by carpenter. you will see many joints. 2. what u think of the 2 hexagons on extreme left n right to make it flush with the cabinet. maybe look nicer and not a odd shape protrude plus safety issues. 3. need to check with your ID the intended height for the hexagon. cuz sofa is there. if too low, whoever sits near may bump onto it. like wise whoever enters the house never see may bump onto the edge hope your reno begins well and is going on smoothly : )
  2. been busy with sites. couples of pictures coming up tonight. Thanks
  3. it depends if theres any concealment of wiring works as these are almost $100 per hack to conceal 1 point. $2k looks pretty reasonable but have to see whats inside the electrical quote. 2 bedder can be below $2k
  4. rem cannot get too thick mattress else you gonna get aches everywhere if u sit on bed to use study table.
  5. haha high chance got unit left or high chance say bye bye. havent really gotten time to take a look at the available blocks n units, i just have to b thankful if come sept 13 there's still unit left for me to chop..
  6. with regards to the study table at common bedroom, you intend to sit on the bed and do your work? whats the depth of your table, you may not b able to put those high-back chair. u have probably only about 40cm allowance. hmm 40k pretty high on one side, maybe can fine tune a little bit, small suggestion, check with your ID, ask him can remove the partition wall at side and install laminted frame to blend together with your cabinet and dismantle DB box door to laminate or mirror. also add in shelvings inside so can maximise usage and visual
  7. your electrical way too ex. double point $55 single 50$ hood point oven point $95 hack n conceal $120/hack. nego with your ID
  8. momento paint to create some fun & á slight hints of art feel
  9. Amore EC 4 bedder - owner wishes to hack off the wall between common bedroom & MBR to have a bigger less cluttered feel - partial parquet flooring replacement plus varnishing - carpentry overall 28k pics coming soon..
  10. Another small reno project. Punggol 4room BTO premium Reno under 20k - painting - glass works - false ceiling - electrical - painting - haulage & 2 washing trips Comes with soft closing hinges & Blum runner track for drawer & Blum Aventos
  11. still prefer NE area, stayed at sk for the past 17years.. west side like bukit batok n north area like yishun/woodlands have fewer 2rooms units than punggol wor, else i kinda keen in the yishun, nearby expressway, not so ulu
  12. chances of getting available units for appt on 1 3th Sept i think bit slim. i just submitted another ballot for Aug2017 bto..oh man, the wait is long.. thanks goodness kept myself busy n happy by designing & renovating lucky happy owners of new BTO/Condo. lol anyone collecting or collected keys, remember pm me for good rate... and anyone balloted for Punggol for Feb2017 exercise ? my queue is 719, got chance or not ?
  13. nice, good space planning n color combi.. tv 65" kinda oversize, if can reduce 55'' i am also a future 2room owner, coming sept to choose unit at punggol... side track a little, i am also an ID for 4years, those 2rooms owners feel free to contact me for advices or reno, quote renotalk 2roomer, giving good rate for 2rooms owners like myself thanks everyone.. pm me
  14. check if they do count in the sqft for the entire room or they minus out the sqft for those area that has carpentry. my usual practice is install the entire plae and carpentry will sit on it for nicer overall touch. to minimise risk of scratching, install vinyl the day before carpentry or concurrently install if there are not many carpentry or just lay floor protection again to protect
  15. your bathroom will turn mouldy dirty very soon with painted wall. suggest u DIY by buying those stick on tiles and paste over.
  16. powder coated need see design, the more lattice designs more expensive. wrought iron has non galvanised and galvanised. it cost about $500 for a galvanised wrought iron gate comes with the unit numbers. estimated 10 days.
×