Skip to content
View in the app

A better way to browse. Learn more.

RenoTalk.com ™

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.

Toa Payoh Blk 79 Kakis

Featured Replies

Hi all

Calling out for help. My HDB shower set is missing and I need some kind soul to donate one set to me if u are changing urs.

As it is very urgent, I need it either today or tomorrow, pls pm me & I will collect from u immediately.

Thanks in advance.

missing as in someone stole it?

  • Replies 7.5k
  • Views 1.2m
  • Created
  • Last Reply

Top Posters In This Topic

Most Popular Posts

  • Blk 79A sushibabe sha08ron justnoop rickyer8 coco_mybibi apple68 soudezne poohnie23 HarryP whiteboxer Skywu Blk 79B bonkitty twotwobravo jen t carelinwen Slog Blk 79C doremi humster / nancy meowie49

Posted Images

A while ago I emailed to our MP of Toa Payoh (Dr Ng E H) on the ERP Gantry at Toa Payoh Lor 6, which I have posted in this forum.

Here's the reply from LTA:

"FEEDBACK ON ELECTRONIC ROAD PRICING GANTRY (ERP) AT TOA PAYOH LORONG 6

FEEDBACK NUMBER: 576855

We refer to your email to the Minister, Mr Ng Eng Hen on 10 January 2008 which was referred to us.

We noted your concern with the ERP gantry erected at Toa Payoh Lorong 6. Please allow us to take this opportunity to share with you the reasons for the decisions taken for our road system.

ERP remains a necessary traffic management tool today as it has helped to keep speeds on our expressways and arterial roads within the optimal range (45-65 km/h on expressways and 20-30 km/h on arterial roads).

You may wish to note that in May 1999, the Land Transport Authority (LTA) announced that the ERP system would be progressively expanded beyond the Restricted Zone (RZ), to relieve traffic congestion along roads in the Outer Cordon area under Phase 2 of the ERP plan. On 6 September 1999, LTA implemented seven gantries along the Outer Cordon and the Central Expressway under ERP Phase 2A, and announced that the implementation of the remaining Phase 2 gantries would depend on the prevailing traffic conditions.

There are 10 locations remaining along the Outer Cordon (under ERP Phase 2B) where ERP has not been implemented. These gantries cover the radial roads leading into the city

The ERP gantry at Toa Payoh Lorong 6 will help to plug a gap in an outer ERP cordon that seals off non-expressway routes into the city. It will only be activated when traffic conditions deteriorate beyond "optimum speed ranges", which is set between 45 km/h and 65 km/h for expressways, and

between 20 km/h and 30 km/h for roads.

An expressway like the Central Expressway (CTE) may have more than one congested stretches due to varying number of vehicles entering and exiting the expressway at different locations. This is the reason why an additional ERP gantry is introduced on the northbound CTE namely to allow for congestion at two different stretches of the northbound CTE to be addressed more specifically and effectively.

Motorists who use the entire stretch of the northbound CTE will be charged for contributing to congestion at both locations. However, those who pass through one congested stretch will be charged only for that location. This is an equitable approach, as all motorists who use and contribute to congestion on the CTE will be charged accordingly.

We will continually review ERP coverage and charges so that our roads remain smooth-flowing. We hope that we have addressed your concerns and seek your understanding in this matter."

Smooth flowing traffic can really be solved by ERP?

Are the Toa Payoh Residents responsible for contributing to congestion on the roads? Of course we are only the minority but have to suffer because other road users bypass Toa Payoh to avoid ERP.

If LTA set up so many ERP Gantries everywhere, then tell me which non-ERP road will not end up being jam?

What's the solution for us?

:yamseng::D:notti::good::D

"If money can solve the problem, then it's not a problem at all."

Which road from Toa Payoh links to the city? I though the PIE exited from TP doesn't link to CTE (City) right? Even if it is linked, are we going to be charged for entering PIE from TP going to the airport?

The only possible linkage will be from TP going to Bradell Road towards the CTE. Anyway, instead of installing ERP, maybe the Authority can consider widening the Bradell Road? Currently there are only 2 lanes on Bradell Road leading to CTE AMK and City...

missing as in someone stole it?

Not sure. They took it out & put in the storeroom. No one took charge of it & when we wanted to put it back, we couldn't find it. Not sure stolen or thrown out by mistake when they clear the debris.

alister, sorry can't be of any help...I am still keeping mine...

Hope u found someone who doesnt want the shower set...:dancingqueen:

Hi Zanie,

Does the quote include the downlights too?

Thanks...

Hi Gadgetman,

The quote does not include any lights at all.... Just installation

alister, sorry can't be of any help...I am still keeping mine...

Hope u found someone who doesnt want the shower set...:dancingqueen:

No problem, my ID has already asked me to take a look at Indulge. If he cannot find a replacement, he will replace it for me FOC.

Hey zanie98,

how reno status?

Wat u'd been quoted shd b jus e runners only.

Fyi, normally, the drawers is made of solid plywood, white pvc finish internally, laminate finish externally, ABS trimming at 4-sides of cabinet door, alum recessed handle or 'designers' handle.

To mi, i find $50 for a complete drawer is cheap? :dancingqueen:

Hey vowsh,

read thru e past few pages. There's a discussion on e haulage thingy.

4rm-$800-$900

5rm-$1000

-) Both payable to e term-contractor who sub e whole haulage contract for blk 79.

-) Town council fees is another sum (<$200), w or w/o hacking, b'cos TC provided e debis collection tank oleady. See whether izit include in your quotation from ID.

Correct mi if i'm wrong.

:dancingqueen:

Confirmed liao. $800 haulage for my 4rm.

No problem, my ID has already asked me to take a look at Indulge. If he cannot find a replacement, he will replace it for me FOC.

That's very generous of your ID! It is better off getting a brand new set. If you have left them lying around like mine, they would have been badly scratched by now already... :dancingqueen:

hi anyone else also got HL letter from Blk A??

Any updates for Blk A?? Didnt see any updates since congee77 post.....

still very anxious... checking my letterbox everyday....

today is the last day of the audit right?

hi anyone else also got HL letter from Blk A??

Any updates for Blk A?? Didnt see any updates since congee77 post.....

still very anxious... checking my letterbox everyday....

today is the last day of the audit right?

After audit, they still need to do hand over and paper work..I already mentally told myself that it will be after CNY.. :sport-smiley-004:

Chase them hard... chase them all the way... keep calling them... harass them.... send them pighead...

By the way, we just emailed them twice. :sport-smiley-004:

hi anyone else also got HL letter from Blk A??

Any updates for Blk A?? Didnt see any updates since congee77 post.....

still very anxious... checking my letterbox everyday....

today is the last day of the audit right?

Edited by congee77

hi guys, one stupid Q: why do IDs always quote kerbs for the fridge and washing machine...do we need those esp. if using front load washing machine?

i'm thinking of using separate contractors. 1 to do floor, 1 do kitchen and sink stuff..what do you guys think?

What is the most economical way to do the kitchen sink without cabinets and the fancy stuff har? hmm..

lastly. do you ask the ID what brand of tiles/ hardness and stuff? i heard it's cheaper to get from the distributors in singapore directly...

hi guys, one stupid Q: why do IDs always quote kerbs for the fridge and washing machine...do we need those esp. if using front load washing machine?

i'm thinking of using separate contractors. 1 to do floor, 1 do kitchen and sink stuff..what do you guys think?

What is the most economical way to do the kitchen sink without cabinets and the fancy stuff har? hmm..

lastly. do you ask the ID what brand of tiles/ hardness and stuff? i heard it's cheaper to get from the distributors in singapore directly...

Actually not require to build the base.

If u got the time to coordinate diff contractors is ok but the overall cost may not neccessary be cheaper coz they dont earn much for small item.

The tile price are not much diff unless u take those >$10psf ones ( granite or marble). Granite & marble are natural stone, model may be same but pattern can vary a lot.

ID get tiles from main distribuer and usally can get better pricing than u buy yourself.

hi guys, one stupid Q: why do IDs always quote kerbs for the fridge and washing machine...do we need those esp. if using front load washing machine?

i'm thinking of using separate contractors. 1 to do floor, 1 do kitchen and sink stuff..what do you guys think?

What is the most economical way to do the kitchen sink without cabinets and the fancy stuff har? hmm..

lastly. do you ask the ID what brand of tiles/ hardness and stuff? i heard it's cheaper to get from the distributors in singapore directly...

Actually not require to build the base.

If u got the time to coordinate diff contractors is ok but the overall cost may not neccessary be cheaper coz they dont earn much for small item.

The tile price are not much diff unless u take those >$10psf ones ( granite or marble). Granite & marble are natural stone, model may be same but pattern can vary a lot.

ID get tiles from main distribuer and usally can get better pricing than u buy yourself.

Hey Happy!,

wat vowsh mentioned is rite.

But if u'r doin e normal kit cabinet, (not e suspended type with recessed light), it is advisable 2 construct e 50mm high concrete base with side tiling. If not, ur lower cabinets wil b sittin directly on e kit floor tiles.

For WM & fridge, can buy off-e-shelf type of base support, 4 nos. (dunoe wats its called). Got plastic type & concrete type.

Most economical way to consruct e kit sink, shd b 4 vertical supports at 4 corners with bracing, solid ply (cut hole to house sink) or horizontal bracing to hole sink. Connect e inlet & oulet pipes. No cabinet below sink, dat means can see e bottle-trap of sink & beyond :dunno::) !!

Ngaging individual contractors for e respective works? To mi, basically, u need 2 main contractors.

1) Oversee & coordinate all works. (get hdb licensed contractor)

- flooring

- elect

- piping

- false ceiling / L-box

- painting

- window grilles

- misc labour (eg. fix lighting & other accessories)

- haulage & debris clearing

2) All carpentry (get e co dat specialise in carpentry, pay more get better quality)

- kit cabinets

- wardrobe

- shelves.

e above r my personal assumptions base on simple reno.

:dancingqueen:

Edited by jaCKY777

Hi anybody using blum system drawers? I have extra dividers to sell at a cheaper price....

Hey Liana79B, can i ask if you got the blum system yourself and ask the workers to install them or you get them via ID??? how much you spent??? :notti:

Create an account or sign in to comment

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.