How Long Does It Take To Construct Kitchen Cabinet

Featured Replies

Hi all, need some advise on the typical timeline for a kitchen cabinet to be constucted for a normal 4 room flat kitchen. Just for carpentry work. Any advise are appreciated. Thanks. :yamseng:

A few weeks. They come, take measurements, go back to factory, make, then install and touch up. How "few" depends on the design you have chosen, how fast you can finalise all your selections of laminates and drawers and stuff, and whether they have your specific items in stock (esp. the countertop material).

  • 2 weeks later...
Hi all, need some advise on the typical timeline for a kitchen cabinet to be constucted for a normal 4 room flat kitchen. Just for carpentry work. Any advise are appreciated. Thanks. :yamseng:

really depends how you want ur cabinet to be done up.

budget? as long as you cfm it fast it will be done fast. at least 2 to 3 weeks?

agree it'll be 2-3 weeks fastest. Need to choose laminate. If u do built in hood/hob, best is wait for u to buy then take actual measurement, then they cut the hole.

  • 3 weeks later...

Don't worry about the "hole-cutout" for sink/stove/hob or hood. The carpenters will cut the correct hole to fit them when installing the kitchen cabinets at your home, provided your stuffs are already delivered and ready for their measurement. It's not "pre-cut" at factory. But I think kitchen solidtop or granitetop is precut at factory.

  • 9 months later...

does it still take that long to make a kitchen cabinet.

  • 2 weeks later...
does it still take that long to make a kitchen cabinet.

Its take ard 7 to 9 days to produce aft they had taken measurement, n its take 1 to 2 days to finish install

  • 1 month later...
Its take ard 7 to 9 days to produce aft they had taken measurement, n its take 1 to 2 days to finish install

Correct me if I'm wrong...that means kitchen alone will take roughly ard 10 days?

Within this period, must we ensure that our kitchen stuff such as sink,taps etc has been bought?

Correct me if I'm wrong...that means kitchen alone will take roughly ard 10 days?

Within this period, must we ensure that our kitchen stuff such as sink,taps etc has been bought?

1) they'll take measurement and prefab in their factory. (~6-7days max)

2) They then deliver to your house and install all the pieces together, cut the holes, install hinges (2-3days)

ya, of coz u need to get the sink + tap onsite when they come to (2). Otherwise how they know hole size to cut and also need to install your tap/sink.

1) they'll take measurement and prefab in their factory. (~6-7days max)

2) They then deliver to your house and install all the pieces together, cut the holes, install hinges (2-3days)

ya, of coz u need to get the sink + tap onsite when they come to (2). Otherwise how they know hole size to cut and also need to install your tap/sink.

Thanks hihihi....

the carpenter takes ard 4 days to fab if ur design not complicated., install 1 day complete.

.then depends on your table top is the normal type or tos granite /solid surface, top takes another 3-5 daysto install upon measurement of your kitchen top.

  • 2 weeks later...
the carpenter takes ard 4 days to fab if ur design not complicated., install 1 day complete.

.then depends on your table top is the normal type or tos granite /solid surface, top takes another 3-5 daysto install upon measurement of your kitchen top.

Thanks..:P

  • 3 weeks later...

Kitchen cabinets found at most popular home improvement centers are made of inexpensive and low-grade material.

Designing and building kitchen cabinets takes a lot of time and consideration to do it right. If you are working with a new empty and open room, this helps, but most of us will be starting with a kitchen already full of cabinets - so we have to take all of the measurements available, and even draw a quick diagram of how the room is configured right now to help plan for the layout of utilities.

__________________

bath vanity

modern bathroom vanity

shower enclosures

Create an account or sign in to comment

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.