Skip to content
View in the app

A better way to browse. Learn more.

RenoTalk.com ™

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.

Clementi 3 Rm Renovation

Featured Replies

  • Replies 278
  • Views 62.1k
  • Created
  • Last Reply

Top Posters In This Topic

Day 19

Drill in process

Day19D.jpg

Day19A.jpg

hmm, drilling for wiring? thats like a super long drill bit. :) looks like yours would be done pretty soon...

  • Author
hmm, drilling for wiring? thats like a super long drill bit. :) looks like yours would be done pretty soon...

Yes, now they start to do the electrical work.

Not so soon, the kitchen cabinet still not started.

Jasper already do the measurement,

but the design seem a bit ackward.

The width of each door is different :(

Still waiting for the updated design.

Will keep updating the blog daily :P

  • Author

Day 20

Went out looking for sofa, dining table, tv consel, wardrobe, etc.

But only can get sofa, dining table and wardrobe plus a matress bed.

Don't have time to go to my house.

So, no picture for today :(

  • Author
Where did you get your sofa from?

Finnaly we bought it at Harvey Norman,

as we found the nice dining table there.

And we got persuaded to get the matress and a wardrobe over there too :P

  • Author

Day 22

Cable work 25% done

Day22B.jpg

Common bathroom door installed

Day22A.jpg

Problem with master bathroom door,

the supplier brought wrong colour :(

  • Author
Yes, now they start to do the electrical work.

Not so soon, the kitchen cabinet still not started.

Jasper already do the measurement,

but the design seem a bit ackward.

The width of each door is different :(

Still waiting for the updated design.

Will keep updating the blog daily :P

Jasper told me that the kitchen will be a little bit late.

Scheduled to be done on 20th but now can only be done around 22th :(

wow the bathroom door abit translucent,...hhaha...

dun worry abt the bi fold door, installation can be done in a few hours at most. :)

ur reno very fast already loh... :)

Edited by gimz63251073

  • Author
wow the bathroom door abit translucent,...hhaha...

dun worry abt the bi fold door, installation can be done in a few hours at most. :)

ur reno very fast already loh... :)

Not really translucent enough to get a glimpse of the person inside :P

Installation might be a matter of hours,

but today, they did not bring the master bathroom door yet :(

Maybe it is fast for you, but i really feels that they could do it even faster actually.

Cos they often work half day only.

I hope they will not miss the deadline :)

  • Author

Day 23

Some of the lighting already installed

Day23A.jpg

Day23C.jpg

MCB half installed

Day23B.jpg

Tomorrow schedule is to install toilet bowl and bathroom accesories and finisihing the electrical work.

  • Author

Day 24

Laser to guide the L-box to cover the pipe in living room

Day24B.jpg

Bathroom installation process

Day24A.jpg

Master bathroom

Day24C.jpg

Common bathroom

Day24D.jpg

Common bathroom

Day24D.jpg

the common bathroom mirror looks nice, where u get it & how much? i am unable to find one which is cheap and fit the small place... :(

Hi

Is the master and common toilet sink the same model?

What is the brand and model, how much and where?

thanks.

Create an account or sign in to comment

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.