Skip to content
View in the app

A better way to browse. Learn more.

RenoTalk.com ™

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.

Revamp Of A 40yo 3rm Pigeonhole...

Featured Replies

  • Author

Meanwhile, plumber complete the kitchen sink works + mounting of accessories...

IMG_1376.jpg

New bedroom doors arrived...

IMG_1374.jpg

Test-fitting ok...

IMG_1379.jpg

Done for MBR door...

IMG_1383.jpg

20min later CR door done...

IMG_1391.jpg

  • Replies 451
  • Views 203.3k
  • Created
  • Last Reply

Top Posters In This Topic

Most Popular Posts

  • Up till now, the sequence is like this: - Demo (9 Sept, 13 Sept) - Clearing (14 Sept) - Upload materials (14 Sept) - Tiling bath/WC floor, kitchen wall, install door frame (15 Sept) - Tiling liv

  • Try the shophouses at 277 Kranji Way... plenty of hardware shops selling....make sure you check with your carpenter what is the depth of the drawers and get accordingly... I'm using the 560H (tandem

  • Author

Ceiling guys working on constructing pelmet to cover the glassdoor tracks...

IMG_1380.jpg

and touching up...

IMG_1387.jpg

Carpenter taking aim at the dishrack telescopic hydraulic extender...

IMG_1388.jpg

while his assistant puttying the nail-holes on the drawer...

IMG_1392.jpg

  • Author

Old main door removed...

IMG_1398.jpg

Test-fitted with new one...

IMG_1399.jpg

Coring of holes...

IMG_1406.jpg

IMG_1409.jpg

Chiseling recessed area for the deadbolt...

IMG_1412.jpg

  • Author

First coat of varnish on MBR veneer door...

IMG_1418.jpg

IMG_1421.jpg

Sanding off the basecoat of main nyatoh door...

IMG_1422.jpg

Completion...

IMG_1435.jpg

  • Author

Rotating TV console arrived... :D

IMG_1382.jpg

Marking out...

IMG_1401.jpg

on false ceiling...

IMG_1404.jpg

and test-fitting...

IMG_1414.jpg

Coring thru rotating platform...

IMG_1429.jpg

Edited by neubie

  • Author

TV console done... :P

Front view

IMG_1432.jpg

Rear view

IMG_1433.jpg

Recap the original draft...some slight changes to the movable console such that it can only turn 180 clockwise and CCW and will not keep turning until the HDMI/VGA/power/coax cables get twisted and damaged .... :good:

tvconsole.jpg

Test-dropped VGA cable into lobang.... came out of the shelf nicely... :rolleyes:

IMG_1436.jpg

  • Author
nice reno!! cant wait for the final pics!

reno is almost completed, nothing really much to post for a 3rm liao, still got to DIY some touchup and hope it will not be back-breaking.... :unsure:

  • Author
Wow !!! Your renovation is super fast!!!

is considered slow by my main con's standards liao.... but honestly speaking, he has got a team of efficient subcons working for him for a long time, so his subcons know his standards and character...

his record for 70k+ complete teardown of EM flat is one month.... even includes rebuilding glass staircase.... :) :) :)

Edited by neubie

neubie, nice reno. You are almost always there to take all the photos.... Envy....

  • Author
neubie, nice reno. You are almost always there to take all the photos.... Envy....

Cos I'm quite a hands-on person who is curious about how it's done, at the same time "supervising" n checking the subcon for workmanship, correcting mistakes on the spot n ensure problems dun snowball until beyond economical rework. :)

If dun have the luxury of time, a few milestones are impt to be present, eg, carpentry, plumbing, aircon, electrical wiring. Others need not really be present also nvm. ;p

Cos I'm quite a hands-on person who is curious about how it's done, at the same time "supervising" n checking the subcon for workmanship, correcting mistakes on the spot n ensure problems dun snowball until beyond economical rework. :)

If dun have the luxury of time, a few milestones are impt to be present, eg, carpentry, plumbing, aircon, electrical wiring. Others need not really be present also nvm. ;p

Well said, Sir. And denoting of your Hall extension!

I just paid my site a visit, was glad that the subcon consulted me some minor details on the measurements.

Happy to see your completion of your apt neubie ( you have an efficient reno team), just need the fittings and you are ready to move in.

  • Author
Well said, Sir. And denoting of your Hall extension!

I just paid my site a visit, was glad that the subcon consulted me some minor details on the measurements.

Happy to see your completion of your apt neubie ( you have an efficient reno team), just need the fittings and you are ready to move in.

Today is DIY day :D :D :D got my hands dirty and start puttying the gaps in grout lines of my LR...

My tiler was asked by my main con to come do touch up on wednesday... but told me he can't do much as there are so many things being done (see previous posts)... but he gave me some colored cement powder for the LR and white powder for the kitchen, briefed me on how to mix......

One might have thought the tiler should come another day while nobody was working in the flat, but then again, i would prefer to do some minor touchup myself as I can focus on picking out the areas better (rather than leaving it to them)...

first time trying this... agar-agar mix one spatula of colored cement powder to few rinse of water, mix well and gotten to a gooey paste, consistency not too thick (can't stick properly and fill the gap) nor too liquid (can't fill gaps), so long the consistency is somewhat like cream cheese at room temperature, should be able to fill the gaps w/o problems.... :P

IMG_1441.jpg

Actually it's quite fun to DIY this, much like spreading butter or cream cheese..... using a scraper, use the width and putty along the lines... give it few hours to dry and then scrape/wipe off excess dried cement powder, even the door frame gaps are puttied nicely....

IMG_1442.jpg

IMG_1443.jpg

Edited by neubie

Today is DIY day :D :D :D got my hands dirty and start puttying the gaps in grout lines of my LR...

My tiler was asked by my main con to come do touch up on wednesday... but told me he can't do much as there are so many things being done (see previous posts)... but he gave me some colored cement powder for the LR and white powder for the kitchen, briefed me on how to mix......

One might have thought the tiler should come another day while nobody was working in the flat, but then again, i would prefer to do some minor touchup myself as I can focus on picking out the areas better (rather than leaving it to them)...

first time trying this... agar-agar mix one spatula of colored cement powder to few rinse of water, mix well and gotten to a gooey paste, consistency not too thick (can't stick properly and fill the gap) nor too liquid (can't fill gaps), so long the consistency is somewhat like cream cheese at room temperature, should be able to fill the gaps w/o problems.... :P

IMG_1441.jpg

Actually it's quite fun to DIY this, much like spreading butter or cream cheese..... using a scraper, use the width and putty along the lines... give it few hours to dry and then scrape/wipe off excess dried cement powder, even the door frame gaps are puttied nicely....

IMG_1442.jpg

IMG_1443.jpg

Hi was very impressed on your renovation, would u mind sharing to me the qoutation and ur ID to me, as we are looking for renovation company to do our 3 room house too.. Thank you so much!!! my email: yioboon@yahoo.com

Create an account or sign in to comment

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.